Show Job Controls
Bid Cobra

TITUS BU 271E (0221-09-039)

Items: 63

County: TITUS
Length: 0.6730 MILES
Highway: BU 271E
District: ATLANTA
Control Number: 0221-09-039
DBE Goal: 0.0%
Project: F 2026(993)
Guaranty: $20,000.00
Time: 33 WORKING DAYS
Engineer's Estimate: $1,181,335.97
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263219
Type: RESURFACE ROADWAY
Project ID: A00196194
Contract Type: FEDERAL
Project Description: RESURFACE EXISTING 4-LANE ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,181,335.97
Over/Under Est: -7.29% -$86,153.32
Over/Under Est: -3.71% -$43,855.22
Amt Left: 3.86% $42,298.10
Over/Under Est: 4.17% $49,219.18
Amt Left: 12.36% $135,372.50
Delta: -8.18% -$93,074.40
$1,331,247.94
Over/Under Est: 12.69% $149,911.97
Amt Left: 21.55% $236,065.29
Delta: -8.18% -$100,692.79

Bid Items & Bid Tabulations

63 Total 0 of 63
TITUS  |  BU 271E  |  ATLANTA  |  0221-09-039  |  09/03/2026 1:00 PM CDT  |  $1,181,335.97  |  F 2026(993)  |  RESURF ROADWAY  |  33 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
RK HALL, LLC
REMOV CONC (RIPRAP)
SY 83.000 $25.000 $30.000 $25.000 $18.000 $16.500
REMOV CONC (CURB & GUTTER)
LF 228.000 $10.000 $11.000 $10.000 $10.000 $16.500
EMBANK (VEH)(OC)(TY C)
CY 18.000 $30.000 $90.000 $50.000 $60.000 $128.480
BACKFILL (TY A)
LF 1,236.000 $1.500 $3.000 $10.000 $5.000 $11.290
BLADING
STA 2.000 $250.000 $500.000 $1,000.000 $200.000 $373.680
BLOCK SODDING
SY 289.000 $6.000 $8.500 $10.000 $9.000 $11.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 195.000 $1.000 $3.500 $1.000 $3.500 $5.500
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 390.000 $1.000 $3.500 $1.000 $3.500 $8.250
VEGETATIVE WATERING
TGL 8.000 $40.000 $24.000 $100.000 $50.000 $127.310
SP MIXES SP-D SAC-A PG76-22
TON 3,206.000 $160.000 $165.000 $173.000 $165.000 $206.850
TACK COAT
GAL 1,042.000 $5.000 $5.000 $10.000 $6.000 $8.050
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,500.000 $40.000 $50.000 $29.000 $45.000 $45.980
PLANE ASPH CONC PAV(2")
SY 27,751.000 $5.000 $2.500 $5.000 $3.250 $4.350
PLANE ASPH CONC PAV (1.5")
SY 1,821.000 $5.000 $3.000 $5.000 $5.000 $5.780
CL C CONC (CURB OUTLET) (TY I)
EA 1.000 $1,500.000 $3,500.000 $1,000.000 $2,500.000 $1,650.000
RIPRAP (CONC)(CL B)
CY 19.000 $800.000 $600.000 $750.000 $800.000 $880.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 4.000 $200.000 $370.000 $500.000 $500.000 $440.000
CLEANING AND SEALING EXISTING JOINTS
LF 504.000 $30.000 $38.000 $75.000 $50.000 $34.100
RC PIPE (CL III)(18 IN)
LF 6.000 $80.000 $190.000 $100.000 $70.000 $66.000
RC PIPE (CL III)(36 IN)
LF 18.000 $160.000 $300.000 $250.000 $300.000 $330.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,300.000 $1,425.000 $1,000.000 $1,000.000 $1,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $2,550.000 $2,500.000 $2,750.000 $3,300.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $4,500.000 $3,950.000 $4,500.000 $3,850.000 $5,720.000
REMOV STR (SET)
EA 2.000 $400.000 $635.000 $500.000 $350.000 $275.000
REMOV STR (PIPE)
LF 14.000 $20.000 $91.000 $50.000 $20.000 $16.500
MOBILIZATION
LS 1.000 $110,000.000 $100,000.000 $100,000.000 $100,000.000 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $6,000.000 $5,400.000 $5,000.000 $20,000.000 $21,462.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,000.000 $1,000.000 $5,000.000 $10,000.000 $5,645.660
TMA (STATIONARY)
DAY 41.000 $225.000 $250.000 $250.000 $300.000 $457.780
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $350.000 $1,000.000 $300.000 $843.320
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 8.000 $50.000 $220.000 $85.000 $220.000 $110.000
ROCK FILTER DAMS (REMOVE)
LF 8.000 $20.000 $88.000 $10.000 $90.000 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $5.000 $11.000 $5.000 $11.000 $11.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $1.100 $2.200 $1.000 $2.500 $1.100
CONC CURB & GUTTER (TY II)
LF 258.000 $40.000 $50.000 $55.000 $50.000 $55.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $620.000 $700.000 $750.000 $700.000 $990.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $1,100.000 $1,175.000 $1,000.000 $1,200.000 $1,089.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 7.000 $650.000 $540.000 $850.000 $550.000 $660.000
REMOVE SM RD SN SUP&AM
EA 30.000 $110.000 $87.000 $100.000 $100.000 $110.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $130.000 $110.000 $35.000 $125.000 $88.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 85.000 $4.650 $4.700 $4.250 $10.000 $7.320
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 236.000 $6.000 $4.700 $4.250 $10.000 $7.320
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,320.000 $3.000 $1.300 $1.180 $2.500 $2.950
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 6,035.000 $2.000 $1.300 $1.380 $2.500 $2.950
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 393.000 $2.140 $1.500 $1.680 $2.500 $3.230
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 383.000 $11.000 $1.850 $1.680 $10.000 $7.630
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 840.000 $3.800 $1.300 $1.180 $2.500 $2.950
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 8,354.000 $2.200 $1.300 $1.180 $2.500 $2.950
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 58.000 $3.000 $1.200 $5.000 $5.500 $5.500
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 6,035.000 $1.000 $0.750 $1.000 $1.100 $1.100
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 1,320.000 $1.500 $0.770 $1.000 $1.100 $1.100
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 8,354.000 $1.000 $0.750 $1.000 $1.100 $1.100
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 840.000 $1.400 $0.770 $1.000 $1.100 $1.100
ALL-WTHER PM TY I (W) 8"(SLD)(100MIL)
LF 393.000 $5.000 $1.050 $3.000 $3.300 $3.300
PREFAB PM TY C (W)(24")(SLD)
LF 383.000 $13.800 $12.500 $13.000 $14.500 $14.300
PREFAB PM TY C (W)(ARROW)
EA 13.000 $250.000 $225.000 $215.000 $240.000 $236.500
PREFAB PM TY C (W)(TPL ARROW)
EA 2.000 $350.000 $340.000 $375.000 $415.000 $412.500
PREFAB PM TY C (W)(WORD)
EA 8.000 $280.000 $220.000 $255.000 $280.000 $280.500
PREFAB PM TY C (Y)(24")(SLD)
LF 63.000 $20.000 $12.500 $13.000 $14.500 $14.300
REFL PAV MRKR TY I-C
EA 85.000 $7.000 $4.750 $7.000 $7.700 $7.700
REFL PAV MRKR TY II-A-A
EA 236.000 $5.500 $4.750 $6.000 $6.600 $6.600
COMPOSITE GEOGRID FOR ASPHALT OVERLAY
SY 17,935.000 $5.000 $5.650 $1.000 $7.000 $3.580
TACK COAT
GAL 2,546.000 $5.750 $5.000 $5.500 $6.000 $7.120
Totals: $1,181,335.970 $1,095,182.650 $1,137,480.750 $1,230,555.150 $1,331,247.940
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $15,000.00