Show Job Controls
Bid Cobra

TERRELL US 90 (0022-03-032)

Items: 44

County: TERRELL
Length: N/A
Highway: US 90
District: ODESSA
Control Number: 0022-03-032
DBE Goal: 0.0%
Project: BR 2026(514)
Guaranty: $65,000.00
Time: 280 WORKING DAYS
Engineer's Estimate: $3,246,903.90
Date: 11/03/2026 1:00 PM CST (2 days ago)
Contract Number: 11263008
Type: BRIDGE MAINTENANCE
Project ID: A00211095
Contract Type: FEDERAL
Project Description: BRIDGE MAINTENANCE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (7)
E
Engineer's Estimate
$3,246,903.90
Over/Under Est: -11.03% -$358,015.90
$2,978,676.54
Over/Under Est: -8.26% -$268,227.36
Amt Left: 3.11% $89,788.54
Over/Under Est: -6% -$194,751.50
Amt Left: 5.65% $163,264.40
Delta: -2.47% -$73,475.86
Over/Under Est: -1.29% -$41,784.90
Amt Left: 10.95% $316,231.00
Delta: -5.01% -$152,966.60
Over/Under Est: 2.63% $85,447.10
Amt Left: 15.35% $443,463.00
Delta: -3.97% -$127,232.00
Over/Under Est: 9.57% $310,649.10
Amt Left: 23.15% $668,665.00
Delta: -6.76% -$225,202.00
Over/Under Est: 22.66% $735,661.30
Amt Left: 37.86% $1,093,677.20
Delta: -11.95% -$425,012.20

Bid Items & Bid Tabulations

44 Total 0 of 44
TERRELL  |  US 90  |  ODESSA  |  0022-03-032  |  11/03/2026 1:00 PM CST  |  $3,246,903.90  |  BR 2026(514)  |  BRIDGE MAINT  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE TRUESDELL CORPORATION
RELMCO, INC.
PATHFIELD INVESTMENTS LLC
STRUCTURAL INTEGRITY GROUP LLC
MASSANA CONSTRUCTION INC.
SCR CIVIL CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
REMOV CONC (RIPRAP)
CY 31.000 $245.300 $160.000 $50.000 $240.000 $280.000 $1,900.000 $910.000 $260.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 2,284.000 $2.700 $28.000 $20.000 $20.000 $22.000 $40.000 $30.000 $17.000
FLOWABLE BACKFILL
CY 24.000 $359.700 $650.000 $300.000 $900.000 $708.000 $1,200.000 $940.000 $446.000
CL C CONC (VEH DEFL WALL)
CY 224.000 $900.000 $1,010.000 $1,550.000 $1,700.000 $2,180.000 $1,500.000 $2,001.000 $2,100.000
EPOXY WATERPROOF FINISH (TY X)
SF 21,112.000 $9.300 $11.000 $8.400 $10.000 $8.000 $5.250 $9.500 $7.100
PENETRATING CONCRETE SURFACE TREATMENT
SY 2,605.000 $16.600 $14.000 $14.700 $18.000 $14.000 $8.000 $16.500 $8.000
CONC STR REPAIR (EPOXY MORTAR)
SF 53.000 $324.300 $180.000 $250.000 $200.000 $634.000 $340.000 $236.300 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 139.000 $231.200 $180.000 $300.000 $300.000 $461.000 $360.000 $212.000 $200.000
CONC STR REPAIR (STANDARD)
SF 20.000 $242.500 $275.000 $350.000 $230.000 $407.000 $365.000 $220.000 $500.000
RIPRAP (CONC) (CL B) (4 IN)
CY 31.000 $915.800 $750.000 $1,250.000 $1,200.000 $800.000 $1,500.000 $1,211.000 $1,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1.000 $616.200 $2,000.000 $2,750.000 $2,000.000 $2,000.000 $4,500.000 $710.000 $2,200.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 181.000 $61.000 $85.000 $74.800 $50.000 $65.000 $35.000 $78.000 $40.000
CLEANING AND SEALING EXIST JOINTS (CL5)
LF 68.000 $48.600 $80.000 $90.200 $85.000 $50.000 $40.000 $83.200 $40.000
CLEANING EXISTING JOINTS
LF 1,019.000 $27.800 $13.000 $30.800 $47.000 $16.000 $4.000 $6.000 $33.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 2,444.000 $227.500 $136.000 $185.000 $290.000 $157.250 $125.000 $178.500 $105.000
RETROFIT RAIL (TY T131RC)
LF 1,804.000 $240.300 $230.000 $242.000 $230.000 $309.000 $275.000 $315.000 $223.000
GABION MATTRESSES (GALV)(12 IN)
SY 428.000 $163.900 $150.000 $125.000 $240.000 $263.000 $145.000 $325.000 $148.000
GABION MATTRESSES (GALV) (24 IN)
SY 42.000 $286.300 $340.000 $225.000 $280.000 $926.000 $175.000 $330.000 $290.000
GABIONS (3' X 3')(GALV)
CY 225.000 $426.200 $355.000 $325.000 $360.000 $475.000 $345.000 $672.000 $467.000
MOBILIZATION
LS 1.000 $220,511.400 $492,121.000 $300,000.000 $250,000.000 $316,000.000 $756,097.000 $294,110.000 $390,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $15,000.000 $900.000 $3,500.000 $1,500.000 $4,000.000 $9,500.000 $3,000.000 $64,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,386.400 $1,200.000 $12,500.000 $5,000.000 $15,000.000 $1,500.000 $24,000.000 $25,000.000
TMA (STATIONARY)
DAY 280.000 $289.500 $200.000 $150.000 $100.000 $1.000 $55.000 $225.000 $300.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $34.900 $38.000 $37.400 $35.000 $35.000 $35.000 $42.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $3,070.600 $3,000.000 $2,970.000 $2,500.000 $2,650.000 $2,700.000 $3,475.000 $2,650.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $7.600 $4.000 $2.750 $33.000 $3.000 $3.000 $4.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $3,689.000 $3,800.000 $3,740.000 $3,500.000 $3,400.000 $3,500.000 $4,005.500 $3,400.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 6.000 $42,387.500 $46,500.000 $58,500.000 $10,000.000 $48,550.000 $46,000.000 $60,800.000 $47,100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 44.000 $59.900 $130.000 $35.000 $90.000 $25.000 $45.000 $42.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 26.000 $54.100 $40.000 $35.000 $95.000 $35.000 $45.000 $42.000 $35.000
PAVEMENT SLER 6"
LF 2,706.000 $1.200 $4.000 $3.300 $2.300 $3.000 $3.000 $3.550 $3.000
PREFAB PM TY B (W)(6")(SLD)
LF 1,804.000 $9.500 $12.000 $11.550 $13.000 $10.500 $11.000 $12.400 $10.500
PREFAB PM TY B (Y)(6")(BRK)
LF 902.000 $7.300 $12.000 $11.550 $9.000 $10.500 $11.000 $12.400 $10.500
REFL PAV MRKR TY II-A-A
EA 25.000 $8.700 $22.000 $22.000 $15.000 $20.000 $20.000 $23.600 $20.000
PAV SURF PREP FOR MRK (6")
LF 2,706.000 $1.100 $3.500 $3.300 $2.600 $3.000 $3.000 $3.550 $3.000
DRIFTWOOD REMOVAL
CY 10.000 $210.000 $260.000 $500.000 $250.000 $1,260.000 $125.000 $544.000 $200.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 112.000 $75.200 $50.000 $75.000 $55.000 $29.000 $75.000 $30.000 $50.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 20.000 $62.600 $180.000 $75.000 $50.000 $53.000 $75.000 $50.000 $100.000
CNC CRACK REPAIR (FLOOD)(GRAVITY)
SF 400.000 $55.800 $15.000 $75.000 $18.000 $1.000 $90.000 $24.000 $10.000
CONCRETE BEAM REPAIR (CFRP)
EA 3.000 $10,148.000 $12,000.000 $5,500.000 $11,000.000 $13,200.000 $18,000.000 $25,675.000 $12,000.000
STEEL BRIDGE ZONE PAINTING
SF 3,600.000 $59.000 $25.000 $26.870 $26.000 $21.000 $25.000 $30.000 $23.000
BRIDGE DECK CLEANING
SY 5,265.000 $15.200 $9.000 $5.000 $15.000 $6.000 $1.200 $11.800 $5.000
BENT CAP/ABUTMENT CAP CLEANING
EA 52.000 $1,826.500 $555.000 $483.750 $700.000 $450.000 $185.000 $555.000 $200.000
BRIDGE BEAM END CLEANING
EA 398.000 $114.200 $175.000 $80.630 $190.000 $75.000 $50.000 $80.000 $117.000
Totals: $3,246,903.900 $2,888,888.000 $2,978,676.540 $3,052,152.400 $3,205,119.000 $3,332,351.000 $3,557,553.000 $3,982,565.200
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
Total: $120,000.00