REMOV CONC (PAVERS)
|
SY
|
6.000
|
$25.000
|
$20.000
|
$100.000
|
$6,000.000
|
$171.000
|
$580.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
164.000
|
$40.000
|
$25.000
|
$16.000
|
$90.000
|
$57.000
|
$75.000
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
126.000
|
$19.000
|
$5.000
|
$16.000
|
$42.000
|
$18.000
|
$57.000
|
|
|
RMV (21") TRT/UNTRT BASE & ASPH PAV
|
SY
|
10.000
|
$30.000
|
$154.000
|
$53.000
|
$560.000
|
$114.000
|
$109.000
|
|
|
SUBGR WIDEN (OC)
|
SY
|
30.000
|
$20.000
|
$170.000
|
$36.000
|
$300.000
|
$968.000
|
$170.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
8.000
|
$2.500
|
$30.000
|
$120.000
|
$24.000
|
$171.000
|
$22.250
|
|
|
BLOCK SODDING
|
SY
|
72.000
|
$10.000
|
$30.000
|
$20.000
|
$24.000
|
$74.000
|
$28.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
20.000
|
$235.000
|
$280.000
|
$230.000
|
$500.000
|
$626.000
|
$250.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
3.000
|
$600.000
|
$600.000
|
$300.000
|
$1,500.000
|
$683.000
|
$250.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
165.000
|
$250.000
|
$260.000
|
$290.000
|
$285.000
|
$347.000
|
$500.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
182.000
|
$515.000
|
$280.000
|
$360.000
|
$497.000
|
$391.000
|
$620.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
92.000
|
$670.000
|
$410.000
|
$500.000
|
$740.000
|
$523.000
|
$850.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$211,298.120
|
$175,000.000
|
$239,945.130
|
$150,000.000
|
$117,000.000
|
$260,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$4,000.000
|
$2,500.000
|
$5,000.000
|
$3,000.000
|
$3,983.000
|
$5,980.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
8.000
|
$500.000
|
$170.000
|
$110.000
|
$500.000
|
$192.000
|
$165.000
|
|
|
TMA (STATIONARY)
|
DAY
|
24.000
|
$250.000
|
$700.000
|
$57.000
|
$450.000
|
$181.000
|
$410.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$250.000
|
$80.000
|
$7.250
|
$150.000
|
$181.000
|
$155.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
800.000
|
$8.000
|
$2.000
|
$4.500
|
$16.000
|
$10.000
|
$16.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
800.000
|
$2.750
|
$1.000
|
$1.500
|
$2.000
|
$4.000
|
$2.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
4.000
|
$430.000
|
$130.000
|
$56.000
|
$1,000.000
|
$569.000
|
$650.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
72.000
|
$65.000
|
$100.000
|
$36.000
|
$74.000
|
$86.000
|
$80.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
56.000
|
$150.000
|
$140.000
|
$120.000
|
$200.000
|
$176.000
|
$210.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$3,000.000
|
$2,500.000
|
$3,300.000
|
$4,200.000
|
$3,983.000
|
$3,050.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$6,600.000
|
$5,650.000
|
$3,300.000
|
$9,000.000
|
$5,121.790
|
$4,318.850
|
|
|
CURB RAMPS (TY 2)
|
SY
|
33.000
|
$1,100.000
|
$200.000
|
$120.000
|
$400.000
|
$251.000
|
$325.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
2.000
|
$330.000
|
$175.000
|
$190.000
|
$1,200.000
|
$911.000
|
$965.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,853.000
|
$20.000
|
$13.000
|
$10.000
|
$16.000
|
$23.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
2,210.000
|
$30.000
|
$17.500
|
$18.000
|
$22.000
|
$26.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
5,552.000
|
$40.000
|
$30.000
|
$25.000
|
$43.000
|
$32.000
|
$29.000
|
|
|
CONDT (RM) (2")
|
LF
|
390.000
|
$35.000
|
$33.000
|
$53.000
|
$55.000
|
$36.000
|
$29.000
|
|
|
CONDT (RM) (3")
|
LF
|
780.000
|
$60.000
|
$37.000
|
$75.000
|
$65.000
|
$58.000
|
$45.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
10,955.000
|
$2.250
|
$1.440
|
$1.650
|
$1.200
|
$1.920
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
22,207.000
|
$2.500
|
$1.750
|
$1.650
|
$1.300
|
$1.920
|
$2.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,260.000
|
$2.500
|
$2.100
|
$2.100
|
$3.000
|
$2.430
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,500.000
|
$2.750
|
$2.250
|
$2.150
|
$4.000
|
$2.430
|
$2.500
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
43.000
|
$1,750.000
|
$1,300.000
|
$1,500.000
|
$1,900.000
|
$1,726.000
|
$1,725.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)PS(U)
|
EA
|
2.000
|
$5,300.000
|
$8,000.000
|
$7,700.000
|
$7,500.000
|
$6,687.000
|
$6,350.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
5.000
|
$9,000.000
|
$10,000.000
|
$8,400.000
|
$5,800.000
|
$7,618.000
|
$7,100.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(N)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$7,600.000
|
$7,600.000
|
$7,000.000
|
$5,914.000
|
$5,800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
603.000
|
$45.000
|
$30.000
|
$34.000
|
$50.000
|
$45.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$950.000
|
$1,000.000
|
$950.000
|
$1,800.000
|
$1,138.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,100.000
|
$1,500.000
|
$1,200.000
|
$1,800.000
|
$1,707.000
|
$1,300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
19.000
|
$175.000
|
$127.000
|
$100.000
|
$65.000
|
$171.000
|
$180.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
190.000
|
$5.500
|
$1.450
|
$5.000
|
$6.000
|
$1.650
|
$9.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,161.000
|
$2.500
|
$1.350
|
$1.650
|
$5.000
|
$1.540
|
$11.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,750.000
|
$15.000
|
$10.000
|
$8.000
|
$15.000
|
$11.370
|
$21.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
17.000
|
$290.000
|
$300.000
|
$200.000
|
$230.000
|
$342.000
|
$390.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
8.000
|
$310.000
|
$300.000
|
$300.000
|
$250.000
|
$342.000
|
$445.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
17.000
|
$300.000
|
$300.000
|
$250.000
|
$250.000
|
$342.000
|
$335.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
16.000
|
$65.000
|
$60.000
|
$38.000
|
$85.000
|
$69.000
|
$75.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
8.000
|
$8.000
|
$5.000
|
$4.000
|
$13.000
|
$6.000
|
$5.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,725.000
|
$4.000
|
$0.750
|
$0.500
|
$1.500
|
$0.850
|
$0.750
|
|
|
PAVEMENT SLER 8"
|
LF
|
900.000
|
$10.000
|
$0.950
|
$0.650
|
$2.000
|
$1.100
|
$1.250
|
|
|
PAVEMENT SLER 24"
|
LF
|
422.000
|
$12.000
|
$3.000
|
$3.850
|
$2.300
|
$44.000
|
$7.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
4.000
|
$175.000
|
$35.000
|
$73.000
|
$70.000
|
$40.000
|
$140.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
4.000
|
$175.000
|
$35.000
|
$83.000
|
$85.000
|
$40.000
|
$140.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
8.000
|
$60.000
|
$35.000
|
$93.000
|
$100.000
|
$40.000
|
$140.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
16.000
|
$50.000
|
$25.000
|
$15.000
|
$48.000
|
$29.000
|
$45.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
1,180.000
|
$2.250
|
$1.250
|
$1.250
|
$1.000
|
$1.500
|
$1.750
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
2,558.000
|
$3.500
|
$1.150
|
$1.250
|
$3.000
|
$1.400
|
$2.250
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,710.000
|
$1.000
|
$1.250
|
$1.250
|
$1.000
|
$1.420
|
$1.750
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,909.000
|
$2.000
|
$1.150
|
$1.250
|
$3.000
|
$1.400
|
$1.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
168.000
|
$9.000
|
$7.000
|
$7.500
|
$11.000
|
$8.000
|
$14.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
150.000
|
$9.000
|
$7.000
|
$7.500
|
$11.000
|
$8.000
|
$14.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
80.000
|
$8.000
|
$7.000
|
$7.500
|
$11.000
|
$8.000
|
$14.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
5,261.000
|
$2.250
|
$1.000
|
$1.000
|
$1.200
|
$1.150
|
$6.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
4,454.000
|
$4.000
|
$1.400
|
$1.500
|
$2.000
|
$1.600
|
$17.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,366.000
|
$4.500
|
$1.800
|
$2.000
|
$2.500
|
$2.050
|
$17.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
252.000
|
$8.500
|
$4.000
|
$3.000
|
$5.000
|
$4.550
|
$17.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
358.000
|
$10.250
|
$6.000
|
$6.000
|
$62.000
|
$6.830
|
$25.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
13.000
|
$275.000
|
$80.000
|
$130.000
|
$90.000
|
$92.000
|
$330.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
13.000
|
$325.000
|
$80.000
|
$130.000
|
$100.000
|
$92.000
|
$330.000
|
|
|
ELIM EXT PM & MRKS (18")(YLD TRI)
|
EA
|
8.000
|
$20.000
|
$60.000
|
$35.000
|
$25.000
|
$69.000
|
$110.000
|
|
|
ELIM EXT PM & MRKS (RUMBLE STRIP)
|
LF
|
160.000
|
$20.000
|
$4.000
|
$10.000
|
$15.000
|
$4.560
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,628.000
|
$1.000
|
$0.200
|
$0.200
|
$1.000
|
$0.250
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,075.000
|
$1.000
|
$0.400
|
$0.300
|
$1.000
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,607.000
|
$4.000
|
$1.200
|
$1.000
|
$1.000
|
$1.400
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
13.000
|
$40.000
|
$30.000
|
$35.000
|
$1.000
|
$35.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$22.000
|
$30.000
|
$45.000
|
$1.000
|
$35.000
|
$60.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
13.000
|
$40.000
|
$30.000
|
$40.000
|
$1.000
|
$35.000
|
$60.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$9,000.000
|
$7,000.000
|
$6,200.000
|
$1,500.000
|
$4,233.000
|
$7,500.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
6.000
|
$12,500.000
|
$11,000.000
|
$7,600.000
|
$5,000.000
|
$35,000.000
|
$8,700.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
58.000
|
$375.000
|
$300.000
|
$340.000
|
$290.000
|
$280.000
|
$300.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
14.000
|
$390.000
|
$300.000
|
$340.000
|
$290.000
|
$280.000
|
$300.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
84.000
|
$390.000
|
$300.000
|
$340.000
|
$290.000
|
$240.000
|
$300.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
22.000
|
$380.000
|
$300.000
|
$340.000
|
$290.000
|
$280.000
|
$300.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
74.000
|
$490.000
|
$300.000
|
$340.000
|
$290.000
|
$280.000
|
$300.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
12.000
|
$385.000
|
$300.000
|
$340.000
|
$290.000
|
$280.000
|
$300.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
16.000
|
$1,000.000
|
$680.000
|
$760.000
|
$900.000
|
$708.000
|
$600.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
32.000
|
$225.000
|
$125.000
|
$120.000
|
$90.000
|
$264.000
|
$150.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
12.000
|
$215.000
|
$220.000
|
$240.000
|
$190.000
|
$471.000
|
$300.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
58.000
|
$225.000
|
$145.000
|
$160.000
|
$150.000
|
$510.000
|
$250.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
4,797.000
|
$2.000
|
$1.800
|
$1.500
|
$1.500
|
$3.050
|
$1.750
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
1,550.000
|
$3.500
|
$1.500
|
$1.250
|
$1.500
|
$3.050
|
$1.750
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
16,770.000
|
$3.250
|
$2.150
|
$2.050
|
$2.000
|
$3.600
|
$2.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
3,592.000
|
$5.000
|
$2.600
|
$2.500
|
$3.000
|
$4.350
|
$2.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
5.000
|
$6,500.000
|
$6,900.000
|
$6,800.000
|
$8,000.000
|
$8,073.000
|
$11,000.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
6.000
|
$875.000
|
$1,200.000
|
$660.000
|
$1,500.000
|
$800.000
|
$525.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
1.000
|
$11,500.000
|
$10,250.000
|
$7,900.000
|
$10,000.000
|
$9,000.000
|
$9,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
3.000
|
$13,000.000
|
$11,500.000
|
$11,500.000
|
$12,000.000
|
$12,200.000
|
$11,000.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
2.000
|
$10,500.000
|
$10,500.000
|
$8,400.000
|
$12,500.000
|
$9,500.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
2.000
|
$14,000.000
|
$14,500.000
|
$11,600.000
|
$13,000.000
|
$12,300.000
|
$11,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
$14,000.000
|
$11,100.000
|
$9,800.000
|
$10,500.000
|
$10,700.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
3.000
|
$15,000.000
|
$12,550.000
|
$12,800.000
|
$11,000.000
|
$13,400.000
|
$11,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$15,250.000
|
$12,350.000
|
$10,900.000
|
$13,000.000
|
$11,700.000
|
$11,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$15,000.000
|
$16,500.000
|
$14,200.000
|
$16,000.000
|
$14,700.000
|
$13,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
2.000
|
$17,000.000
|
$13,000.000
|
$12,000.000
|
$14,000.000
|
$12,100.000
|
$12,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
6.000
|
$13,500.000
|
$17,000.000
|
$15,300.000
|
$18,000.000
|
$15,100.000
|
$14,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
3.000
|
$15,000.000
|
$15,500.000
|
$15,900.000
|
$18,500.000
|
$15,600.000
|
$14,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
3.000
|
$28,000.000
|
$37,000.000
|
$40,900.000
|
$30,000.000
|
$38,900.000
|
$33,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$33,000.000
|
$40,500.000
|
$42,600.000
|
$31,000.000
|
$40,400.000
|
$35,250.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(28-24')LUM
|
EA
|
1.000
|
$22,000.000
|
$16,200.000
|
$17,400.000
|
$15,000.000
|
$17,400.000
|
$13,600.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
16.000
|
$3,500.000
|
$2,400.000
|
$2,500.000
|
$4,000.000
|
$2,684.000
|
$2,600.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
24.000
|
$1,800.000
|
$900.000
|
$920.000
|
$800.000
|
$1,151.000
|
$900.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$4,000.000
|
$4,500.000
|
$3,800.000
|
$3,500.000
|
$3,773.000
|
$3,900.000
|
|
|
BONDING COURSE
|
GAL
|
3.000
|
$7.500
|
$50.000
|
$100.000
|
$100.000
|
$114.000
|
$80.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
745.000
|
$3.000
|
$2.500
|
$1.250
|
$3.000
|
$2.050
|
$2.000
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
6.000
|
$8,000.000
|
$8,500.000
|
$8,600.000
|
$8,800.000
|
$8,500.000
|
$7,400.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
25.000
|
$7,000.000
|
$7,500.000
|
$8,500.000
|
$7,500.000
|
$8,845.000
|
$7,500.000
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
15.000
|
$7,000.000
|
$7,500.000
|
$8,900.000
|
$7,500.000
|
$8,930.000
|
$8,000.000
|
|
|
PREFORMED IN-LANE (TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$20.000
|
$15.000
|
$20.000
|
$60.000
|
$17.100
|
$40.000
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
16.000
|
$1,200.000
|
$500.000
|
$1,200.000
|
$900.000
|
$783.000
|
$1,350.000
|
|
Totals: |
$2,764,604.620
|
$2,265,740.800
|
$2,399,451.380
|
$2,608,824.900
|
$2,724,846.110
|
$2,764,200.000
|