PREPARING ROW
|
STA
|
8.000
|
$5,000.000
|
$6,300.000
|
$10,000.000
|
$4,000.000
|
$20,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,686.000
|
$8.000
|
$13.650
|
$9.750
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
759.000
|
$9.000
|
$5.250
|
$2.100
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
389.000
|
$16.000
|
$11.550
|
$9.850
|
$8.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,629.000
|
$15.000
|
$15.750
|
$21.750
|
$27.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
310.000
|
$30.000
|
$15.750
|
$27.200
|
$19.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
451.000
|
$1.500
|
$5.250
|
$4.400
|
$10.000
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
451.000
|
$5.000
|
$6.300
|
$5.500
|
$10.000
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
10.000
|
$15.000
|
$210.000
|
$660.000
|
$100.000
|
$500.000
|
|
|
PROOF ROLLING
|
HR
|
16.000
|
$125.000
|
$157.500
|
$165.000
|
$660.000
|
$150.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
578.000
|
$5.000
|
$5.500
|
$4.950
|
$5.200
|
$8.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
3,320.000
|
$85.000
|
$84.000
|
$73.700
|
$77.000
|
$75.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-28
|
TON
|
332.000
|
$90.000
|
$126.000
|
$136.400
|
$143.000
|
$130.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,331.000
|
$3.000
|
$7.350
|
$6.900
|
$8.000
|
$10.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
4,932.000
|
$20.000
|
$20.000
|
$21.600
|
$22.000
|
$20.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
20.000
|
$300.000
|
$506.950
|
$531.600
|
$532.000
|
$650.000
|
|
|
CL B CONC (FLUME)
|
CY
|
80.000
|
$420.000
|
$630.000
|
$425.850
|
$750.000
|
$550.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
4,002.000
|
$50.000
|
$84.000
|
$65.000
|
$70.000
|
$58.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3.000
|
$450.000
|
$945.000
|
$1,500.000
|
$750.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.000
|
$500.000
|
$630.000
|
$500.000
|
$900.000
|
$500.000
|
|
|
RAIL (TY SSTR)
|
LF
|
610.000
|
$50.000
|
$63.000
|
$100.000
|
$240.000
|
$165.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$170,000.000
|
$191,000.000
|
$208,055.000
|
$157,500.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$15,000.000
|
$21,000.000
|
$10,000.000
|
$25,000.000
|
$8,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$25.000
|
$21.400
|
$22.550
|
$50.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$10.700
|
$9.900
|
$15.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,267.000
|
$3.000
|
$1.550
|
$1.850
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,267.000
|
$1.000
|
$0.110
|
$0.550
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
50.000
|
$5.000
|
$3.750
|
$4.950
|
$15.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
50.000
|
$1.500
|
$1.070
|
$2.200
|
$5.000
|
$12.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,446.000
|
$75.000
|
$98.000
|
$125.000
|
$250.000
|
$78.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,960.000
|
$30.000
|
$7.350
|
$36.000
|
$12.000
|
$25.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,120.000
|
$5.000
|
$4.200
|
$8.000
|
$9.000
|
$20.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,960.000
|
$30.000
|
$5.250
|
$12.000
|
$10.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
140.000
|
$30.000
|
$31.500
|
$50.000
|
$47.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
650.000
|
$30.000
|
$23.430
|
$24.100
|
$27.500
|
$35.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$800.000
|
$2,728.500
|
$2,800.000
|
$2,722.500
|
$1,850.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$2,081.350
|
$1,815.000
|
$2,062.500
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,200.000
|
$1,096.750
|
$1,130.000
|
$1,369.500
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
3.000
|
$12,000.000
|
$22,000.000
|
$25,000.000
|
$21,340.000
|
$12,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,700.000
|
$3,150.000
|
$1,500.000
|
$2,750.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
3.000
|
$1,000.000
|
$1,575.000
|
$1,200.000
|
$1,100.000
|
$2,500.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (TRACC)
|
EA
|
1.000
|
$25,000.000
|
$31,500.000
|
$30,000.000
|
$28,985.000
|
$16,500.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,085.000
|
$1.500
|
$1.220
|
$1.250
|
$1.300
|
$3.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
150.000
|
$25.000
|
$30.420
|
$31.250
|
$32.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$600.000
|
$841.160
|
$865.000
|
$865.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$700.000
|
$1,355.080
|
$1,395.000
|
$1,394.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$150.000
|
$284.890
|
$295.000
|
$293.000
|
$250.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$25,000.000
|
$18,085.140
|
$18,600.000
|
$18,600.000
|
$40,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
3.000
|
$30.000
|
$26.750
|
$27.500
|
$27.500
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,707.000
|
$1.000
|
$1.610
|
$1.500
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,228.000
|
$1.000
|
$1.610
|
$1.500
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
715.000
|
$1.500
|
$1.070
|
$2.400
|
$1.100
|
$6.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
588.000
|
$3.000
|
$3.420
|
$4.500
|
$3.500
|
$6.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
428.000
|
$3.500
|
$3.420
|
$4.750
|
$3.500
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$150.000
|
$160.500
|
$360.000
|
$150.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$150.000
|
$219.350
|
$600.000
|
$205.000
|
$250.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
208.000
|
$0.500
|
$5.350
|
$1.500
|
$6.000
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
943.000
|
$1.000
|
$7.490
|
$7.500
|
$8.000
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
1,336.000
|
$1.000
|
$7.490
|
$5.250
|
$8.000
|
$2.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
69.000
|
$3.500
|
$7.490
|
$22.500
|
$7.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,092.000
|
$0.750
|
$0.540
|
$1.300
|
$0.600
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
715.000
|
$0.750
|
$1.070
|
$2.250
|
$1.100
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$13,000.000
|
$7,350.000
|
$20,000.000
|
$15,000.000
|
$12,500.000
|
|
|
FO CBL (72 SMF)
|
LF
|
10,500.000
|
$4.000
|
$8.850
|
$9.100
|
$8.800
|
$10.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
3.000
|
$2,300.000
|
$1,322.250
|
$1,360.000
|
$1,360.000
|
$3,000.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
228.000
|
$60.000
|
$33.520
|
$34.450
|
$34.500
|
$500.000
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
9,210.000
|
$2.000
|
$1.270
|
$1.310
|
$1.300
|
$3.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
590.000
|
$18.000
|
$26.550
|
$27.300
|
$27.000
|
$65.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
810.000
|
$27.000
|
$30.630
|
$31.500
|
$31.000
|
$85.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$300.000
|
$420.000
|
$250.000
|
$230.000
|
$250.000
|
|
Totals: |
$1,740,682.250
|
$1,969,394.110
|
$2,080,559.200
|
$2,312,625.800
|
$2,361,244.000
|