TRAVIS VARIOUS (0914-00-581)

Items: 32

County: TRAVIS
Length: 0.0000 MILES
Highway: VARIOUS
District: AUSTIN
Control Number: 0914-00-581
DBE Goal: 0.0%
Project: CC 914-00-581
Guaranty: $6,000.00
Time: 24 WORKING DAYS
Engineer's Estimate: $316,715.00
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263242
Type: INFRASTRUCTURE IMPROVEMENTS
Project ID: A00218356
Project Description: ADD LARGE GUIDE SIGNS, SMALL GUIDE SIGNS AND DMS ALONG SH 130 BETWEEN IH 35 AND CALDWELL/GUADALUPE COUNTY LINE.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (4)
E
Engineer's Estimate
$316,715.00
$307,519.92
Over/Under Est: -2.9% -$9,195.08
Over/Under Est: 17.46% $55,313.00
Amt Left: 20.98% $64,508.08
Over/Under Est: 28.73% $90,989.00
Amt Left: 32.58% $100,184.08
Delta: -9.59% -$35,676.00
Over/Under Est: 29.42% $93,173.50
Amt Left: 33.29% $102,368.58
Delta: -0.54% -$2,184.50

Bid Items & Bid Tabulations

32 Total 0 of 32
TRAVIS  |  VARIOUS  |  AUSTIN  |  0914-00-581  |  08/06/2026 1:00 PM CDT  |  $316,715.00  |  CC 914-00-581  |  INFRASTRUCT IMPRVS  |  24 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, LLC
ELECNOR BELCO ELECTRIC, INC.
FLORIDA TRAFFIC CONTROL DEVICES, INC.
E-Z BEL CONSTRUCTION, LLC
DRILL SHAFT (48 IN)
LF 19.000 $470.000 $666.110 $502.000 $1,225.000 $1,150.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 40.000 $200.000 $288.610 $348.000 $500.000 $540.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $555.000 $993.230 $946.000 $830.000 $800.000
MOBILIZATION
LS 1.000 $32,000.000 $30,751.990 $47,000.000 $40,400.000 $36,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $10,000.000 $5,478.540 $5,257.000 $7,125.000 $4,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $1,458.000 $2,432.000 $168.000 $7,700.000
TMA (STATIONARY)
DAY 16.000 $190.000 $62.150 $263.000 $81.000 $550.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 300.000 $7.250 $5.920 $30.000 $23.000 $3.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $1.250 $2.310 $5.400 $2.750 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $25.000 $25.980 $36.000 $29.500 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,360.000 $1,378.650 $1,832.000 $1,595.000 $1,550.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,150.000 $3,960.490 $4,699.000 $4,560.000 $3,975.000
CONDT (PVC) (SCH 40) (2")
LF 375.000 $10.000 $17.050 $17.200 $13.000 $35.500
CONDT (PVC) (SCH 40) (2") (BORE)
LF 320.000 $35.000 $33.410 $30.000 $22.000 $38.000
ELEC CONDR (NO.8) BARE
LF 750.000 $1.750 $1.960 $2.000 $1.700 $2.000
ELEC CONDR (NO.8) INSULATED
LF 2,250.000 $1.900 $2.160 $2.000 $2.140 $3.000
GROUND BOX TY A (122311)W/APRON
EA 8.000 $1,360.000 $1,425.230 $1,595.000 $1,505.000 $1,500.000
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
EA 2.000 $7,300.000 $8,092.530 $9,498.000 $9,440.000 $10,500.000
ELC SRV TY D 120/240 100(NS)SS(N)SF(U)
EA 1.000 $12,000.000 $11,365.930 $9,438.000 $6,386.000 $11,000.000
ALUMINUM SIGNS (TY G)
SF 432.000 $35.000 $35.050 $37.000 $32.500 $48.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 8.000 $785.000 $750.000 $1,506.000 $1,455.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $1,110.000 $950.000 $1,932.000 $1,865.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 14.000 $1,170.000 $1,050.000 $2,310.000 $2,230.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,185.000 $1,250.000 $2,659.000 $2,565.000 $1,250.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $1,150.000 $1,375.000 $2,217.000 $2,140.000 $1,375.000
REMOVE SM RD SN SUP&AM
EA 16.000 $120.000 $100.000 $154.000 $150.000 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 1,770.000 $7.750 $6.790 $7.200 $14.000 $9.500
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $52,250.000 $44,433.200 $42,888.000 $68,550.000 $60,000.000
SUBSURFACE UTIL LOCATE (NON-PAVED AREA)
EA 3.000 $750.000 $967.610 $887.000 $960.000 $1,500.000
INSTALL DMS (POLE MTD CABINET)
EA 1.000 $10,000.000 $9,939.930 $12,512.000 $15,615.000 $90.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 2.000 $5,280.000 $9,481.040 $6,881.000 $9,128.000 $9,000.000
INSTALLATION OF CELLULAR MODEM
EA 3.000 $1,775.000 $830.500 $500.000 $565.000 $11,400.000
Totals: $316,715.000 $307,519.920 $372,028.000 $407,704.000 $409,888.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $2,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $5,000.00
STATE FORCE ACCOUNT WORK (PART) $200,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $25,000.00
Total: $242,000.00