Show Job Controls
Bid Cobra

TAYLOR SH 36 (0181-01-071)

Items: 47

County: TAYLOR
Length: 0.0000 MILES (0.6039 MILES)
Highway: SH 36
District: ABILENE
Control Number: 0181-01-071
DBE Goal: 0.0%
Project: STP 2B26(013)HES
Guaranty: $9,000.00
Time: 50 WORKING DAYS
Engineer's Estimate: $307,957.60
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263019
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206625
Contract Type: FEDERAL
Project Description: INSTALL SIGNAL AT SH 36 AND MAPLE STREET, UPGRADE ADVANCE WARNING SIGNS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$307,957.60
Over/Under Est: -8.96% -$27,603.60
Over/Under Est: -6.48% -$19,949.55
Amt Left: 2.73% $7,654.05
Over/Under Est: -6.22% -$19,153.46
Amt Left: 3.01% $8,450.14
Delta: -0.28% -$796.09
$299,876.46
Over/Under Est: -2.62% -$8,081.14
Amt Left: 6.96% $19,522.46
Delta: -3.83% -$11,072.32
Over/Under Est: 51.33% $158,082.08
Amt Left: 66.23% $185,685.68
Delta: -55.41% -$166,163.22

Bid Items & Bid Tabulations

47 Total 0 of 47
TAYLOR  |  SH 36  |  ABILENE  |  0181-01-071  |  09/02/2026 1:00 PM CDT  |  $307,957.60  |  STP 2B26(013)HES  |  HAZARD ELIM & SAFETY  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIS ELECTRIC CO., LP
VACA UNDERGROUND UTILITIES INC
WG ENGINEERING & CONSTRUCTION, LLC
YUNEX LLC
SELECT MAINTENANCE, L.L.C.
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 36.000 $450.000 $525.000 $300.000 $515.000 $340.000 $500.000
MOBILIZATION
LS 1.000 $23,300.000 $27,500.000 $27,000.000 $28,540.000 $75,000.000 $45,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $1,000.000 $3,000.000 $6,053.000 $7,104.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $150.000 $65.000 $165.000 $150.000 $131.000 $50.000
TMA (STATIONARY)
DAY 10.000 $250.000 $100.000 $170.000 $300.000 $522.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 10.000 $350.000 $100.000 $110.000 $500.000 $392.000 $1,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $5.750 $15.000 $1.000 $7.000 $4.970 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.750 $1.000 $1.000 $2.000 $1.310 $0.500
CONDT (PVC) (SCH 80) (3")
LF 165.000 $25.000 $25.000 $15.000 $23.000 $22.780 $25.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 150.000 $30.000 $35.000 $20.000 $42.000 $57.420 $50.000
ELEC CONDR (NO.8) BARE
LF 347.000 $3.000 $1.500 $2.150 $3.000 $2.280 $3.000
ELEC CONDR (NO.8) INSULATED
LF 68.000 $3.000 $1.500 $3.000 $3.000 $2.580 $3.000
GROUND BOX TY C (162911)W/APRON
EA 3.000 $2,000.000 $2,250.000 $1,500.000 $1,822.000 $1,712.000 $3,500.000
ELC SRV TY D 120/240 060(NS)AL(E)SP(O)
EA 1.000 $12,000.000 $12,500.000 $7,000.000 $8,559.000 $7,877.000 $25,000.000
ALUMINUM SIGNS (TY A)
SF 31.500 $65.000 $55.000 $42.000 $45.000 $47.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $800.000 $1,500.000 $800.000 $985.000 $773.680 $1,000.000
REMOVE SM RD SN SUP&AM
EA 4.000 $200.000 $350.000 $950.000 $220.000 $97.830 $373.670
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 100.000 $2.000 $3.750 $10.000 $3.000 $3.810 $3.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 450.000 $4.000 $4.000 $10.000 $2.000 $3.920 $3.600
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 200.000 $6.000 $5.500 $11.000 $4.000 $5.440 $5.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 500.000 $1.000 $3.850 $10.000 $2.000 $3.810 $3.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,000.000 $1.000 $3.850 $10.000 $2.000 $3.810 $3.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,240.000 $4.000 $3.850 $10.000 $2.000 $3.810 $3.500
PREFAB PM TY C (W)(24")(SLD)
LF 200.000 $15.000 $19.250 $18.000 $20.000 $19.030 $17.500
PREFAB PM TY C (W)(ARROW)
EA 12.000 $250.000 $330.000 $250.000 $250.000 $326.090 $300.000
PREFAB PM TY C (W)(DBL ARROW)
EA 4.000 $400.000 $880.000 $250.000 $385.000 $869.570 $800.000
PREFAB PM TY C (W)(WORD)
EA 3.000 $350.000 $385.000 $250.000 $400.000 $380.440 $350.000
ELIM EXT PM & MRKS (6")
LF 480.000 $0.500 $2.750 $1.000 $5.000 $2.720 $2.500
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $45,000.000 $40,000.000 $42,000.000 $39,585.000 $28,661.000 $85,000.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $330.000 $350.000 $360.000 $388.000 $299.000 $450.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $350.000 $350.000 $360.000 $388.000 $299.000 $450.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $350.000 $350.000 $360.000 $388.000 $299.000 $450.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $345.000 $350.000 $360.000 $388.000 $299.000 $450.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $325.000 $350.000 $360.000 $388.000 $299.000 $450.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $345.000 $350.000 $360.000 $368.255 $299.000 $450.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 8.000 $180.000 $125.000 $160.000 $265.000 $212.000 $300.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 2.000 $370.000 $150.000 $180.000 $330.000 $278.000 $350.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 208.000 $3.200 $3.000 $3.000 $4.000 $3.230 $5.000
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 313.000 $6.500 $7.000 $7.000 $7.000 $6.700 $10.000
INS TRF SIG PL AM(S)2 ARM(44-36')
EA 2.000 $32,000.000 $27,500.000 $22,000.000 $15,888.000 $18,456.000 $25,000.000
INSTALL OF FND FOR GROUND MNT CABINETS
EA 1.000 $7,000.000 $6,500.000 $5,500.000 $3,387.000 $2,979.000 $4,500.000
INSTALL BBU SYSTEM
EA 1.000 $12,000.000 $2,500.000 $10,000.000 $7,964.000 $783.000 $15,000.000
INSTALL FUSED DISCONNECT
EA 2.000 $3,000.000 $150.000 $1,000.000 $2,054.563 $2,881.000 $4,500.000
VIVDS PROSR SYS
EA 1.000 $15,000.000 $5,000.000 $12,000.000 $16,888.000 $3,987.000 $15,000.000
VIVDS CAM ASSY FXD LNS
EA 4.000 $5,000.000 $8,000.000 $7,000.000 $8,063.000 $5,332.000 $5,500.000
VIVDS CNTRL SOFTWARE
EA 1.000 $1,000.000 $1,000.000 $525.000 $1,252.000 $419.000 $500.000
VIVDS CABLE (CAT 6)
LF 500.000 $4.500 $2.000 $2.200 $3.500 $4.000 $5.000
Totals: $307,957.600 $280,354.000 $288,008.050 $288,804.136 $299,876.460 $466,039.680
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $15,000.00