|
|
TOM-C PG76-22 SAC-B
|
TON
|
3,849.000
|
$175.000
|
$180.000
|
$135.000
|
$230.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
3,406.000
|
$47.500
|
$41.000
|
$33.000
|
$54.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 1")
|
SY
|
68,057.000
|
$1.600
|
$0.900
|
$1.600
|
$2.900
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
354.000
|
$50.000
|
$80.000
|
$62.960
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$113,370.000
|
$25,889.000
|
$117,871.400
|
$70,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$7,500.000
|
$12,500.000
|
$45,000.000
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
125.000
|
$105.000
|
$73.000
|
$151.660
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
38.000
|
$350.000
|
$316.000
|
$303.310
|
$355.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$500.000
|
$100.000
|
$303.310
|
$250.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$8.000
|
$6.000
|
$7.850
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.500
|
$3.000
|
$1.990
|
$10.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
100.000
|
$75.000
|
$65.000
|
$37.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
32.000
|
$27.000
|
$51.000
|
$50.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
7.000
|
$45.000
|
$51.000
|
$50.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
32.000
|
$25.000
|
$51.000
|
$50.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
14.000
|
$42.000
|
$51.000
|
$50.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
237.000
|
$0.750
|
$0.600
|
$0.650
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
1,111.000
|
$3.000
|
$1.250
|
$1.350
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
6,606.000
|
$2.500
|
$0.700
|
$0.760
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
1,047.000
|
$5.500
|
$1.500
|
$1.620
|
$3.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
2,230.000
|
$3.740
|
$3.000
|
$3.240
|
$7.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
12.000
|
$140.000
|
$75.000
|
$81.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
17.000
|
$200.000
|
$87.750
|
$94.770
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
20.000
|
$70.000
|
$20.000
|
$21.600
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
5,566.000
|
$0.550
|
$0.500
|
$0.540
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
|
LF
|
172.000
|
$3.500
|
$1.500
|
$1.620
|
$3.400
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
24,056.000
|
$1.000
|
$0.650
|
$0.700
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
2.000
|
$185.000
|
$225.000
|
$243.000
|
$374.000
|
|
|
WK ZN PAV MRK REMOV (W)(UTURN ARROW)
|
EA
|
6.000
|
$320.000
|
$225.000
|
$243.000
|
$374.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,763.000
|
$2.500
|
$1.300
|
$1.350
|
$1.760
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,895.000
|
$1.750
|
$1.050
|
$1.080
|
$1.150
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,047.000
|
$7.150
|
$3.200
|
$3.240
|
$7.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,230.000
|
$6.000
|
$6.400
|
$6.480
|
$10.600
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
22.000
|
$175.000
|
$170.000
|
$181.980
|
$205.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
6.000
|
$300.000
|
$215.000
|
$229.500
|
$340.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
7.000
|
$320.000
|
$215.000
|
$229.500
|
$700.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
29.000
|
$200.000
|
$180.000
|
$191.700
|
$340.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
20.000
|
$70.000
|
$36.000
|
$37.800
|
$106.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
172.000
|
$9.000
|
$3.200
|
$3.240
|
$7.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,670.000
|
$2.350
|
$0.600
|
$0.650
|
$0.340
|
|
|
PAVEMENT SLER 8"
|
LF
|
1,941.000
|
$2.500
|
$0.700
|
$0.760
|
$0.430
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
10.000
|
$80.000
|
$75.000
|
$81.000
|
$106.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
12.000
|
$70.000
|
$88.000
|
$94.770
|
$106.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
4.000
|
$70.000
|
$95.000
|
$102.600
|
$151.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
1.000
|
$100.000
|
$95.000
|
$102.600
|
$250.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
24,235.000
|
$0.850
|
$0.750
|
$0.760
|
$1.060
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
1,112.000
|
$0.700
|
$0.750
|
$0.760
|
$1.060
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,361.000
|
$1.600
|
$0.750
|
$0.760
|
$1.060
|
|
PREFAB PM TY B (W)(6")(BRK)CONTRAST
|
LF
|
2,765.000
|
$15.000
|
$8.750
|
$9.180
|
$17.760
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
15.000
|
$8.000
|
$5.250
|
$5.400
|
$7.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
691.000
|
$6.000
|
$5.250
|
$5.400
|
$7.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
2,960.000
|
$1.500
|
$0.800
|
$0.810
|
$1.600
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,941.000
|
$2.000
|
$1.550
|
$1.620
|
$1.600
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
10.000
|
$115.000
|
$101.000
|
$108.000
|
$70.000
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
4.000
|
$200.000
|
$101.000
|
$108.000
|
$70.000
|
|
|
ELIM EXT PM & MRKS (UTURN ARROW)
|
EA
|
1.000
|
$90.000
|
$101.000
|
$108.000
|
$160.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
12.000
|
$130.000
|
$101.000
|
$108.000
|
$70.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,960.000
|
$0.800
|
$0.100
|
$0.110
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,941.000
|
$0.900
|
$0.200
|
$0.220
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
10.000
|
$35.000
|
$20.000
|
$21.600
|
$43.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
$40.000
|
$25.000
|
$27.000
|
$61.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
1.000
|
$45.000
|
$25.000
|
$27.000
|
$77.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
12.000
|
$35.000
|
$20.000
|
$21.600
|
$77.000
|
|
|
BONDING COURSE
|
GAL
|
6,130.000
|
$5.000
|
$3.500
|
$3.500
|
$7.500
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
24.000
|
$800.000
|
$300.000
|
$500.000
|
$450.000
|
|
Totals: |
$1,418,010.400
|
$1,181,539.250
|
$1,201,194.940
|
$1,798,038.440
|