PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
10.000
|
$1,825.000
|
$1,490.000
|
$3,000.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
10.000
|
$3,100.000
|
$2,290.000
|
$4,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
187.000
|
$79.140
|
$187.000
|
$250.000
|
|
|
REMOVING CONC (MISC)
|
CY
|
140.000
|
$525.000
|
$230.000
|
$250.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
357.000
|
$31.670
|
$120.000
|
$150.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
50.000
|
$31.670
|
$120.000
|
$150.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
70.000
|
$30.000
|
$115.000
|
$250.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
5.000
|
$195.000
|
$545.000
|
$150.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
45.000
|
$109.000
|
$766.000
|
$1,000.000
|
|
|
CEM STABIL BKFL
|
CY
|
6.000
|
$235.000
|
$1,200.000
|
$500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
192.000
|
$375.000
|
$1,000.000
|
$1,250.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
340.000
|
$28.670
|
$50.000
|
$80.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
4.000
|
$185.000
|
$340.000
|
$650.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
650.000
|
$300.000
|
$425.000
|
$575.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
5.000
|
$264.220
|
$500.000
|
$525.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
8.000
|
$8,000.000
|
$8,000.000
|
$4,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
24.000
|
$657.550
|
$2,045.000
|
$2,000.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
4.000
|
$1,077.580
|
$2,045.000
|
$2,100.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
365.000
|
$380.480
|
$285.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
578.000
|
$300.000
|
$270.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,736.000
|
$230.000
|
$270.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(21 IN)
|
CY
|
803.000
|
$150.000
|
$270.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
652.000
|
$200.000
|
$270.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
154.000
|
$265.000
|
$295.000
|
$400.000
|
|
|
BEDDING MATERIAL (6 IN)
|
CY
|
30.000
|
$300.000
|
$345.000
|
$1,000.000
|
|
|
RIPRAP (CEM STAB)(6 IN)
|
CY
|
3.000
|
$400.000
|
$1,145.000
|
$425.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
513.000
|
$45.630
|
$60.000
|
$80.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
1,820.000
|
$47.200
|
$42.000
|
$85.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (SEJ)
|
LF
|
90.000
|
$110.000
|
$150.000
|
$100.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM I)
|
LS
|
1.000
|
$195,850.000
|
$260,000.000
|
$225,000.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$23,980.000
|
$330,000.000
|
$325,000.000
|
|
|
ANCHOR BOLTS
|
EA
|
10.000
|
$1,400.000
|
$910.000
|
$7,500.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
360.000
|
$180.000
|
$610.000
|
$1,500.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
54.000
|
$475.000
|
$280.000
|
$350.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$104,000.000
|
$130,000.000
|
$380,000.000
|
|
|
REMOVE STR (PILING)
|
EA
|
5.000
|
$300.000
|
$1,150.000
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$439,274.040
|
$402,000.000
|
$650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$15,000.000
|
$19,400.000
|
$27,500.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
100.000
|
$90.620
|
$13.750
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
750.000
|
$1.730
|
$2.300
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
100.000
|
$10.290
|
$13.750
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$2.890
|
$2.300
|
$3.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
750.000
|
$11.870
|
$8.000
|
$15.000
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
3.000
|
$100.000
|
$920.000
|
$2,500.000
|
|
|
JT / CRCK SEAL (HOT - POURED RUBBER)
|
LF
|
40.000
|
$90.000
|
$230.000
|
$100.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
6.000
|
$71.860
|
$300.000
|
$500.000
|
|
|
REALIGN POSTS
|
EA
|
1.000
|
$45.200
|
$1,200.000
|
$200.000
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
1.000
|
$10.000
|
$120.000
|
$200.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
1.000
|
$46.000
|
$300.000
|
$250.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
212.000
|
$100.000
|
$95.000
|
$450.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
202.000
|
$105.790
|
$130.000
|
$195.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
15.000
|
$612.120
|
$1,560.000
|
$800.000
|
|
|
BRIDGE JOINT REPAIR (SEJ)
|
LF
|
110.000
|
$500.000
|
$1,152.000
|
$900.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
30.000
|
$159.620
|
$415.000
|
$200.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
4.000
|
$20,000.000
|
$12,000.000
|
$65,000.000
|
|
|
FILTER FABRIC (TY 2)
|
SY
|
2,089.000
|
$15.000
|
$17.200
|
$15.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
20.000
|
$7,750.000
|
$9,150.000
|
$16,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
260.000
|
$138.910
|
$130.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$333.840
|
$525.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
100.000
|
$419.690
|
$400.000
|
$1.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
427.000
|
$750.000
|
$165.000
|
$250.000
|
|
|
CLEANING SUBSTRUCTURE (ABUT)
|
EA
|
5.000
|
$1,500.000
|
$3,300.000
|
$2,500.000
|
|
Totals: |
$3,546,517.660
|
$4,437,824.800
|
$6,695,165.000
|