Show Job Controls
Bid Cobra

TOM GREEN AVE N (0907-00-239)

Items: 62

County: TOM GREEN
Length: 0.0000 MILES
Highway: AVE N
District: SAN ANGELO
Control Number: 0907-00-239
DBE Goal: 0.0%
Project: STP 2026(865)VRUG
Guaranty: $11,000.00
Time: 70 WORKING DAYS
Engineer's Estimate: $579,255.40
Date: 08/05/2026 1:00 PM CDT (6 weeks ago) Changed
Contract Number: 8263243
Type: INSTALL TRAFFIC SIGNAL
Project ID: A00210758
Contract Type: FEDERAL
Project Description: REPLACE TRAFFIC SIGNALS AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 3 files available
Bidders (3)
E
Engineer's Estimate
$579,255.40
$589,192.20
Over/Under Est: 1.72% $9,936.80
$675,998.15
Over/Under Est: 16.7% $96,742.75
Amt Left: 14.73% $86,805.95
Over/Under Est: 38.11% $220,744.60
Amt Left: 35.78% $210,807.80
Delta: -18.34% -$124,001.85

Bid Items & Bid Tabulations

62 Total 0 of 62
TOM GREEN  |  AVE N  |  SAN ANGELO  |  0907-00-239  |  08/05/2026 1:00 PM CDT  |  $579,255.40  |  STP 2026(865)VRUG  |  INSTL TRAF SIGNAL  |  70 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
YUNEX LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 357.000 $20.000 $25.000 $28.000 $84.000
REMOV CONC (CURB & GUTTER)
LF 347.000 $15.000 $10.000 $23.000 $56.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 148.000 $50.000 $25.000 $17.000 $91.000
DRILL SHAFT (24 IN)
LF 48.000 $255.000 $300.000 $222.000 $205.000
DRILL SHAFT (36 IN)
LF 42.000 $290.000 $500.000 $471.000 $375.000
DRILL SHAFT (48 IN)
LF 22.000 $390.000 $700.000 $908.000 $900.000
MOBILIZATION
LS 1.000 $54,900.000 $55,000.000 $117,545.000 $72,315.750
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $12,000.000 $4,000.000 $8,616.000 $3,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $110.000 $100.000 $77.000 $46.000
TMA (STATIONARY)
DAY 5.000 $350.000 $500.000 $184.000 $290.000
TMA (MOBILE OPERATION)
DAY 20.000 $160.000 $0.010 $200.000 $290.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 230.000 $8.000 $8.000 $17.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 230.000 $2.000 $2.000 $6.000 $1.000
CONC CURB & GUTTER (TY I)
LF 366.000 $30.000 $80.000 $140.000 $250.000
CONC SIDEWALKS (4")
SY 353.000 $120.000 $150.000 $112.000 $230.000
CURB RAMPS (TY 1)
EA 7.000 $3,600.000 $3,500.000 $2,778.000 $7,000.000
CURB RAMPS (TY 2)
EA 3.000 $3,600.000 $3,500.000 $5,000.000 $7,350.000
CONDT (PVC) (SCH 80) (2")
LF 123.000 $20.000 $25.000 $23.000 $25.750
CONDT (PVC) (SCH 80) (3")
LF 141.000 $25.000 $30.000 $27.000 $28.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 351.000 $37.000 $70.000 $54.000 $48.000
CONDUIT (PREPARE)
LF 60.000 $5.000 $3.000 $6.000 $2.250
ELEC CONDR (NO.6) BARE
LF 493.000 $2.500 $2.000 $2.420 $3.000
ELEC CONDR (NO.6) INSULATED
LF 1,176.000 $2.500 $2.500 $2.790 $3.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 588.000 $10.000 $3.000 $3.710 $5.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $2,000.000 $1,650.000 $1,928.000 $1,750.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $500.000 $800.000 $800.000
ELC SRV TY D 120/240 100(NS)SS(E)PS(U)
EA 1.000 $15,000.000 $8,500.000 $9,182.000 $8,300.000
ALUMINUM SIGNS (TY A)
SF 42.800 $50.000 $50.000 $37.530 $44.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 52.700 $32.000 $50.000 $32.910 $44.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $850.000 $1,500.000 $858.940 $975.000
REMOVE SM RD SN SUP&AM
EA 4.000 $275.000 $200.000 $150.000 $350.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 500.000 $1.500 $5.000 $5.560 $2.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 325.000 $8.000 $15.000 $16.670 $10.500
PAVEMENT SLER (ARROW)
EA 2.000 $70.000 $15.000 $111.120 $42.000
PAVEMENT SLER (WORD)
EA 2.000 $35.000 $175.000 $138.890 $42.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 200.000 $1.500 $5.000 $4.450 $2.800
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 2,000.000 $1.000 $2.000 $4.450 $1.000
PREFAB PM TY C (W)(ARROW)
EA 2.000 $215.000 $550.000 $333.340 $350.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $250.000 $600.000 $444.450 $390.000
REFL PAV MRKR TY I-C
EA 10.000 $5.000 $15.000 $11.120 $28.000
REFL PAV MRKR TY II-A-A
EA 20.000 $5.000 $15.000 $11.120 $28.000
ELIM EXT PM & MRKS (6")
LF 2,000.000 $2.500 $1.500 $3.890 $1.150
ELIM EXT PM & MRKS (24")
LF 200.000 $4.500 $5.000 $5.560 $5.600
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $50,000.000 $25,000.000 $41,506.000 $33,250.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $16,215.000 $8,500.000 $15,378.000 $10,000.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $35,000.000 $25,000.000 $39,324.000 $29,000.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $350.000 $350.000 $306.000 $425.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $350.000 $350.000 $306.000 $425.000
VEH SIG SEC (12")LED(RED)
EA 10.000 $350.000 $350.000 $306.000 $425.000
PED SIG SEC (LED)(COUNTDOWN)
EA 10.000 $800.000 $675.000 $556.000 $640.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 10.000 $215.000 $150.000 $223.000 $230.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,433.000 $2.500 $2.000 $1.960 $4.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 732.000 $3.500 $3.000 $3.610 $6.500
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 470.000 $8.000 $9.000 $6.670 $10.500
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000 $15,000.000 $16,000.000 $12,487.000 $16,800.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $16,000.000 $18,000.000 $15,082.000 $19,800.000
INS TRF SIG PL AM(S)2 ARM(55-44')LUM
EA 1.000 $20,000.000 $43,000.000 $37,634.000 $49,000.000
PED POLE ASSEMBLY
EA 8.000 $3,000.000 $2,000.000 $1,512.000 $1,600.000
PED DETECT PUSH BUTTON (APS)
EA 10.000 $1,100.000 $1,000.000 $769.000 $1,050.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,500.000 $4,000.000 $3,817.000 $5,750.000
INSTALL RADAR VEHICLE DETECTION SYSTEM
EA 1.000 $10,000.000 $30,000.000 $2,400.000 $35,500.000
VIVDS CAM ASSY (REMOVE)
EA 2.000 $80.000 $1,000.000 $400.000 $450.000
Totals: $579,255.400 $589,192.200 $675,998.151 $800,000.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $2,000.00