|
|
PREPARING ROW
|
STA
|
66.000
|
$2,000.000
|
$250.000
|
$500.000
|
$3,800.000
|
$1,130.000
|
$3,000.000
|
$7,500.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
6,750.000
|
$7.000
|
$7.000
|
$11.000
|
$10.000
|
$17.000
|
$10.260
|
$3.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
100.000
|
$25.000
|
$30.000
|
$38.000
|
$30.000
|
$25.000
|
$27.360
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,466.000
|
$15.000
|
$19.000
|
$16.000
|
$33.000
|
$32.000
|
$17.100
|
$34.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,236.000
|
$20.000
|
$16.000
|
$18.000
|
$25.000
|
$15.000
|
$17.100
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
20,534.000
|
$2.000
|
$0.700
|
$3.400
|
$3.450
|
$2.250
|
$2.020
|
$1.500
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
20,534.000
|
$0.500
|
$0.300
|
$0.300
|
$0.260
|
$0.290
|
$0.270
|
$0.260
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
20,534.000
|
$0.500
|
$0.300
|
$0.250
|
$0.240
|
$0.270
|
$0.250
|
$0.240
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
20,534.000
|
$0.500
|
$0.300
|
$0.250
|
$0.240
|
$0.270
|
$0.250
|
$0.240
|
|
|
VEGETATIVE WATERING
|
MG
|
347.000
|
$20.000
|
$30.000
|
$41.000
|
$32.000
|
$61.000
|
$20.520
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
20,534.000
|
$1.500
|
$1.450
|
$1.030
|
$1.350
|
$1.440
|
$1.340
|
$1.300
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
20,534.000
|
$2.250
|
$1.450
|
$1.140
|
$1.350
|
$1.440
|
$1.340
|
$1.300
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
11,081.000
|
$55.000
|
$80.000
|
$55.000
|
$56.000
|
$76.500
|
$84.100
|
$90.000
|
|
|
FL BS (RDWY DEL)(TY A GR 5)
|
TON
|
550.000
|
$20.000
|
$40.000
|
$24.000
|
$25.000
|
$160.000
|
$55.800
|
$35.000
|
|
|
REWORK BS MATL (TY B)(10")(OC)
|
SY
|
33,241.000
|
$2.570
|
$18.000
|
$21.000
|
$8.500
|
$7.000
|
$14.450
|
$12.500
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
6,648.000
|
$6.000
|
$4.200
|
$4.250
|
$4.000
|
$4.660
|
$5.490
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,587.000
|
$55.000
|
$63.000
|
$64.000
|
$61.000
|
$69.950
|
$65.750
|
$65.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
25,829.000
|
$2.000
|
$1.850
|
$1.850
|
$2.500
|
$2.040
|
$2.340
|
$2.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,425.000
|
$160.000
|
$215.000
|
$238.000
|
$181.000
|
$197.000
|
$324.530
|
$200.000
|
|
|
CL A CONC (MISC)
|
CY
|
12.000
|
$625.000
|
$270.000
|
$1,010.000
|
$750.000
|
$684.000
|
$800.000
|
$850.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
12.000
|
$280.000
|
$430.000
|
$420.000
|
$650.000
|
$316.000
|
$900.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
90.000
|
$550.000
|
$640.000
|
$1,020.000
|
$650.000
|
$641.000
|
$627.250
|
$600.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
270.000
|
$45.000
|
$43.000
|
$42.150
|
$45.000
|
$50.000
|
$47.400
|
$30.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
11.000
|
$1,200.000
|
$2,240.000
|
$3,000.000
|
$0.010
|
$1,646.000
|
$3,302.550
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$430,000.000
|
$250,000.000
|
$400,000.000
|
$600,000.000
|
$110,000.000
|
$673,475.430
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$960.000
|
$13,700.000
|
$12,000.000
|
$9,043.000
|
$7,500.000
|
$35,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
150.000
|
$32.000
|
$38.000
|
$37.800
|
$36.000
|
$38.680
|
$36.050
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$13.720
|
$27.000
|
$10.530
|
$26.000
|
$27.620
|
$25.750
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,400.000
|
$3.500
|
$4.000
|
$3.800
|
$4.000
|
$3.870
|
$3.600
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,400.000
|
$0.700
|
$1.000
|
$0.800
|
$1.000
|
$3.870
|
$0.770
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
800.000
|
$5.000
|
$4.000
|
$3.800
|
$4.000
|
$3.870
|
$3.600
|
$3.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
800.000
|
$3.000
|
$1.000
|
$0.800
|
$1.000
|
$0.830
|
$0.770
|
$0.750
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,000.000
|
$45.000
|
$14.000
|
$18.500
|
$40.000
|
$60.000
|
$50.000
|
$40.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
12,260.000
|
$8.000
|
$7.000
|
$3.950
|
$13.000
|
$8.000
|
$5.000
|
$3.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,000.000
|
$12.000
|
$15.000
|
$18.500
|
$11.500
|
$12.000
|
$25.000
|
$6.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,750.000
|
$25.000
|
$22.000
|
$23.350
|
$24.000
|
$22.000
|
$27.400
|
$35.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
956.000
|
$40.000
|
$96.000
|
$90.200
|
$100.000
|
$90.360
|
$124.200
|
$85.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,450.000
|
$30.000
|
$27.000
|
$26.300
|
$23.000
|
$26.900
|
$25.080
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,400.000
|
$2,000.000
|
$2,000.000
|
$1,900.000
|
$2,044.280
|
$2,420.500
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,400.000
|
$1,500.000
|
$1,440.000
|
$1,500.000
|
$1,475.200
|
$1,375.050
|
$1,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,450.000
|
$2.000
|
$2.200
|
$2.150
|
$4.500
|
$2.210
|
$2.060
|
$2.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$240.000
|
$166.000
|
$162.000
|
$190.000
|
$165.710
|
$154.500
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,400.000
|
$3,500.000
|
$3,390.000
|
$3,700.000
|
$3,463.320
|
$3,229.050
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$220.000
|
$216.000
|
$285.000
|
$221.000
|
$206.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,400.000
|
$1,660.000
|
$1,620.000
|
$1,400.000
|
$1,657.090
|
$1,545.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$950.000
|
$720.000
|
$700.000
|
$1,050.000
|
$718.070
|
$669.500
|
$700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$9,500.000
|
$8,400.000
|
$8,200.000
|
$8,200.000
|
$8,340.000
|
$7,776.500
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$750.000
|
$750.000
|
$730.000
|
$725.000
|
$746.800
|
$696.280
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$750.000
|
$870.000
|
$850.000
|
$840.000
|
$867.210
|
$808.550
|
$785.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
16.000
|
$80.000
|
$61.000
|
$59.400
|
$60.000
|
$60.760
|
$56.650
|
$55.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
12.000
|
$32.000
|
$22.000
|
$21.600
|
$22.000
|
$22.090
|
$20.600
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
24.000
|
$35.000
|
$40.000
|
$38.900
|
$39.000
|
$39.770
|
$37.080
|
$36.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
16.000
|
$35.000
|
$18.000
|
$17.300
|
$17.000
|
$17.680
|
$16.480
|
$16.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
16.000
|
$35.000
|
$18.000
|
$17.300
|
$17.000
|
$17.680
|
$16.480
|
$16.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
16,000.000
|
$0.280
|
$0.300
|
$0.200
|
$0.210
|
$0.220
|
$0.200
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
26,400.000
|
$0.230
|
$0.250
|
$0.200
|
$0.210
|
$0.220
|
$0.200
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
500.000
|
$1.010
|
$0.700
|
$3.450
|
$3.450
|
$3.540
|
$3.200
|
$3.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
412.000
|
$4.330
|
$1.400
|
$6.500
|
$6.450
|
$6.630
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
12.000
|
$80.000
|
$85.000
|
$124.000
|
$123.000
|
$127.040
|
$115.000
|
$115.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
|
EA
|
296.000
|
$15.000
|
$8.000
|
$21.600
|
$22.000
|
$22.090
|
$20.000
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
52,800.000
|
$0.230
|
$0.250
|
$0.220
|
$0.210
|
$0.220
|
$0.200
|
$0.200
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,110.000
|
$5.440
|
$4.800
|
$3.500
|
$3.500
|
$3.590
|
$3.250
|
$3.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,320.000
|
$4.460
|
$4.800
|
$3.500
|
$3.500
|
$3.590
|
$3.250
|
$3.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,600.000
|
$0.820
|
$0.800
|
$0.650
|
$0.670
|
$0.670
|
$0.610
|
$0.620
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
500.000
|
$2.260
|
$1.600
|
$1.250
|
$1.250
|
$1.270
|
$1.150
|
$1.150
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
8,990.000
|
$2.000
|
$1.500
|
$1.250
|
$1.250
|
$1.270
|
$1.150
|
$1.150
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
36.000
|
$175.000
|
$188.000
|
$180.000
|
$180.000
|
$184.490
|
$167.000
|
$170.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
24.000
|
$175.000
|
$215.000
|
$216.000
|
$215.000
|
$220.950
|
$200.000
|
$200.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,160.000
|
$1.160
|
$0.900
|
$1.200
|
$1.350
|
$1.660
|
$1.660
|
$2.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,300.000
|
$1.000
|
$0.900
|
$1.200
|
$1.350
|
$1.660
|
$1.660
|
$2.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,810.000
|
$1.100
|
$1.350
|
$0.850
|
$0.820
|
$0.850
|
$0.770
|
$0.770
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
316.000
|
$7.000
|
$7.500
|
$7.550
|
$7.500
|
$7.730
|
$7.000
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
22.000
|
$170.000
|
$215.000
|
$180.000
|
$180.000
|
$184.490
|
$167.000
|
$170.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
19.000
|
$200.000
|
$240.000
|
$190.000
|
$190.000
|
$194.430
|
$176.000
|
$180.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
48.000
|
$35.000
|
$56.000
|
$27.000
|
$27.000
|
$27.620
|
$25.000
|
$25.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,275.000
|
$4.000
|
$4.300
|
$3.650
|
$3.600
|
$3.760
|
$3.400
|
$3.400
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
3,195.000
|
$0.170
|
$0.150
|
$0.150
|
$0.150
|
$0.130
|
$0.140
|
$0.150
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
12,296.000
|
$0.140
|
$0.150
|
$0.150
|
$0.150
|
$0.130
|
$0.120
|
$0.120
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
4,810.000
|
$0.700
|
$0.300
|
$0.300
|
$0.320
|
$0.330
|
$0.300
|
$0.300
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
316.000
|
$4.000
|
$0.850
|
$3.250
|
$3.220
|
$3.310
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
22.000
|
$80.000
|
$92.000
|
$83.200
|
$83.000
|
$85.060
|
$77.000
|
$80.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
19.000
|
$110.000
|
$114.000
|
$83.200
|
$83.000
|
$85.060
|
$77.000
|
$80.000
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
96.000
|
$20.000
|
$21.000
|
$15.100
|
$16.000
|
$15.470
|
$14.000
|
$15.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
12,580.000
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.130
|
$0.120
|
$0.120
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
1,275.000
|
$1.200
|
$0.550
|
$1.800
|
$2.000
|
$1.840
|
$1.670
|
$1.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,195.000
|
$0.400
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
$0.450
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,296.000
|
$0.540
|
$0.500
|
$0.450
|
$0.500
|
$0.460
|
$0.420
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,580.000
|
$0.490
|
$0.500
|
$0.450
|
$0.500
|
$0.460
|
$0.420
|
$0.450
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
445.000
|
$4.500
|
$4.800
|
$4.850
|
$4.850
|
$4.970
|
$4.500
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,280.000
|
$0.400
|
$0.500
|
$0.650
|
$0.700
|
$0.670
|
$0.610
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
600.000
|
$0.910
|
$1.000
|
$0.650
|
$0.700
|
$0.670
|
$0.610
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
600.000
|
$2.500
|
$1.500
|
$1.100
|
$1.500
|
$1.100
|
$1.000
|
$1.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,000.000
|
$1,900.000
|
$2,780.000
|
$1,300.000
|
$5,083.000
|
$3,500.000
|
$1,550.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$1,000.000
|
$4,000.000
|
$3,470.000
|
$1,000.000
|
$2,431.000
|
$3,000.000
|
$600.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
3.000
|
$1,200.000
|
$130.000
|
$500.000
|
$1,700.000
|
$2,763.000
|
$5,400.000
|
$1,500.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
9,145.000
|
$110.000
|
$98.000
|
$99.500
|
$100.000
|
$109.000
|
$111.600
|
$105.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
2,025.000
|
$130.000
|
$142.000
|
$143.000
|
$142.000
|
$157.000
|
$121.320
|
$145.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
3,523.000
|
$135.000
|
$158.000
|
$159.000
|
$158.000
|
$174.000
|
$150.480
|
$155.000
|
|
|
BONDING COURSE
|
GAL
|
8,600.000
|
$5.000
|
$4.000
|
$4.200
|
$4.000
|
$4.610
|
$4.550
|
$4.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
33,241.000
|
$1.500
|
$1.550
|
$1.750
|
$1.750
|
$4.950
|
$1.550
|
$2.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$12,000.000
|
$8,500.000
|
$11,300.000
|
$9,500.000
|
$12,707.000
|
$10,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
260.000
|
$200.000
|
$279.000
|
$1.300
|
$0.010
|
$829.000
|
$300.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
125.000
|
$100.000
|
$100.000
|
$91.100
|
$95.000
|
$74.000
|
$100.000
|
$65.000
|
|
Totals: |
$5,259,191.660
|
$5,597,210.350
|
$5,774,367.530
|
$6,073,033.940
|
$6,289,258.830
|
$6,843,560.020
|
$7,107,969.080
|