TOM GREEN US 87 (0069-07-113)

Items: 119

County: TOM GREEN
Length: 0.0000 MILES (0.3346 MILES)
Highway: US 87
District: SAN ANGELO
Control Number: 0069-07-113
DBE Goal: 0.0%
Project: STP 2026(864)HES
Guaranty: $36,000.00
Time: 52 WORKING DAYS
Engineer's Estimate: $1,800,039.59
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263233
Type: INTERSECTION IMPROVEMENT
Project ID: A00193246
Contract Type: FEDERAL
Project Description: INTERSECTION & OPERATIONAL IMPROVEMENTS INCLUDING INSTALLING TRAFFIC SIGNALS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (2)
E
Engineer's Estimate
$1,800,039.59
$2,825,728.44
Over/Under Est: 56.98% $1,025,688.85
$2,999,977.12
Over/Under Est: 66.66% $1,199,937.53
Amt Left: 6.17% $174,248.68

Bid Items & Bid Tabulations

119 Total 0 of 119
TOM GREEN  |  US 87  |  SAN ANGELO  |  0069-07-113  |  08/06/2026 1:00 PM CDT  |  $1,800,039.59  |  STP 2026(864)HES  |  INTERS IMPRV  |  52 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
RK HALL, LLC
REMOV CONC (RIPRAP)
SY 3.000 $30.000 $214.860 $220.930
REMOV CONC (CURB & GUTTER)
LF 532.000 $20.000 $18.540 $12.530
EXCAV (ROADWAY)
CY 750.000 $25.000 $91.510 $18.750
EMBANK (FNL)(OC)(TY B)
CY 633.000 $40.000 $52.590 $38.680
BACKFILL (TY B)
STA 23.000 $300.000 $316.300 $497.000
FURN & PLACE TOPSOIL (4")
SY 9,598.000 $2.000 $9.430 $2.730
DRILL SEED (PERM_RURAL_CLAY)
SY 9,598.000 $0.250 $0.590 $0.660
VEGETATIVE WATERING
TGL 150.000 $30.000 $59.580 $96.370
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,391.000 $90.000 $121.980 $95.900
PRIME COAT(MC-30 OR AE-P)
GAL 834.000 $9.000 $7.090 $9.390
AGGR (TY-B, GR-3)(SAC-B)
CY 19.000 $250.000 $346.940 $478.760
AGGR (TY-PB, GR-3)(SAC-B)
CY 19.000 $250.000 $435.060 $478.760
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 1,878.000 $8.000 $5.770 $6.520
SP MIXES SP-C SAC-B PG70-22
TON 4,248.000 $130.000 $175.460 $172.010
TACK COAT
GAL 1,540.000 $4.000 $3.610 $11.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 1,193.000 $125.000 $244.240 $202.760
PLANE ASPH CONC PAV (0" TO 2-1/2")
SY 7,589.000 $2.750 $9.830 $8.780
DRILL SHAFT (SIGN MTS) (24 IN)
LF 39.000 $250.000 $355.810 $236.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 60.000 $300.000 $627.900 $495.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $500.000 $906.970 $715.000
RIPRAP (CONC)(4 IN)
CY 1.500 $650.000 $1,323.540 $11,100.840
MOBILIZATION
LS 1.000 $160,912.690 $266,677.840 $299,002.360
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $10,000.000 $30,418.260 $30,140.750
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 118.000 $130.000 $112.220 $172.890
TMA (STATIONARY)
DAY 101.000 $235.000 $432.740 $273.400
TMA (MOBILE OPERATION)
DAY 10.000 $300.000 $873.990 $458.300
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $29.000 $40.760 $47.480
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $12.000 $18.210 $17.130
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 64.000 $10.000 $17.760 $17.740
BIODEG EROSN CONT LOGS (REMOVE)
LF 64.000 $1.000 $3.860 $5.710
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,950.000 $40.000 $17.760 $215.580
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,950.000 $16.000 $15.290 $44.350
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 4,311.000 $1.000 $3.700 $2.920
CONC MEDIAN
SY 217.000 $95.000 $345.290 $600.870
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $1,171.010 $3,155.540
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $9,000.000 $11,693.710 $13,063.740
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $3,550.000 $4,883.670 $3,850.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 4.000 $6,200.000 $11,860.330 $9,350.000
CONDT (PVC) (SCH 40) (2")
LF 1,600.000 $25.000 $11.160 $8.800
CONDT (PVC) (SCH 40) (4")
LF 150.000 $45.000 $41.860 $33.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 220.000 $30.000 $34.880 $27.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 300.000 $65.000 $48.840 $38.500
ELEC CONDR (NO.8) BARE
LF 2,390.000 $3.000 $2.790 $2.200
ELEC CONDR (NO.8) INSULATED
LF 3,900.000 $4.000 $3.140 $2.480
TRAY CABLE (4 CONDR) (12 AWG)
LF 535.000 $4.500 $6.980 $5.500
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,500.000 $2,790.670 $2,200.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $2,100.000 $4,186.000 $3,300.000
REMOVE GROUND BOX
EA 1.000 $400.000 $697.660 $550.000
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 1.000 $8,000.000 $17,441.670 $13,750.000
ALUMINUM SIGNS (TY A)
SF 78.000 $50.000 $103.250 $82.500
ALUMINUM SIGNS (TY G)
SF 189.750 $36.000 $54.420 $39.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $750.000 $1,010.220 $852.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $810.000 $1,187.430 $907.500
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,256.000 $1,738.580 $1,100.000
REMOVE SM RD SN SUP&AM
EA 21.000 $100.000 $174.590 $110.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $200.000 $95.180 $38.500
INSTALL LRSS (STRUCT STEEL)
LB 1,439.600 $8.500 $11.160 $7.980
REMOVE LRSA
EA 1.000 $1,500.000 $2,265.800 $1,100.000
INSTL OM LG RD SIGN (2-OM-TY1)Y
EA 3.000 $50.000 $107.440 $74.800
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH(BI)
EA 4.000 $150.000 $267.910 $220.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 17.000 $100.000 $18.140 $13.200
INSTL OM SM RD SIGN (1-OM-PW)R
EA 9.000 $50.000 $18.140 $16.500
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 624.000 $0.600 $2.090 $1.650
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 38.000 $0.800 $2.090 $1.650
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,115.000 $0.700 $1.400 $1.100
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 50.000 $3.300 $24.420 $19.250
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 3.000 $75.000 $279.070 $220.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 3.000 $75.000 $418.600 $330.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 3,839.000 $0.400 $1.400 $1.100
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 414.000 $3.500 $24.420 $19.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 271.000 $2.000 $2.790 $2.200
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 6.000 $100.000 $104.650 $82.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 4,962.000 $1.000 $2.790 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,246.000 $2.000 $4.160 $6.080
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 112.000 $2.000 $5.680 $5.680
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 983.000 $9.000 $15.350 $12.100
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $25.000 $313.950 $247.500
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $450.000 $558.140 $440.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000 $300.000 $453.480 $357.500
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 17.000 $35.000 $69.770 $55.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 414.000 $10.000 $15.700 $12.380
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 1,600.000 $0.900 $1.470 $1.160
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 9,749.000 $0.900 $1.470 $1.160
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 13,300.000 $0.900 $1.470 $1.160
PAVEMENT SLER 6"
LF 380.000 $0.500 $2.790 $2.200
PAVEMENT SLER 8"
LF 129.000 $0.500 $2.790 $2.200
PAVEMENT SLER 24"
LF 336.000 $3.000 $6.980 $5.500
PAVEMENT SLER (ARROW)
EA 4.000 $180.000 $139.540 $110.000
PAVEMENT SLER (WORD)
EA 3.000 $100.000 $209.300 $165.000
TY I HIGH PERF PM (W)6"(DOT)(100 MIL)
LF 1,236.000 $1.250 $1.470 $1.160
TY I HIGH PERF PM (W)8"(DOT)(100 MIL)
LF 128.000 $1.500 $1.740 $1.380
TY I HIGH PERF PM(W)8"(SLD)(100 MIL)
LF 6,104.000 $1.250 $1.740 $1.380
REFL PAV MRKR TY II-A-A
EA 364.000 $6.000 $10.470 $8.250
REFL PAV MRKR TY II-C-R
EA 488.000 $6.000 $10.470 $8.250
ELIM EXT PM & MRKS (4")
LF 1,511.000 $1.000 $3.490 $2.750
ELIM EXT PM & MRKS (6")
LF 80.000 $0.500 $3.490 $2.750
ELIM EXT PM & MRKS (8")
LF 555.000 $0.750 $3.490 $2.750
ELIM EXT PM & MRKS (24")
LF 362.000 $3.000 $9.070 $7.150
ELIM EXT PM & MRKS (ARROW)
EA 3.000 $60.000 $153.490 $121.000
ELIM EXT PM & MRKS (WORD)
EA 3.000 $60.000 $223.250 $176.000
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 19.000 $25.000 $48.840 $38.500
PAV SURF PREP FOR MRK (6")
LF 380.000 $0.200 $1.760 $1.390
PAV SURF PREP FOR MRK (8")
LF 129.000 $0.200 $2.790 $2.200
PAV SURF PREP FOR MRK (24")
LF 336.000 $1.000 $5.580 $4.400
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $50.000 $139.540 $110.000
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $50.000 $209.300 $165.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $60,000.000 $76,743.330 $60,500.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $8,000.000 $23,506.860 $16,500.000
VEH SIG SEC (12")LED(GRN)
EA 2.000 $350.000 $488.370 $385.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $350.000 $488.370 $385.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $350.000 $488.370 $385.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $350.000 $488.370 $385.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $350.000 $488.370 $385.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $350.000 $488.370 $385.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 6.000 $225.000 $209.300 $165.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 360.000 $4.000 $6.980 $5.500
TRF SIG CBL (TY A)(12 AWG)(20 CONDR)
LF 460.000 $10.000 $13.950 $11.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 1.000 $18,000.000 $38,371.660 $30,250.000
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
EA 1.000 $20,000.000 $41,859.990 $33,000.000
Totals: $1,800,039.590 $2,825,728.431 $2,999,977.118
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $18,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $23,000.00