|
|
MOBILIZATION (CALLOUT)
|
EA
|
24.000
|
$1,100.000
|
$1.000
|
$500.000
|
$3,500.000
|
$1,500.000
|
$5,000.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
4.000
|
$1,900.000
|
$1.000
|
$1,000.000
|
$5,000.000
|
$10,000.000
|
$15,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
10,000.000
|
$25.000
|
$1.000
|
$35.000
|
$27.000
|
$33.800
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$1,354.870
|
$1,500.000
|
$2,000.000
|
$1,800.000
|
$2,200.000
|
$2,500.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
150.000
|
$12.000
|
$10.000
|
$1.000
|
$6.000
|
$10.000
|
$17.000
|
|
|
SHORT RADIUS
|
LF
|
500.000
|
$43.860
|
$25.000
|
$40.000
|
$40.000
|
$65.000
|
$65.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$450.000
|
$500.000
|
$100.000
|
$100.000
|
$1,500.000
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
70.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
$1,350.000
|
$2,100.000
|
$2,000.000
|
|
|
MTL BM GD FEN TRANS (THRIE-BEAM)(OPT1)
|
EA
|
10.000
|
$2,800.000
|
$1,000.000
|
$300.000
|
$2,200.000
|
$2,780.000
|
$4,000.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$768.750
|
$1.000
|
$100.000
|
$700.000
|
$1,200.000
|
$800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$1.000
|
$100.000
|
$1.000
|
$3.000
|
$3.000
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
50.000
|
$250.000
|
$100.000
|
$100.000
|
$250.000
|
$500.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
1.000
|
$722.600
|
$1,000.000
|
$100.000
|
$250.000
|
$1,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$325.000
|
$500.000
|
$100.000
|
$250.000
|
$500.000
|
$1,000.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
1.000
|
$2,000.000
|
$1.000
|
$4,500.000
|
$4,750.000
|
$4,000.000
|
$4,000.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
1.000
|
$2,650.000
|
$1.000
|
$4,500.000
|
$4,750.000
|
$4,500.000
|
$5,000.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
100.000
|
$9.000
|
$5.000
|
$50.000
|
$3.000
|
$5.000
|
$10.000
|
|
|
CHAIN LINK FENCE (REPAIR) (4')
|
LF
|
500.000
|
$15.000
|
$25.000
|
$50.000
|
$12.000
|
$18.000
|
$36.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
30,000.000
|
$22.500
|
$18.000
|
$30.000
|
$25.000
|
$35.600
|
$18.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
150.000
|
$26.000
|
$50.000
|
$40.000
|
$35.000
|
$65.000
|
$40.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
100.000
|
$75.000
|
$1.000
|
$40.000
|
$40.000
|
$65.000
|
$65.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
200.000
|
$4.000
|
$1.000
|
$2.000
|
$1.000
|
$10.000
|
$8.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
700.000
|
$34.670
|
$30.000
|
$40.000
|
$50.000
|
$68.000
|
$75.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
350.000
|
$72.500
|
$30.000
|
$50.000
|
$55.000
|
$85.000
|
$105.000
|
|
|
REALIGN POSTS
|
EA
|
2,500.000
|
$12.500
|
$20.000
|
$10.000
|
$10.000
|
$20.000
|
$25.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
500.000
|
$12.500
|
$100.000
|
$10.000
|
$20.000
|
$30.000
|
$20.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,000.000
|
$30.000
|
$15.000
|
$40.000
|
$32.000
|
$50.000
|
$30.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
50.000
|
$85.500
|
$40.000
|
$100.000
|
$55.000
|
$325.000
|
$800.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
10.000
|
$100.000
|
$40.000
|
$100.000
|
$500.000
|
$200.000
|
$800.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
250.000
|
$3,900.000
|
$3,000.000
|
$4,500.000
|
$3,800.000
|
$4,250.000
|
$4,500.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
15.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,380.000
|
$800.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
15.000
|
$100.000
|
$100.000
|
$100.000
|
$150.000
|
$150.000
|
$300.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
25.000
|
$80.000
|
$100.000
|
$50.000
|
$100.000
|
$110.000
|
$200.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
20.000
|
$72.500
|
$100.000
|
$1.000
|
$100.000
|
$110.000
|
$200.000
|
|
|
REPLACE SGT STRUT
|
EA
|
10.000
|
$35.000
|
$100.000
|
$1.000
|
$100.000
|
$110.000
|
$200.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
25.000
|
$19.000
|
$1.000
|
$40.000
|
$30.000
|
$100.000
|
$40.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
140.000
|
$250.000
|
$200.000
|
$200.000
|
$450.000
|
$450.000
|
$700.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
500.000
|
$25.000
|
$150.000
|
$180.000
|
$200.000
|
$250.000
|
$260.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
700.000
|
$50.000
|
$200.000
|
$200.000
|
$320.000
|
$430.000
|
$375.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
1.000
|
$125.000
|
$100.000
|
$100.000
|
$320.000
|
$250.000
|
$1,000.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
3.000
|
$183.380
|
$100.000
|
$100.000
|
$320.000
|
$250.000
|
$1,000.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
10.000
|
$50.000
|
$10.000
|
$40.000
|
$250.000
|
$100.000
|
$300.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
1.000
|
$75.000
|
$10.000
|
$40.000
|
$300.000
|
$100.000
|
$300.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
2.000
|
$750.000
|
$1,500.000
|
$1,500.000
|
$1,250.000
|
$1,850.000
|
$5,000.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
20.000
|
$1,500.000
|
$500.000
|
$1,500.000
|
$1,250.000
|
$2,100.000
|
$5,000.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,000.000
|
$1.500
|
$1.000
|
$1.000
|
$3.000
|
$5.000
|
$12.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
1,000.000
|
$3.000
|
$1.000
|
$1.000
|
$3.000
|
$5.000
|
$12.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
50.000
|
$100.000
|
$100.000
|
$100.000
|
$250.000
|
$200.000
|
$300.000
|
|
|
REPLACE POST HARDWARE (TL-4)
|
EA
|
700.000
|
$25.000
|
$50.000
|
$10.000
|
$40.000
|
$100.000
|
$50.000
|
|
|
REPLACE POSTS (TL-4)(FURN)
|
EA
|
100.000
|
$25.000
|
$50.000
|
$50.000
|
$150.000
|
$150.000
|
$75.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
200.000
|
$2.500
|
$1.000
|
$5.000
|
$3.000
|
$5.000
|
$5.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
200.000
|
$5.000
|
$20.000
|
$50.000
|
$15.000
|
$15.000
|
$30.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
50.000
|
$40.000
|
$1.000
|
$70.000
|
$50.000
|
$85.000
|
$75.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
200.000
|
$3.000
|
$1.000
|
$2.000
|
$3.000
|
$5.000
|
$8.000
|
|
|
POST AND CABLE FENCE (REPAIR)
|
LF
|
100.000
|
$12.000
|
$5.000
|
$50.000
|
$10.000
|
$20.000
|
$30.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
2.000
|
$750.000
|
$100.000
|
$1.000
|
$26,500.000
|
$25,000.000
|
$35,000.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
2.000
|
$14,984.890
|
$100.000
|
$1.000
|
$47,000.000
|
$48,000.000
|
$68,000.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$20,000.000
|
$10,000.000
|
$15,000.000
|
$29,000.000
|
$33,000.000
|
$38,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
20.000
|
$1,233.000
|
$1.000
|
$100.000
|
$3,000.000
|
$5,000.000
|
$12,000.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
10.000
|
$600.000
|
$1.000
|
$100.000
|
$3,000.000
|
$7,500.000
|
$15,000.000
|
|
|
REPAIR (REACT)
|
EA
|
3.000
|
$3,500.000
|
$1,000.000
|
$500.000
|
$1,500.000
|
$2,500.000
|
$15,000.000
|
|
|
REPAIR (CATGR - FRONT SECTION)
|
EA
|
5.000
|
$1,000.000
|
$1,000.000
|
$5,000.000
|
$3,200.000
|
$4,500.000
|
$12,000.000
|
|
|
REPAIR (CATGR - END SECTION)
|
EA
|
5.000
|
$1,250.000
|
$1,000.000
|
$5,000.000
|
$3,200.000
|
$4,500.000
|
$12,000.000
|
|
|
REMOVE AND REPLACE (CATGR)
|
EA
|
2.000
|
$700.000
|
$7,500.000
|
$15,000.000
|
$5,000.000
|
$5,500.000
|
$28,000.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$1,200.000
|
$1,500.000
|
$6,500.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
1.000
|
$2,196.360
|
$5,000.000
|
$500.000
|
$3,200.000
|
$4,250.000
|
$4,200.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
2.000
|
$11,500.000
|
$30,000.000
|
$30,000.000
|
$26,500.000
|
$29,800.000
|
$40,000.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
20.000
|
$1,750.000
|
$2,500.000
|
$5,000.000
|
$3,100.000
|
$4,000.000
|
$12,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
1.000
|
$33,000.000
|
$35,000.000
|
$30,000.000
|
$42,000.000
|
$55,000.000
|
$78,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
10.000
|
$1,510.000
|
$2,000.000
|
$10,000.000
|
$2,750.000
|
$4,000.000
|
$15,000.000
|
|
|
REMOVE AND REPLACE (SHORTRACC)
|
EA
|
1.000
|
$1,500.000
|
$1.000
|
$1.000
|
$22,500.000
|
$21,000.000
|
$28,500.000
|
|
|
REPAIR (SHORTRACC)
|
LF
|
10.000
|
$25.500
|
$1,000.000
|
$500.000
|
$100.000
|
$2,500.000
|
$750.000
|
|
|
REPAIR (WIDE TRACC) (BAY)
|
EA
|
5.000
|
$700.000
|
$1,000.000
|
$500.000
|
$1,250.000
|
$1,500.000
|
$6,500.000
|
|
|
REPAIR (BEAT - SSCC)
|
LF
|
150.000
|
$250.000
|
$100.000
|
$100.000
|
$600.000
|
$500.000
|
$400.000
|
|
|
REMOVE AND REPLACE TAU II (W)
|
EA
|
2.000
|
$12,500.000
|
$30,000.000
|
$20,000.000
|
$35,000.000
|
$50,000.000
|
$46,000.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
2.000
|
$2,150.000
|
$5,000.000
|
$5,000.000
|
$3,500.000
|
$8,000.000
|
$15,000.000
|
|
|
REACT DECAL
|
EA
|
5.000
|
$1,509.720
|
$100.000
|
$500.000
|
$400.000
|
$750.000
|
$2,500.000
|
|
|
REACT 350 CABLE HOLDERS
|
EA
|
5.000
|
$500.000
|
$500.000
|
$500.000
|
$400.000
|
$350.000
|
$3,500.000
|
|
|
REPAIR (TAU)(II)(W)(BAY)
|
EA
|
5.000
|
$1,200.000
|
$2,000.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
$8,500.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
1.000
|
$8,000.000
|
$20,000.000
|
$25,000.000
|
$24,500.000
|
$30,000.000
|
$48,000.000
|
|
|
REPAIR (TAU)(MASH)(N)
|
EA
|
5.000
|
$1,800.000
|
$2,000.000
|
$5,000.000
|
$2,200.000
|
$3,500.000
|
$23,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$100.000
|
$100.000
|
$200.000
|
$150.000
|
$300.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$80.000
|
$1.000
|
$1,000.000
|
$1,500.000
|
$300.000
|
$500.000
|
|
Totals: |
$2,823,491.980
|
$2,364,847.000
|
$4,063,875.000
|
$4,320,780.000
|
$4,917,750.000
|
$5,596,550.000
|