|
|
REMOV CONC (RIPRAP)
|
SY
|
869.000
|
$25.000
|
$30.000
|
$30.000
|
$30.000
|
|
|
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,478.000
|
$12.000
|
$28.000
|
$10.000
|
$4.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
22.000
|
$20.000
|
$28.000
|
$75.000
|
$900.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
491.000
|
$15.000
|
$28.000
|
$75.000
|
$35.000
|
|
|
BLADING
|
HR
|
30.000
|
$280.000
|
$100.000
|
$100.000
|
$157.000
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
AC
|
4,632.000
|
$0.250
|
$2.300
|
$2.300
|
$0.570
|
|
|
PROOF ROLLING
|
HR
|
30.000
|
$200.000
|
$100.000
|
$150.000
|
$85.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
2,523.000
|
$30.000
|
$60.000
|
$30.000
|
$50.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
1,438.000
|
$6.000
|
$10.000
|
$40.000
|
$10.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
38.000
|
$230.000
|
$150.000
|
$500.000
|
$450.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
114.000
|
$400.000
|
$300.000
|
$300.000
|
$400.000
|
|
|
STRUCT EXCAV
|
CY
|
287.000
|
$180.000
|
$30.000
|
$12.000
|
$450.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
538.000
|
$28.000
|
$22.000
|
$45.000
|
$75.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
88.000
|
$280.000
|
$280.000
|
$300.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
264.000
|
$400.000
|
$500.000
|
$440.000
|
$600.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
200.000
|
$500.000
|
$600.000
|
$540.000
|
$750.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
92.500
|
$2,000.000
|
$1,600.000
|
$2,100.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
60.800
|
$2,000.000
|
$1,600.000
|
$2,100.000
|
$3,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
26.400
|
$2,000.000
|
$1,700.000
|
$2,100.000
|
$1,900.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
15,597.000
|
$30.000
|
$26.000
|
$32.000
|
$50.500
|
|
|
APPROACH SLAB (HPC)
|
CY
|
144.800
|
$900.000
|
$750.000
|
$1,095.000
|
$1,175.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,020.300
|
$265.000
|
$320.000
|
$283.000
|
$286.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$800.000
|
$650.000
|
$850.000
|
$950.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
762.000
|
$120.000
|
$135.000
|
$225.000
|
$110.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
126.000
|
$225.000
|
$260.000
|
$300.000
|
$300.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
1,517.000
|
$225.000
|
$200.000
|
$125.000
|
$135.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
175.000
|
$300.000
|
$425.000
|
$175.000
|
$325.000
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
39.000
|
$300.000
|
$310.000
|
$175.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$3,000.000
|
$2,300.000
|
$3,000.000
|
$1,500.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$120,000.000
|
$135,000.000
|
$180,000.000
|
$250,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$6,000.000
|
$17,500.000
|
$5,000.000
|
$7,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$310,000.000
|
$290,000.000
|
$300,000.000
|
$425,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$20,000.000
|
$2,500.000
|
$3,500.000
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,900.000
|
$12,000.000
|
$15,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
434.000
|
$240.000
|
$175.000
|
$400.000
|
$110.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$500.000
|
$250.000
|
$500.000
|
$615.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
230.000
|
$34.000
|
$120.000
|
$60.000
|
$62.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
230.000
|
$12.000
|
$17.000
|
$20.000
|
$16.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,886.000
|
$12.000
|
$10.000
|
$15.000
|
$4.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,886.000
|
$2.500
|
$2.000
|
$2.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
10.000
|
$7,000.000
|
$9,500.000
|
$5,500.000
|
$3,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
960.000
|
$65.000
|
$115.000
|
$105.000
|
$35.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
960.000
|
$20.000
|
$20.000
|
$15.000
|
$4.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
960.000
|
$25.000
|
$35.000
|
$25.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$39.000
|
$50.000
|
$40.000
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$2,250.000
|
$1,800.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,529.000
|
$4.000
|
$2.000
|
$2.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$340.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,800.000
|
$3,500.000
|
$4,000.000
|
$4,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$340.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,700.000
|
$2,000.000
|
$1,500.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,400.000
|
$1,500.000
|
$2,000.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,000.000
|
$10,000.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$1,000.000
|
$650.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
8.000
|
$40.000
|
$45.000
|
$50.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$40.000
|
$45.000
|
$50.000
|
$85.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$40.000
|
$50.000
|
$20.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
6,534.000
|
$0.350
|
$1.500
|
$1.500
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$10.000
|
$21.000
|
$23.000
|
$6.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
7,200.000
|
$0.350
|
$2.000
|
$1.500
|
$0.400
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
840.000
|
$0.800
|
$4.000
|
$3.500
|
$1.300
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
420.000
|
$0.800
|
$4.000
|
$3.500
|
$1.300
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
100.000
|
$0.800
|
$4.000
|
$3.500
|
$2.500
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,360.000
|
$0.600
|
$2.000
|
$1.750
|
$0.650
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
10,994.000
|
$0.800
|
$2.500
|
$2.300
|
$0.850
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
494.000
|
$0.800
|
$2.500
|
$2.300
|
$1.050
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,531.000
|
$0.800
|
$2.500
|
$2.300
|
$0.850
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
148.000
|
$5.000
|
$12.000
|
$11.500
|
$4.750
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
6,216.000
|
$1.000
|
$5.000
|
$1.500
|
$2.850
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
24.000
|
$6.000
|
$6.000
|
$10.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,360.000
|
$0.600
|
$1.500
|
$1.750
|
$0.900
|
|
Totals: |
$3,702,725.600
|
$3,731,413.100
|
$3,801,865.200
|
$4,373,313.690
|