EXCAVATION (ROADWAY)
|
CY
|
6,392.000
|
$20.000
|
$30.000
|
$26.000
|
$28.700
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
36.000
|
$50.000
|
$100.000
|
$54.500
|
$250.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
6,491.000
|
$38.000
|
$65.000
|
$51.000
|
$62.700
|
|
|
BACKFILL (TY A OR B)
|
STA
|
10.000
|
$445.000
|
$550.000
|
$485.000
|
$750.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
57,501.000
|
$0.120
|
$0.120
|
$0.130
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
57,501.000
|
$0.120
|
$0.120
|
$0.140
|
$0.150
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
115,000.000
|
$0.140
|
$0.110
|
$0.120
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
924.000
|
$30.000
|
$20.000
|
$27.000
|
$35.000
|
|
|
CEMENT
|
TON
|
831.000
|
$277.500
|
$290.000
|
$315.000
|
$354.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
76,467.000
|
$5.000
|
$3.400
|
$5.400
|
$9.860
|
|
|
PRIME COAT (MC-30)
|
GAL
|
18,080.000
|
$5.000
|
$6.000
|
$5.150
|
$6.600
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
23,000.000
|
$4.500
|
$4.500
|
$4.050
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
5,000.000
|
$80.000
|
$75.000
|
$83.000
|
$80.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,361.000
|
$5.000
|
$7.000
|
$8.850
|
$7.500
|
|
|
PLANE ASPH CONC PAV(0" TO 8")
|
SY
|
1,493.000
|
$8.000
|
$10.000
|
$13.500
|
$12.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
64.000
|
$700.000
|
$800.000
|
$925.000
|
$1,053.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
200.000
|
$54.000
|
$76.000
|
$48.000
|
$120.500
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
212.000
|
$120.000
|
$152.000
|
$160.000
|
$169.650
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
552.000
|
$100.000
|
$94.000
|
$110.000
|
$87.750
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
32.000
|
$1,700.000
|
$1,250.000
|
$1,600.000
|
$1,872.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$2,500.000
|
$1,650.000
|
$2,700.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$1,000.000
|
$650.000
|
$1,100.000
|
$351.000
|
|
|
REMOV STR (PIPE)
|
LF
|
552.000
|
$15.000
|
$30.000
|
$13.000
|
$15.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$629,949.880
|
$590,000.000
|
$775,000.000
|
$705,335.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$4,500.000
|
$10,500.000
|
$28,500.000
|
$24,979.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,100.000
|
$3.500
|
$3.100
|
$3.250
|
$3.510
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,100.000
|
$1.250
|
$0.920
|
$0.980
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,400.000
|
$4.750
|
$3.100
|
$3.250
|
$3.510
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,400.000
|
$1.000
|
$0.820
|
$0.870
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
957.000
|
$50.000
|
$69.000
|
$42.500
|
$94.150
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,526.000
|
$25.000
|
$25.000
|
$23.000
|
$40.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
69,400.000
|
$0.150
|
$0.210
|
$0.100
|
$0.270
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
34,700.000
|
$0.300
|
$0.320
|
$0.140
|
$0.270
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
462.500
|
$25.000
|
$29.000
|
$30.500
|
$32.760
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$55.330
|
$38.000
|
$38.500
|
$41.540
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,093.670
|
$1,400.000
|
$1,400.000
|
$1,521.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$101.000
|
$75.000
|
$76.000
|
$81.900
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,200.000
|
$1,800.000
|
$1,800.000
|
$1,959.750
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
411.000
|
$5.000
|
$3.200
|
$3.250
|
$3.510
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$261.200
|
$320.000
|
$325.000
|
$351.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$3,100.000
|
$3,500.000
|
$3,600.000
|
$3,890.250
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$450.000
|
$290.000
|
$300.000
|
$409.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$500.000
|
$690.000
|
$705.000
|
$965.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$685.000
|
$750.000
|
$780.000
|
$1,140.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$785.000
|
$890.000
|
$925.000
|
$1,316.250
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
36.000
|
$350.000
|
$520.000
|
$535.000
|
$760.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
49.000
|
$183.000
|
$110.000
|
$110.000
|
$117.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
27.000
|
$50.830
|
$39.000
|
$40.500
|
$43.290
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,726.000
|
$2.000
|
$1.900
|
$1.550
|
$1.200
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
71,112.000
|
$0.500
|
$0.550
|
$0.570
|
$0.810
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,790.000
|
$0.500
|
$0.550
|
$0.570
|
$0.810
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
23,439.000
|
$0.500
|
$0.550
|
$0.570
|
$0.810
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
84.000
|
$20.000
|
$21.000
|
$22.000
|
$23.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
668.000
|
$4.000
|
$5.250
|
$5.450
|
$5.850
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
19,985.000
|
$100.000
|
$120.000
|
$109.200
|
$120.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
17,447.000
|
$108.000
|
$125.000
|
$120.000
|
$130.000
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
250.000
|
$135.000
|
$210.000
|
$210.000
|
$178.500
|
|
|
BONDING COURSE
|
GAL
|
18,380.000
|
$4.000
|
$4.500
|
$1.000
|
$5.500
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$204.000
|
$260.000
|
$325.000
|
$367.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$850.000
|
$260.000
|
$1,200.000
|
$1.000
|
|
Totals: |
$6,978,676.150
|
$7,882,206.690
|
$8,012,951.190
|
$9,036,989.110
|