|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,589.000
|
$15.000
|
$12.000
|
$13.000
|
$8.350
|
$9.350
|
|
|
BACKFILL (TY B)
|
STA
|
411.000
|
$400.000
|
$400.000
|
$400.000
|
$210.000
|
$758.130
|
|
|
BLADING
|
STA
|
411.000
|
$400.000
|
$400.000
|
$125.000
|
$210.000
|
$236.570
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
128,423.000
|
$0.200
|
$0.240
|
$0.230
|
$0.230
|
$0.270
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$100.000
|
$100.000
|
$225.000
|
$185.000
|
$241.870
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
28,253.000
|
$3.500
|
$4.000
|
$5.000
|
$3.800
|
$4.980
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
15,038.000
|
$4.000
|
$4.000
|
$5.000
|
$3.950
|
$5.230
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,104.000
|
$60.000
|
$58.000
|
$125.000
|
$89.500
|
$91.140
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
6,312.000
|
$33.000
|
$31.000
|
$60.000
|
$47.000
|
$44.990
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
59,333.000
|
$1.700
|
$2.000
|
$5.750
|
$3.350
|
$3.040
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
32,062.000
|
$6.000
|
$4.700
|
$9.500
|
$7.350
|
$7.810
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
100.000
|
$130.000
|
$203.500
|
$210.000
|
$310.000
|
$368.770
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
52.000
|
$800.000
|
$475.000
|
$892.500
|
$875.000
|
$799.000
|
|
|
RETROFIT RAIL (TY T551)
|
LF
|
64.000
|
$700.000
|
$692.000
|
$588.000
|
$575.000
|
$758.410
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,060,000.000
|
$1,140,000.000
|
$1,200,000.000
|
$1,400,000.000
|
$1,575,203.510
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$30,000.000
|
$30,000.000
|
$50,000.000
|
$30,000.000
|
$35,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
444.000
|
$40.000
|
$40.000
|
$10.000
|
$35.000
|
$41.860
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$5.000
|
$5.000
|
$5.000
|
$14.000
|
$16.750
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
96.000
|
$12.000
|
$30.000
|
$28.610
|
$28.000
|
$33.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
120.000
|
$7.000
|
$7.000
|
$6.950
|
$6.800
|
$8.140
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
60.000
|
$3.000
|
$1.500
|
$1.370
|
$1.350
|
$1.600
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,420.000
|
$6.000
|
$10.500
|
$10.060
|
$9.850
|
$11.780
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
710.000
|
$2.000
|
$1.500
|
$1.370
|
$1.350
|
$1.600
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
480.000
|
$50.000
|
$90.000
|
$84.000
|
$82.500
|
$95.670
|
|
|
CONC CURB & GUTTER (VALLEY GUTTER)
|
LF
|
1,109.000
|
$50.000
|
$165.000
|
$157.500
|
$155.000
|
$102.920
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
604.000
|
$100.000
|
$135.000
|
$126.000
|
$125.000
|
$80.800
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,379.000
|
$50.000
|
$30.000
|
$80.000
|
$65.500
|
$63.610
|
|
|
CONC SIDEWALKS (4")
|
SY
|
722.000
|
$200.000
|
$120.000
|
$115.500
|
$115.000
|
$175.300
|
|
|
CURB RAMPS (TY 7)
|
SY
|
161.000
|
$300.000
|
$260.000
|
$246.750
|
$240.000
|
$305.400
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
62,737.000
|
$0.200
|
$0.150
|
$0.290
|
$0.070
|
$0.260
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
600.000
|
$50.000
|
$33.000
|
$34.930
|
$41.000
|
$38.110
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,430.000
|
$1,971.960
|
$1,600.000
|
$2,151.160
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,000.000
|
$880.000
|
$1,014.150
|
$1,400.000
|
$1,106.310
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
2.000
|
$1,500.000
|
$2,390.000
|
$3,380.490
|
$2,500.000
|
$3,687.710
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$5.000
|
$2.750
|
$2.250
|
$6.150
|
$2.460
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$500.000
|
$165.000
|
$563.420
|
$410.000
|
$614.620
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,000.000
|
$3,380.000
|
$4,394.640
|
$4,100.000
|
$4,794.020
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$500.000
|
$220.000
|
$563.420
|
$410.000
|
$614.620
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$900.000
|
$935.000
|
$1,031.810
|
$875.000
|
$1,075.580
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$1,000.000
|
$1,045.000
|
$1,179.210
|
$980.000
|
$1,229.240
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,500.000
|
$1,210.000
|
$147.410
|
$1,100.000
|
$1,382.890
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$100.000
|
$110.000
|
$117.920
|
$105.000
|
$122.920
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$50.000
|
$22.000
|
$17.690
|
$20.500
|
$18.440
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$150.000
|
$100.000
|
$123.820
|
$92.500
|
$129.070
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
24,136.000
|
$0.250
|
$0.280
|
$0.260
|
$0.260
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
83,132.000
|
$0.250
|
$0.280
|
$0.260
|
$0.260
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
1,114.000
|
$1.200
|
$1.100
|
$1.050
|
$1.050
|
$1.230
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
12,254.000
|
$0.600
|
$0.550
|
$0.530
|
$0.510
|
$0.610
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
680.000
|
$5.500
|
$5.500
|
$5.250
|
$5.150
|
$6.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
3,336.000
|
$0.250
|
$0.280
|
$0.260
|
$0.260
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
94,580.000
|
$0.250
|
$0.280
|
$0.260
|
$0.260
|
$0.310
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,718.000
|
$1.500
|
$1.200
|
$0.830
|
$1.450
|
$2.460
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,474.000
|
$1.500
|
$1.200
|
$0.830
|
$1.450
|
$2.460
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
557.000
|
$2.500
|
$2.200
|
$2.100
|
$2.050
|
$2.460
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,127.000
|
$2.000
|
$1.400
|
$1.310
|
$1.300
|
$1.540
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
12,068.000
|
$0.750
|
$0.800
|
$0.790
|
$0.770
|
$0.920
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
41,566.000
|
$0.750
|
$0.700
|
$0.680
|
$0.670
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,668.000
|
$0.750
|
$0.700
|
$0.790
|
$0.770
|
$0.920
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
47,290.000
|
$0.750
|
$0.700
|
$0.680
|
$0.670
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
340.000
|
$15.000
|
$14.800
|
$14.180
|
$14.000
|
$16.590
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
40.000
|
$250.000
|
$248.000
|
$236.250
|
$230.000
|
$276.580
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
167.000
|
$80.000
|
$60.500
|
$57.750
|
$56.500
|
$67.610
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
167.000
|
$4.500
|
$6.600
|
$6.300
|
$6.150
|
$7.380
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,211.000
|
$4.500
|
$5.000
|
$4.730
|
$4.650
|
$5.530
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
102,592.000
|
$0.600
|
$0.550
|
$0.530
|
$0.510
|
$0.610
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
6,127.000
|
$1.500
|
$0.800
|
$0.790
|
$0.770
|
$0.920
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$4,500.000
|
$4,200.000
|
$10,000.000
|
$2,900.000
|
$11,711.860
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$2,100.000
|
$2,560.000
|
$10,000.000
|
$2,200.000
|
$15,057.780
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
145,992.000
|
$6.500
|
$6.500
|
$7.000
|
$6.650
|
$7.400
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
21,899.000
|
$5.500
|
$5.500
|
$5.000
|
$3.650
|
$6.550
|
|
|
TACK COAT
|
GAL
|
39,503.000
|
$5.000
|
$5.000
|
$4.000
|
$5.150
|
$5.460
|
|
|
D-GR HMA TY-C SAC-B PG76-28
|
TON
|
4,014.000
|
$140.000
|
$140.000
|
$180.000
|
$170.000
|
$195.060
|
|
|
D-GR HMA TY-F SAC-B PG76-28
|
TON
|
3,227.000
|
$170.000
|
$170.000
|
$190.000
|
$185.000
|
$205.060
|
|
|
D-GR HMA TY-B SAC-B PG 76-28
|
TON
|
14,889.000
|
$130.000
|
$125.000
|
$170.000
|
$180.000
|
$166.210
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
24,827.000
|
$150.000
|
$140.000
|
$180.000
|
$215.000
|
$196.840
|
|
|
TACK COAT
|
GAL
|
16,613.000
|
$5.000
|
$5.000
|
$4.000
|
$5.150
|
$5.460
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
480.000
|
$60.000
|
$40.000
|
$275.000
|
$130.000
|
$152.470
|
|
|
TMA (STATIONARY)
|
DAY
|
264.000
|
$250.000
|
$200.000
|
$300.000
|
$310.000
|
$588.590
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
69.000
|
$800.000
|
$750.000
|
$400.000
|
$1,000.000
|
$1,153.500
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
2.000
|
$12,000.000
|
$12,000.000
|
$10,000.000
|
$15,500.000
|
$13,838.730
|
|
Totals: |
$11,660,773.500
|
$11,408,518.790
|
$14,346,679.790
|
$14,801,959.910
|
$15,197,371.420
|