|
|
|
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
39,522.230
|
$11.000
|
$2.500
|
$4.850
|
$1.300
|
$6.650
|
$3.580
|
|
|
|
BACKFILL (TY B)
|
STA
|
873.800
|
$225.000
|
$115.000
|
$125.000
|
$400.000
|
$128.740
|
$33.310
|
|
|
|
BLADING
|
STA
|
873.800
|
$180.000
|
$115.000
|
$52.500
|
$300.000
|
$219.040
|
$32.980
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,433.330
|
$6.000
|
$5.750
|
$4.850
|
$4.600
|
$4.670
|
$5.480
|
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
186,582.930
|
$3.750
|
$2.500
|
$2.100
|
$2.000
|
$3.860
|
$2.030
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
26,435.100
|
$5.000
|
$4.000
|
$2.100
|
$2.400
|
$3.910
|
$2.310
|
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
27,811.640
|
$150.000
|
$134.000
|
$130.000
|
$137.000
|
$125.500
|
$141.370
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
46,271.320
|
$180.000
|
$159.750
|
$168.500
|
$140.000
|
$164.210
|
$212.420
|
|
|
|
TACK COAT
|
GAL
|
17,331.530
|
$6.000
|
$3.500
|
$1.000
|
$3.700
|
$4.700
|
$3.660
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
12,233.200
|
$38.000
|
$25.000
|
$30.000
|
$35.000
|
$26.750
|
$35.110
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
8,155.470
|
$60.000
|
$62.000
|
$60.000
|
$80.000
|
$61.050
|
$72.620
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
26,025.000
|
$3.700
|
$3.000
|
$3.400
|
$3.700
|
$3.360
|
$3.070
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
551.020
|
$230.000
|
$220.000
|
$95.000
|
$260.000
|
$105.900
|
$310.500
|
|
|
|
CEM STABIL BKFL
|
CY
|
380.180
|
$290.000
|
$270.000
|
$275.000
|
$360.000
|
$292.790
|
$512.370
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
32.000
|
$100.000
|
$100.000
|
$100.000
|
$115.000
|
$106.470
|
$175.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,854.000
|
$150.000
|
$100.000
|
$125.000
|
$165.000
|
$133.090
|
$162.960
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
48.000
|
$240.000
|
$240.000
|
$200.000
|
$284.000
|
$212.940
|
$323.940
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,700.000
|
$1,700.000
|
$1,900.000
|
$2,800.000
|
$1,969.690
|
$3,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
68.000
|
$2,500.000
|
$1,800.000
|
$2,400.000
|
$4,020.000
|
$2,555.270
|
$4,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,900.000
|
$2,000.000
|
$2,400.000
|
$4,020.000
|
$2,555.270
|
$3,274.340
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,100.000
|
$2,600.000
|
$5,500.000
|
$6,960.000
|
$5,855.820
|
$6,402.080
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,500.000
|
$2,800.000
|
$3,000.000
|
$5,530.000
|
$3,675.000
|
$12,061.800
|
|
|
|
REMOV STR (PIPE)
|
EA
|
20.000
|
$850.000
|
$1,600.000
|
$500.000
|
$3,500.000
|
$532.350
|
$1,766.120
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,530,000.000
|
$1,800,000.000
|
$1,400,000.000
|
$1,881,000.000
|
$1,000,000.000
|
$2,682,854.930
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$15,000.000
|
$5,500.000
|
$27,000.000
|
$36,000.000
|
$18,520.210
|
$50,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
682.000
|
$70.000
|
$22.000
|
$100.000
|
$90.000
|
$30.970
|
$71.070
|
|
|
|
TMA (STATIONARY)
|
DAY
|
382.000
|
$200.000
|
$260.000
|
$250.000
|
$320.000
|
$523.550
|
$508.160
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$250.000
|
$200.000
|
$900.000
|
$900.000
|
$795.100
|
$959.090
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$30.000
|
$46.000
|
$44.000
|
$25.000
|
$52.500
|
$52.250
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$10.000
|
$19.000
|
$18.000
|
$5.000
|
$10.500
|
$21.380
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
7,340.000
|
$8.000
|
$9.000
|
$9.000
|
$7.500
|
$7.350
|
$10.690
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,630.000
|
$2.000
|
$2.000
|
$2.000
|
$4.000
|
$1.050
|
$2.380
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
6,852.000
|
$115.000
|
$31.000
|
$36.500
|
$52.000
|
$38.740
|
$67.580
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
509.170
|
$150.000
|
$120.000
|
$180.000
|
$210.000
|
$191.640
|
$204.310
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
542.480
|
$75.000
|
$35.000
|
$79.000
|
$78.000
|
$60.980
|
$85.730
|
|
|
|
TURNOUTS (ACP)
|
SY
|
688.400
|
$120.000
|
$170.000
|
$79.500
|
$157.000
|
$223.540
|
$365.460
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
174,760.000
|
$0.180
|
$0.200
|
$0.110
|
$0.200
|
$0.150
|
$0.070
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
87,380.000
|
$0.190
|
$0.200
|
$0.120
|
$0.240
|
$0.150
|
$0.100
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
17.000
|
$330.000
|
$250.000
|
$240.000
|
$264.000
|
$252.000
|
$285.020
|
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
13.000
|
$350.000
|
$290.000
|
$275.000
|
$302.000
|
$288.750
|
$326.580
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
7.000
|
$730.000
|
$580.000
|
$550.000
|
$605.000
|
$577.500
|
$653.160
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$750.000
|
$740.000
|
$700.000
|
$770.000
|
$735.000
|
$831.300
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
19.000
|
$850.000
|
$840.000
|
$800.000
|
$880.000
|
$840.000
|
$950.060
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
47.000
|
$870.000
|
$840.000
|
$800.000
|
$880.000
|
$840.000
|
$950.060
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$1,000.000
|
$930.000
|
$890.000
|
$980.000
|
$934.500
|
$1,056.940
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
3.000
|
$1,160.000
|
$930.000
|
$890.000
|
$980.000
|
$934.500
|
$1,056.940
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
89.000
|
$110.000
|
$110.000
|
$100.000
|
$110.000
|
$105.000
|
$118.760
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
40.000
|
$104.000
|
$84.000
|
$80.000
|
$88.000
|
$84.000
|
$95.010
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
64,225.000
|
$0.400
|
$0.200
|
$0.170
|
$0.220
|
$0.210
|
$0.240
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
1,800.000
|
$0.900
|
$0.300
|
$0.230
|
$0.280
|
$0.260
|
$0.300
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(LNDP)
|
LF
|
4,500.000
|
$0.760
|
$0.300
|
$0.230
|
$0.280
|
$0.260
|
$0.300
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
329,758.000
|
$0.310
|
$0.200
|
$0.170
|
$0.220
|
$0.210
|
$0.240
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
240.000
|
$4.000
|
$11.000
|
$3.000
|
$11.000
|
$10.500
|
$11.880
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
412,760.000
|
$0.330
|
$0.200
|
$0.170
|
$0.220
|
$0.210
|
$0.240
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
19,708.000
|
$1.100
|
$1.000
|
$1.500
|
$1.500
|
$1.760
|
$2.380
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
20,638.000
|
$1.250
|
$1.000
|
$1.500
|
$1.500
|
$1.760
|
$2.380
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
653.000
|
$1.320
|
$1.000
|
$0.980
|
$1.100
|
$1.050
|
$1.190
|
|
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
1,655.000
|
$1.150
|
$1.000
|
$0.980
|
$1.100
|
$1.050
|
$1.190
|
|
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
10,830.000
|
$0.850
|
$0.700
|
$0.680
|
$0.680
|
$0.650
|
$0.740
|
|
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
171,076.000
|
$0.700
|
$0.600
|
$0.680
|
$0.630
|
$0.600
|
$0.680
|
|
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
174,328.000
|
$0.700
|
$0.600
|
$0.680
|
$0.630
|
$0.600
|
$0.680
|
|
|
|
PREFAB PM TY B (W)(6")(DOT)
|
LF
|
9.000
|
$10.150
|
$11.000
|
$25.000
|
$11.000
|
$10.500
|
$11.880
|
|
|
|
PREFAB PM TY B (W)(24")(SLD)
|
LF
|
26.000
|
$35.190
|
$37.000
|
$40.000
|
$38.500
|
$36.750
|
$41.570
|
|
|
|
PREFAB PM TY B (Y)(6")(SLD)
|
LF
|
354.000
|
$7.190
|
$11.000
|
$9.500
|
$11.000
|
$10.500
|
$11.880
|
|
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
525.000
|
$22.800
|
$14.000
|
$13.000
|
$14.300
|
$13.650
|
$15.440
|
|
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
10.000
|
$455.000
|
$630.000
|
$650.000
|
$660.000
|
$630.000
|
$712.540
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
556.000
|
$3.740
|
$5.000
|
$4.250
|
$4.950
|
$4.730
|
$5.340
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,180.000
|
$4.250
|
$4.000
|
$3.750
|
$4.400
|
$4.200
|
$4.750
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
528,160.000
|
$0.320
|
$0.600
|
$0.550
|
$0.200
|
$0.680
|
$0.770
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
389.000
|
$0.400
|
$1.000
|
$0.650
|
$0.940
|
$0.890
|
$1.010
|
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
273.000
|
$3.570
|
$1.000
|
$6.000
|
$3.850
|
$3.680
|
$4.160
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
389.000
|
$0.100
|
$2.000
|
$0.550
|
$2.200
|
$2.100
|
$2.380
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
26.000
|
$1.200
|
$5.000
|
$5.000
|
$5.500
|
$5.250
|
$5.940
|
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$87,100.000
|
$16,300.000
|
$20,000.000
|
$8,500.000
|
$15,751.800
|
$8,927.920
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
2.000
|
$315.000
|
$420.000
|
$400.000
|
$1,320.000
|
$420.000
|
$475.030
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
2.000
|
$317.000
|
$420.000
|
$400.000
|
$1,320.000
|
$420.000
|
$475.030
|
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$8,300.000
|
$10,400.000
|
$9,900.000
|
$10,890.000
|
$10,395.000
|
$11,756.960
|
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$1,825.000
|
$790.000
|
$755.000
|
$830.000
|
$792.750
|
$896.620
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$10,000.000
|
$8,500.000
|
$4,800.000
|
$4,620.000
|
$8,208.460
|
$20,763.790
|
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$4,000.000
|
$8,900.000
|
$4,100.000
|
$3,300.000
|
$5,120.350
|
$14,926.590
|
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
325,381.670
|
$6.500
|
$6.000
|
$6.300
|
$6.500
|
$6.360
|
$7.700
|
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
48,807.250
|
$5.000
|
$4.250
|
$2.600
|
$4.200
|
$4.170
|
$3.440
|
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
2.000
|
$12,700.000
|
$15,300.000
|
$7,500.000
|
$20,500.000
|
$525.000
|
$19,131.260
|
|
1
|
|
SUBGR WIDEN (DC)
|
SY
|
57,166.670
|
$4.000
|
$0.000
|
$0.000
|
$0.000
|
$5.600
|
$0.000
|
|
1
|
|
TACK COAT
|
GAL
|
75,757.270
|
$4.500
|
$0.000
|
$0.000
|
$0.000
|
$4.700
|
$0.000
|
|
1
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
24,653.130
|
$150.000
|
$0.000
|
$0.000
|
$0.000
|
$128.870
|
$0.000
|
|
1A
|
|
SUBGR WIDEN (DC)
|
SY
|
60,025.000
|
$4.000
|
$2.000
|
$3.300
|
$5.400
|
$0.000
|
$6.070
|
|
1A
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
57,166.670
|
$25.010
|
$14.000
|
$15.600
|
$11.300
|
$0.000
|
$16.450
|
|
1A
|
|
TACK COAT
|
GAL
|
67,769.970
|
$4.500
|
$1.000
|
$1.000
|
$3.700
|
$0.000
|
$3.660
|
|
1A
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
15,284.940
|
$150.000
|
$130.000
|
$137.500
|
$137.000
|
$0.000
|
$132.660
|
|
Totals: |
$32,098,757.749
|
$22,303,962.155
|
$22,737,174.312
|
$23,457,089.433
|
$23,512,697.370
|
$28,823,132.152
|