|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
7,716.000
|
$1.550
|
$4.750
|
$9.988
|
$7.000
|
|
|
BLOCK SODDING
|
SY
|
1,404.000
|
$3.630
|
$12.000
|
$24.970
|
$11.000
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
6,312.000
|
$0.310
|
$0.450
|
$3.559
|
$4.000
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
6,312.000
|
$0.190
|
$0.400
|
$0.750
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
237.200
|
$6.140
|
$34.000
|
$367.584
|
$65.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
300.000
|
$471.380
|
$500.000
|
$787.796
|
$600.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
87.000
|
$695.600
|
$610.000
|
$949.324
|
$800.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
18.750
|
$430.530
|
$860.000
|
$1,221.280
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$620,666.180
|
$492,523.600
|
$553,955.569
|
$680,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$26,352.190
|
$19,400.000
|
$10,456.183
|
$24,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
36,413.000
|
$6.230
|
$3.550
|
$3.871
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
36,413.000
|
$2.320
|
$1.200
|
$1.124
|
$1.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
42.000
|
$181.030
|
$260.000
|
$465.067
|
$200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,843.000
|
$27.320
|
$29.000
|
$30.464
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,092.190
|
$2,320.000
|
$2,444.562
|
$2,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
8.000
|
$1,322.810
|
$2,000.000
|
$2,072.510
|
$1,900.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,611.780
|
$3,510.000
|
$3,690.565
|
$4,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$254.310
|
$420.000
|
$436.975
|
$531.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,638.000
|
$27.730
|
$9.750
|
$14.819
|
$30.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,085.000
|
$20.030
|
$25.000
|
$31.314
|
$35.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
32,577.000
|
$16.940
|
$14.000
|
$20.802
|
$25.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
9,350.000
|
$46.220
|
$22.000
|
$29.913
|
$43.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
44,931.000
|
$1.140
|
$1.000
|
$0.502
|
$1.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
700.000
|
$1.370
|
$1.200
|
$1.428
|
$1.950
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,419.000
|
$1.650
|
$1.200
|
$1.291
|
$2.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
222.000
|
$1.640
|
$1.550
|
$1.870
|
$2.200
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
444.000
|
$2.020
|
$1.550
|
$1.519
|
$84.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,242.000
|
$2.630
|
$1.950
|
$1.855
|
$2.900
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
3,502.000
|
$2.920
|
$2.400
|
$2.159
|
$3.300
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
1,224.000
|
$3.920
|
$3.450
|
$2.464
|
$4.850
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
2,448.000
|
$4.450
|
$3.100
|
$3.313
|
$4.600
|
|
|
ELEC CONDR (NO.1/0) BARE
|
LF
|
848.000
|
$5.620
|
$4.450
|
$4.212
|
$5.900
|
|
|
ELEC CONDR (NO.1/0) INSULATED
|
LF
|
1,696.000
|
$6.170
|
$5.000
|
$4.565
|
$6.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
17.000
|
$2,328.070
|
$1,500.000
|
$1,801.140
|
$2,800.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
17.000
|
$5,822.200
|
$6,000.000
|
$6,923.301
|
$4,800.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
3.000
|
$51,307.080
|
$50,500.000
|
$61,418.631
|
$43,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
65.000
|
$52.890
|
$38.000
|
$39.952
|
$40.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$4,500.000
|
$7,590.469
|
$1,900.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
116,325.000
|
$1.860
|
$2.210
|
$1.634
|
$2.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
1,428.000
|
$3.260
|
$4.300
|
$5.668
|
$3.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
52,478.000
|
$5.550
|
$4.300
|
$3.224
|
$5.000
|
|
|
FIBER OPTIC PATCH PANEL (6 POSITION)
|
EA
|
42.000
|
$2,200.000
|
$750.000
|
$530.613
|
$2,900.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
8.000
|
$3,080.100
|
$840.000
|
$749.100
|
$3,800.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
2.000
|
$4,289.690
|
$1,900.000
|
$4,335.327
|
$11,000.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
5.000
|
$2,699.470
|
$1,200.000
|
$967.588
|
$2,000.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
372.000
|
$69.280
|
$30.000
|
$33.992
|
$115.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
4.000
|
$16,852.340
|
$15,800.000
|
$15,634.368
|
$12,000.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
15.000
|
$9,500.530
|
$7,900.000
|
$8,794.960
|
$7,000.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
32,760.000
|
$29.190
|
$21.000
|
$27.372
|
$34.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
9,024.000
|
$72.990
|
$32.000
|
$38.442
|
$42.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,263.000
|
$1.620
|
$4.700
|
$2.618
|
$4.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$471.040
|
$350.000
|
$1,061.225
|
$854.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
3.000
|
$15,562.200
|
$8,000.000
|
$14,305.934
|
$15,000.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
15.000
|
$29,918.140
|
$25,500.000
|
$27,801.511
|
$22,000.000
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
3.000
|
$5,770.000
|
$4,300.000
|
$4,262.820
|
$13,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
13.000
|
$10,711.120
|
$4,300.000
|
$4,312.760
|
$15,000.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
20.000
|
$82.010
|
$310.000
|
$141.519
|
$1,000.000
|
|
|
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
|
EA
|
15.000
|
$100.000
|
$280.000
|
$141.519
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
260.000
|
$160.000
|
$210.000
|
$424.932
|
$283.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
58.000
|
$5,877.190
|
$5,700.000
|
$8,070.410
|
$7,200.000
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
10.000
|
$1,300.000
|
$830.000
|
$2,871.555
|
$1,500.000
|
|
Totals: |
$6,609,086.086
|
$4,925,236.000
|
$5,983,308.727
|
$6,850,004.700
|