PREPARING ROW
|
STA
|
5.800
|
$7,500.000
|
$8,000.000
|
$102,859.460
|
$67,241.000
|
$52,137.930
|
$4,500.000
|
$139,724.860
|
$135,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
3,362.000
|
$20.000
|
$25.000
|
$30.000
|
$19.000
|
$21.000
|
$28.000
|
$20.530
|
$22.000
|
|
|
REMOV CONC (CURB)
|
LF
|
2,776.000
|
$15.000
|
$11.000
|
$6.000
|
$12.000
|
$21.000
|
$12.000
|
$8.510
|
$2.200
|
|
|
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
|
SY
|
3,925.000
|
$15.000
|
$11.000
|
$16.000
|
$20.000
|
$5.250
|
$20.000
|
$5.960
|
$11.000
|
|
|
EXCAV (ROADWAY & CHANNEL)
|
CY
|
835.000
|
$50.000
|
$58.000
|
$36.000
|
$128.000
|
$50.000
|
$45.000
|
$21.270
|
$90.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
364.000
|
$30.000
|
$77.000
|
$25.000
|
$10.000
|
$75.000
|
$65.000
|
$22.240
|
$80.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,332.000
|
$5.000
|
$5.000
|
$2.500
|
$10.000
|
$5.250
|
$2.500
|
$3.400
|
$8.500
|
|
|
BLOCK SODDING
|
SY
|
8,034.000
|
$10.000
|
$5.000
|
$5.000
|
$3.950
|
$5.250
|
$4.740
|
$5.670
|
$6.700
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
8,034.000
|
$1.000
|
$0.600
|
$0.300
|
$0.550
|
$0.550
|
$0.660
|
$0.230
|
$0.550
|
|
|
VEGETATIVE WATERING
|
TGL
|
562.000
|
$26.000
|
$60.000
|
$21.000
|
$31.000
|
$3.150
|
$68.340
|
$1.130
|
$98.000
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$20,000.000
|
$20,000.000
|
$15,000.000
|
$18,775.570
|
$19,000.000
|
$22,530.680
|
$57,853.490
|
$18,775.570
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
45.000
|
$220.000
|
$475.000
|
$350.000
|
$306.000
|
$450.000
|
$367.200
|
$386.480
|
$310.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
2,723.000
|
$14.000
|
$19.000
|
$10.000
|
$25.000
|
$10.000
|
$17.000
|
$5.100
|
$7.600
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
545.000
|
$10.000
|
$11.000
|
$12.000
|
$10.000
|
$10.500
|
$12.000
|
$5.530
|
$8.800
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
626.000
|
$150.000
|
$160.000
|
$175.000
|
$153.000
|
$168.000
|
$183.600
|
$178.450
|
$155.000
|
|
|
CONC PVMT (CRCP) (8")
|
SY
|
2,492.000
|
$140.000
|
$147.000
|
$80.000
|
$70.000
|
$125.000
|
$125.000
|
$173.870
|
$87.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,174.000
|
$260.000
|
$220.000
|
$231.000
|
$130.000
|
$222.000
|
$199.200
|
$201.990
|
$137.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
390.000
|
$22.000
|
$25.000
|
$22.000
|
$1.000
|
$12.000
|
$29.990
|
$8.510
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
769.000
|
$48.000
|
$25.000
|
$47.000
|
$47.000
|
$105.000
|
$42.940
|
$30.510
|
$56.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
272.000
|
$140.000
|
$190.000
|
$200.000
|
$118.250
|
$175.000
|
$153.530
|
$196.900
|
$130.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,124.000
|
$285.000
|
$300.000
|
$290.000
|
$218.900
|
$300.000
|
$222.500
|
$297.270
|
$229.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
136.800
|
$1,500.000
|
$1,300.000
|
$850.000
|
$1,800.000
|
$1,500.000
|
$1,620.000
|
$1,145.520
|
$784.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
128.600
|
$1,800.000
|
$1,000.000
|
$1,100.000
|
$1,800.000
|
$1,500.000
|
$1,305.000
|
$1,241.130
|
$1,122.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
32.700
|
$1,750.000
|
$2,100.000
|
$1,500.000
|
$2,250.000
|
$3,000.000
|
$1,530.000
|
$2,334.630
|
$1,600.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
28,160.000
|
$30.000
|
$27.000
|
$23.000
|
$33.000
|
$25.000
|
$28.420
|
$24.940
|
$28.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
710.400
|
$750.000
|
$520.000
|
$500.000
|
$405.000
|
$400.000
|
$850.000
|
$527.080
|
$586.000
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
5,720.000
|
$19.000
|
$13.000
|
$15.000
|
$10.000
|
$15.000
|
$25.000
|
$15.080
|
$14.100
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,249.320
|
$220.000
|
$195.000
|
$195.000
|
$280.000
|
$225.000
|
$182.200
|
$220.450
|
$189.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.600
|
$700.000
|
$900.000
|
$700.000
|
$850.000
|
$900.000
|
$745.000
|
$535.570
|
$691.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
891.000
|
$160.000
|
$155.000
|
$200.000
|
$250.000
|
$222.000
|
$175.380
|
$156.220
|
$173.000
|
|
|
RAIL (TY C223)(HPC)
|
LF
|
643.200
|
$400.000
|
$215.000
|
$152.000
|
$282.000
|
$222.000
|
$150.000
|
$96.380
|
$161.000
|
|
|
RAIL (TY PR11)
|
LF
|
496.000
|
$190.000
|
$95.000
|
$125.000
|
$118.000
|
$155.000
|
$144.000
|
$147.810
|
$78.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
250.000
|
$140.000
|
$130.000
|
$145.000
|
$220.000
|
$175.000
|
$150.000
|
$138.050
|
$123.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$140,000.000
|
$100,000.000
|
$105,000.000
|
$120,000.000
|
$210,000.000
|
$150,000.000
|
$236,545.890
|
$600,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$729,300.000
|
$722,000.000
|
$750,000.000
|
$780,000.000
|
$787,285.970
|
$1,439,460.000
|
$806,231.820
|
$760,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$4,000.000
|
$13,250.000
|
$13,060.000
|
$31,500.000
|
$4,000.000
|
$29,777.530
|
$35,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$25,000.000
|
$19,000.000
|
$12,000.000
|
$15,750.000
|
$12,000.000
|
$19,284.500
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
16.000
|
$175.000
|
$150.000
|
$200.000
|
$200.000
|
$315.000
|
$990.000
|
$170.160
|
$500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$33.000
|
$53.000
|
$36.000
|
$50.540
|
$35.000
|
$60.650
|
$66.020
|
$50.540
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$11.000
|
$21.500
|
$10.000
|
$20.480
|
$10.000
|
$24.580
|
$51.050
|
$20.480
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,535.000
|
$3.000
|
$8.000
|
$4.000
|
$6.000
|
$5.250
|
$5.410
|
$5.670
|
$4.510
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,535.000
|
$1.000
|
$4.000
|
$1.100
|
$1.470
|
$1.100
|
$1.760
|
$1.130
|
$1.470
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
65.000
|
$8.000
|
$20.000
|
$8.000
|
$11.450
|
$16.000
|
$13.740
|
$5.670
|
$11.450
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
65.000
|
$2.000
|
$10.000
|
$2.000
|
$4.290
|
$4.000
|
$5.150
|
$1.130
|
$4.290
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,944.000
|
$110.000
|
$108.000
|
$100.000
|
$90.000
|
$75.000
|
$100.080
|
$79.310
|
$100.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,080.000
|
$80.000
|
$38.000
|
$65.000
|
$60.000
|
$30.000
|
$27.130
|
$53.330
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
7,290.000
|
$18.000
|
$16.000
|
$15.000
|
$9.000
|
$10.000
|
$9.620
|
$4.050
|
$6.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
4,080.000
|
$20.000
|
$16.000
|
$9.000
|
$11.000
|
$15.000
|
$12.000
|
$11.660
|
$6.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,189.000
|
$20.000
|
$19.000
|
$12.000
|
$14.000
|
$9.000
|
$35.280
|
$6.810
|
$12.000
|
|
|
CONC CURB (DOWELED)
|
LF
|
3,938.000
|
$20.000
|
$32.000
|
$35.000
|
$23.000
|
$10.000
|
$32.760
|
$11.060
|
$16.000
|
|
|
CONC MEDIAN
|
SY
|
282.000
|
$200.000
|
$160.000
|
$220.000
|
$125.000
|
$315.000
|
$132.300
|
$93.590
|
$81.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$50.000
|
$24.000
|
$50.000
|
$22.000
|
$23.100
|
$26.400
|
$58.700
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,100.000
|
$1,870.000
|
$2,100.000
|
$2,285.130
|
$2,735.620
|
$2,130.000
|
$1,938.090
|
$2,550.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,600.000
|
$1,155.000
|
$1,700.000
|
$1,100.000
|
$1,155.000
|
$1,320.000
|
$1,276.180
|
$1,100.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,000.000
|
$710.000
|
$1,000.000
|
$675.000
|
$708.750
|
$810.000
|
$879.710
|
$675.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$6.000
|
$4.000
|
$8.000
|
$3.500
|
$3.680
|
$4.200
|
$2.550
|
$3.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$330.000
|
$265.000
|
$300.000
|
$250.000
|
$412.870
|
$300.000
|
$212.700
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,200.000
|
$3,000.000
|
$3,000.000
|
$2,860.000
|
$3,003.000
|
$3,432.000
|
$2,809.300
|
$2,860.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$370.000
|
$265.000
|
$380.000
|
$250.000
|
$262.500
|
$300.000
|
$253.610
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
9.000
|
$2,000.000
|
$2,200.000
|
$1,500.000
|
$1,235.000
|
$1,478.930
|
$1,482.000
|
$1,442.080
|
$800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,300.000
|
$1,200.000
|
$900.000
|
$825.000
|
$739.470
|
$990.000
|
$850.790
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$10,000.000
|
$9,000.000
|
$7,075.000
|
$10,728.860
|
$8,490.000
|
$11,945.040
|
$8,500.000
|
|
|
ITS GND BOX TY 2 (603636)
|
EA
|
1.000
|
$2,000.000
|
$4,800.000
|
$6,500.000
|
$25,000.000
|
$3,150.000
|
$5,800.000
|
$2,467.280
|
$4,500.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
1.000
|
$1,000.000
|
$1,600.000
|
$1,800.000
|
$5,000.000
|
$525.000
|
$1,740.000
|
$377.010
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$460.000
|
$1,500.000
|
$700.000
|
$650.000
|
$735.000
|
$1,074.000
|
$645.190
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$152.000
|
$350.000
|
$125.000
|
$25.000
|
$115.500
|
$162.000
|
$97.840
|
$179.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
9.000
|
$15.000
|
$21.000
|
$35.000
|
$20.000
|
$21.000
|
$24.000
|
$28.080
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
9.000
|
$26.000
|
$26.000
|
$60.000
|
$25.000
|
$26.250
|
$30.000
|
$28.080
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$80.000
|
$55.000
|
$70.000
|
$50.000
|
$52.500
|
$60.000
|
$64.220
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
3,010.000
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$3.150
|
$3.600
|
$0.790
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
633.000
|
$2.000
|
$2.800
|
$1.000
|
$2.650
|
$3.150
|
$3.600
|
$0.790
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
6,777.000
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.840
|
$2.100
|
$0.790
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,562.000
|
$1.000
|
$2.450
|
$1.200
|
$2.300
|
$2.100
|
$2.400
|
$1.210
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
66.000
|
$7.000
|
$8.300
|
$14.000
|
$7.900
|
$15.750
|
$18.000
|
$13.030
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
14.000
|
$120.000
|
$265.000
|
$25.000
|
$250.000
|
$351.750
|
$402.000
|
$21.240
|
$335.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
6.000
|
$130.000
|
$265.000
|
$25.000
|
$250.000
|
$525.000
|
$600.000
|
$23.600
|
$500.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
16,356.000
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.840
|
$2.100
|
$0.790
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
45.000
|
$10.000
|
$10.000
|
$1.500
|
$2.000
|
$4.580
|
$1.440
|
$1.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
412.000
|
$1.000
|
$1.400
|
$1.000
|
$1.300
|
$5.250
|
$6.000
|
$1.020
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
5.000
|
$200.000
|
$190.000
|
$120.000
|
$178.000
|
$210.000
|
$240.000
|
$121.050
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$200.000
|
$230.000
|
$200.000
|
$215.000
|
$367.500
|
$420.000
|
$181.570
|
$350.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
18,002.000
|
$1.000
|
$0.250
|
$0.300
|
$0.240
|
$0.530
|
$0.600
|
$0.230
|
$0.500
|
|
|
PAVEMENT SLER 8"
|
LF
|
412.000
|
$1.000
|
$0.400
|
$0.400
|
$0.350
|
$1.050
|
$1.200
|
$0.290
|
$1.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
5.000
|
$62.000
|
$40.000
|
$35.000
|
$35.000
|
$52.500
|
$60.000
|
$30.790
|
$50.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
5.000
|
$74.000
|
$45.000
|
$38.000
|
$43.000
|
$63.000
|
$72.000
|
$34.200
|
$60.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
3,906.000
|
$1.000
|
$1.000
|
$1.000
|
$0.870
|
$2.100
|
$2.400
|
$0.840
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
6,633.000
|
$1.000
|
$1.000
|
$1.000
|
$0.870
|
$1.580
|
$1.800
|
$0.840
|
$1.500
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,463.000
|
$1.000
|
$1.000
|
$1.000
|
$0.870
|
$1.580
|
$1.800
|
$0.790
|
$1.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
196.000
|
$6.000
|
$6.500
|
$14.000
|
$6.000
|
$10.500
|
$12.000
|
$12.820
|
$10.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
10,034.000
|
$0.500
|
$0.550
|
$0.500
|
$0.500
|
$1.370
|
$1.200
|
$0.510
|
$1.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
205.000
|
$1.200
|
$1.000
|
$1.000
|
$0.930
|
$5.250
|
$2.400
|
$1.020
|
$2.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
2.000
|
$75.000
|
$55.000
|
$18.000
|
$52.000
|
$210.000
|
$180.000
|
$15.520
|
$150.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
2.000
|
$75.000
|
$64.000
|
$20.000
|
$61.000
|
$262.500
|
$240.000
|
$17.240
|
$200.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
44,778.000
|
$1.000
|
$0.050
|
$0.200
|
$0.020
|
$0.210
|
$0.240
|
$0.180
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,974.000
|
$1.000
|
$0.100
|
$0.300
|
$0.090
|
$1.050
|
$1.200
|
$0.240
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
66.000
|
$1.000
|
$0.700
|
$3.000
|
$0.660
|
$3.150
|
$3.600
|
$2.750
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
19.000
|
$40.000
|
$16.000
|
$30.000
|
$15.500
|
$42.000
|
$48.000
|
$24.650
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
11.000
|
$45.000
|
$19.000
|
$30.000
|
$18.500
|
$52.500
|
$60.000
|
$27.400
|
$50.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
9.000
|
$300.000
|
$2,000.000
|
$5,000.000
|
$750.000
|
$787.500
|
$287.540
|
$76.570
|
$750.000
|
|
Totals: |
$8,152,678.400
|
$7,221,685.350
|
$7,574,410.468
|
$7,827,476.300
|
$7,888,000.004
|
$7,953,839.844
|
$8,144,562.637
|
$8,195,889.520
|