PREPARING ROW
|
AC
|
0.240
|
$6,400.000
|
$15,000.000
|
$30,000.000
|
$50,000.000
|
$20,000.000
|
$15,900.000
|
$50,000.000
|
|
|
PREPARING ROW
|
STA
|
4.000
|
$3,100.000
|
$3,000.000
|
$6,000.000
|
$15,000.000
|
$20,000.000
|
$23,900.000
|
$25,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
80.000
|
$13.460
|
$15.000
|
$25.000
|
$15.000
|
$34.800
|
$23.100
|
$30.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
12.000
|
$20.000
|
$20.000
|
$200.000
|
$35.000
|
$143.780
|
$54.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
513.000
|
$3.750
|
$4.000
|
$15.000
|
$5.000
|
$5.390
|
$4.100
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
300.000
|
$6.690
|
$10.000
|
$40.000
|
$25.000
|
$35.840
|
$19.600
|
$12.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,381.000
|
$10.660
|
$12.000
|
$25.000
|
$15.000
|
$22.650
|
$15.600
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
200.000
|
$6.750
|
$10.000
|
$40.000
|
$25.000
|
$38.620
|
$19.800
|
$23.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
268.000
|
$0.730
|
$6.000
|
$6.000
|
$2.500
|
$19.560
|
$11.200
|
$12.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
268.000
|
$0.100
|
$1.870
|
$2.000
|
$1.700
|
$1.680
|
$1.420
|
$2.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
1,454.000
|
$0.320
|
$0.350
|
$1.000
|
$0.600
|
$0.550
|
$0.980
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
8.000
|
$14.930
|
$55.000
|
$500.000
|
$15.000
|
$81.440
|
$252.000
|
$45.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
268.000
|
$0.900
|
$1.500
|
$2.000
|
$1.500
|
$1.500
|
$1.320
|
$1.600
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
1,186.000
|
$3.600
|
$6.000
|
$2.000
|
$1.500
|
$1.350
|
$2.160
|
$1.400
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
422.000
|
$80.000
|
$125.000
|
$100.000
|
$110.000
|
$105.000
|
$114.000
|
$113.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
53.000
|
$109.720
|
$235.000
|
$190.000
|
$420.000
|
$190.000
|
$157.000
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
100.000
|
$116.350
|
$135.000
|
$160.000
|
$150.000
|
$160.000
|
$247.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
360.000
|
$3.500
|
$5.000
|
$5.000
|
$1.000
|
$5.000
|
$4.850
|
$40.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
241.000
|
$152.150
|
$210.000
|
$250.000
|
$225.000
|
$220.000
|
$251.000
|
$300.000
|
|
|
CL C CONC (ABUT)
|
CY
|
43.600
|
$848.950
|
$800.000
|
$850.000
|
$900.000
|
$900.000
|
$1,230.000
|
$1,000.000
|
|
|
CL C CONC (BENT)
|
CY
|
30.800
|
$850.000
|
$900.000
|
$1,100.000
|
$1,150.000
|
$1,700.000
|
$1,380.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
10.210
|
$858.300
|
$1,100.000
|
$1,600.000
|
$1,150.000
|
$1,000.000
|
$1,220.000
|
$1,400.000
|
|
|
REINF CONC SLAB
|
SF
|
6,120.000
|
$18.000
|
$19.000
|
$20.000
|
$20.000
|
$18.000
|
$19.300
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
67.000
|
$450.000
|
$400.000
|
$430.000
|
$500.000
|
$550.000
|
$674.000
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
720.000
|
$129.000
|
$175.000
|
$156.000
|
$165.000
|
$140.000
|
$153.000
|
$182.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.650
|
$414.860
|
$1,200.000
|
$1,750.000
|
$1,200.000
|
$850.000
|
$743.000
|
$750.000
|
|
|
RIPRAP (STONE PROTECTION)(21 IN)
|
CY
|
281.000
|
$120.000
|
$135.000
|
$125.000
|
$130.000
|
$160.000
|
$163.000
|
$165.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
14.050
|
$440.490
|
$400.000
|
$475.000
|
$450.000
|
$700.000
|
$640.000
|
$530.000
|
|
|
RAIL (TY T223)
|
LF
|
404.000
|
$95.500
|
$110.000
|
$115.000
|
$110.000
|
$90.000
|
$142.000
|
$118.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
70.000
|
$85.000
|
$80.000
|
$95.000
|
$95.000
|
$100.000
|
$138.000
|
$125.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
83.000
|
$85.240
|
$65.000
|
$75.000
|
$55.000
|
$70.000
|
$109.000
|
$100.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (P)
|
EA
|
2.000
|
$1,125.000
|
$1,800.000
|
$1,800.000
|
$800.000
|
$1,300.000
|
$1,690.000
|
$2,700.000
|
|
|
REMOV STR (PIPE)
|
LF
|
53.000
|
$21.950
|
$21.000
|
$50.000
|
$16.000
|
$30.000
|
$22.200
|
$35.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$25,000.000
|
$15,000.000
|
$29,323.000
|
$15,000.000
|
$34,000.000
|
$27,200.000
|
$30,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$68,520.090
|
$100,000.000
|
$90,000.000
|
$100,000.000
|
$120,000.000
|
$140,000.000
|
$120,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$1,000.000
|
$4,000.000
|
$1,500.000
|
$6,500.000
|
$1,000.000
|
$1,350.000
|
$600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$27.780
|
$25.000
|
$25.000
|
$28.000
|
$27.500
|
$56.000
|
$29.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
155.000
|
$45.000
|
$45.000
|
$45.000
|
$55.000
|
$55.000
|
$63.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
235.000
|
$9.640
|
$13.000
|
$5.000
|
$15.000
|
$15.000
|
$16.100
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,055.000
|
$17.850
|
$15.000
|
$20.000
|
$12.000
|
$12.000
|
$10.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,055.000
|
$7.870
|
$10.000
|
$5.000
|
$10.000
|
$10.000
|
$3.640
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
805.000
|
$2.400
|
$4.000
|
$4.000
|
$2.150
|
$2.150
|
$4.480
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
805.000
|
$0.630
|
$0.750
|
$0.500
|
$0.500
|
$0.150
|
$1.070
|
$0.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
176.000
|
$16.800
|
$5.000
|
$5.000
|
$4.500
|
$4.500
|
$5.900
|
$4.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
176.000
|
$1.350
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$1.260
|
$0.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
56.000
|
$70.000
|
$60.000
|
$96.000
|
$95.000
|
$150.000
|
$110.000
|
$130.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$20.630
|
$20.000
|
$21.000
|
$18.500
|
$18.000
|
$21.600
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,320.740
|
$900.000
|
$950.000
|
$875.000
|
$850.000
|
$1,020.000
|
$1,000.000
|
|
|
SHORT RADIUS
|
LF
|
70.000
|
$36.550
|
$25.000
|
$25.000
|
$26.500
|
$26.000
|
$31.200
|
$28.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,146.110
|
$925.000
|
$975.000
|
$1,000.000
|
$950.000
|
$1,140.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,667.300
|
$2,630.000
|
$2,775.000
|
$2,500.000
|
$2,390.000
|
$2,870.000
|
$2,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$539.020
|
$555.000
|
$580.000
|
$600.000
|
$450.000
|
$509.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$81.700
|
$125.000
|
$130.000
|
$125.000
|
$50.000
|
$78.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$21.960
|
$13.000
|
$15.000
|
$20.000
|
$10.000
|
$24.000
|
$14.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
3.000
|
$15.000
|
$16.250
|
$17.000
|
$22.000
|
$10.000
|
$26.400
|
$17.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
918.000
|
$0.330
|
$1.500
|
$3.000
|
$1.750
|
$3.000
|
$3.600
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,000.000
|
$0.340
|
$1.500
|
$3.000
|
$1.750
|
$3.000
|
$3.600
|
$3.000
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
918.000
|
$0.110
|
$1.200
|
$1.000
|
$1.250
|
$0.500
|
$2.580
|
$0.500
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
1,000.000
|
$0.120
|
$1.200
|
$1.000
|
$1.250
|
$0.500
|
$2.580
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
26.000
|
$2.880
|
$50.000
|
$10.000
|
$55.000
|
$10.000
|
$24.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
22.000
|
$0.440
|
$50.000
|
$10.000
|
$55.000
|
$10.000
|
$18.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$17,000.000
|
$2,800.000
|
$7,000.000
|
$8,724.450
|
$20,400.000
|
$8,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$5,000.000
|
$5,000.000
|
$750.000
|
$1.000
|
$30,000.000
|
$706.000
|
$3,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
164.000
|
$150.000
|
$150.000
|
$1.000
|
$1.000
|
$100.000
|
$1.000
|
$75.000
|
|
|
JACK BORE ASTM A134 STEEL MIN THICK 3/8
|
LF
|
110.000
|
$600.000
|
$525.000
|
$600.000
|
$750.000
|
$600.000
|
$312.000
|
$720.000
|
|
|
PIPE, 2" DIA. HDPE (ALL DEPTHS)
|
LF
|
6.000
|
$40.000
|
$50.000
|
$65.000
|
$150.000
|
$200.000
|
$181.000
|
$390.000
|
|
|
PIPE, 6" DIA. DI CLASS 350 (ALL DEPTHS)
|
LF
|
14.000
|
$85.000
|
$70.000
|
$100.000
|
$250.000
|
$150.000
|
$202.000
|
$200.000
|
|
|
FCT RESTR JT PIPE,12"DIA. CL 350 DI
|
LF
|
360.000
|
$165.000
|
$155.000
|
$150.000
|
$125.000
|
$150.000
|
$149.000
|
$280.000
|
|
|
WET CONNECTIONS, 12" DIA. X 12" DIA.
|
EA
|
2.000
|
$5,000.000
|
$8,500.000
|
$2,500.000
|
$3,500.000
|
$6,300.000
|
$8,060.000
|
$3,000.000
|
|
|
DUCTILE IRON FITTINGS 4" THROUGH 12"
|
TON
|
0.350
|
$7,450.000
|
$9,000.000
|
$20,000.000
|
$10,000.000
|
$7,000.000
|
$18,100.000
|
$32,000.000
|
|
|
VALVES, GATE VALVE TYPE, 6" DIA.
|
EA
|
1.000
|
$1,650.000
|
$2,500.000
|
$1,150.000
|
$1,200.000
|
$2,500.000
|
$1,400.000
|
$1,500.000
|
|
|
VALVES, GATE VALVE TYPE, 12" DIA.
|
EA
|
1.000
|
$2,700.000
|
$3,500.000
|
$2,500.000
|
$3,500.000
|
$3,500.000
|
$15,100.000
|
$4,300.000
|
|
|
FIRE HYDRANTS
|
EA
|
1.000
|
$4,800.000
|
$6,500.000
|
$3,500.000
|
$5,500.000
|
$5,000.000
|
$8,900.000
|
$5,200.000
|
|
|
AUTO COMBO AIR AND VAC RELEASE VALVE 2"
|
EA
|
1.000
|
$4,000.000
|
$2,500.000
|
$3,500.000
|
$3,500.000
|
$4,500.000
|
$1,260.000
|
$3,300.000
|
|
|
ADDITIONAL BURY DEPTH(2" ARV AND 6" FH)
|
LF
|
18.000
|
$800.000
|
$120.000
|
$150.000
|
$150.000
|
$120.000
|
$204.000
|
$210.000
|
|
Totals: |
$935,814.346
|
$1,078,645.160
|
$1,084,884.750
|
$1,133,450.250
|
$1,243,247.620
|
$1,265,975.300
|
$1,418,967.600
|