PREPARING ROW
|
STA
|
1.000
|
$1,500.000
|
$486.740
|
$500.000
|
$6,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
100.000
|
$11.000
|
$104.440
|
$60.000
|
$60.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
60.000
|
$1.500
|
$12.080
|
$20.000
|
$20.000
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
60.000
|
$0.210
|
$4.680
|
$10.000
|
$18.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
60.000
|
$3.080
|
$11.240
|
$20.000
|
$30.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
20.000
|
$93.080
|
$105.170
|
$150.000
|
$250.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
20.000
|
$170.000
|
$300.000
|
$275.000
|
$285.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
20.000
|
$232.050
|
$307.880
|
$300.000
|
$300.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
20.000
|
$332.430
|
$372.170
|
$325.000
|
$325.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
20.000
|
$424.000
|
$429.120
|
$400.000
|
$400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$473.270
|
$2,055.590
|
$1,000.000
|
$1,000.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
5.000
|
$670.000
|
$7,769.020
|
$7,500.000
|
$10,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
225.000
|
$3.000
|
$5.560
|
$2.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
225.000
|
$1.500
|
$2.060
|
$1.000
|
$2.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
500.000
|
$37.000
|
$28.300
|
$30.000
|
$35.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,800.000
|
$27.000
|
$25.000
|
$20.000
|
$34.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,500.000
|
$27.000
|
$26.150
|
$25.000
|
$36.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY A)
|
EA
|
1.000
|
$445.000
|
$688.030
|
$600.000
|
$560.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY G)
|
EA
|
1.000
|
$180.000
|
$1,828.060
|
$2,000.000
|
$600.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY O)
|
EA
|
1.000
|
$180.000
|
$1,892.090
|
$2,500.000
|
$500.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
100.000
|
$27.000
|
$33.320
|
$35.000
|
$36.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
1,000.000
|
$27.000
|
$25.000
|
$23.000
|
$28.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
2,000.000
|
$28.000
|
$32.500
|
$25.000
|
$26.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$894.050
|
$961.230
|
$1,000.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
1.000
|
$1,200.000
|
$1,366.050
|
$1,200.000
|
$996.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,900.000
|
$2,062.180
|
$1,600.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$100.000
|
$288.370
|
$100.000
|
$300.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,950.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$1,125.000
|
$3,348.760
|
$2,700.000
|
$3,000.000
|
|
|
REMOVE LRSA
|
EA
|
5.000
|
$800.000
|
$779.110
|
$800.000
|
$1,000.000
|
|
|
RELOCATE LRSS (SIGN ONLY)
|
EA
|
2.000
|
$500.000
|
$1,266.740
|
$800.000
|
$1,000.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(12 IN)
|
EA
|
2.000
|
$300.000
|
$214.220
|
$300.000
|
$300.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
|
EA
|
6.000
|
$200.000
|
$380.590
|
$500.000
|
$500.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(36 IN)
|
EA
|
2.000
|
$700.000
|
$755.870
|
$700.000
|
$700.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$22,000.000
|
$23,600.830
|
$25,000.000
|
$23,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$6,747.500
|
$3,781.900
|
$8,000.000
|
$9,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$138.000
|
$184.780
|
$500.000
|
$500.000
|
|
|
OVERHEAD SIGN SUPPORT REPAIR
|
EA
|
1.000
|
$30,000.000
|
$21,801.250
|
$15,000.000
|
$21,000.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 4)
|
EA
|
1.000
|
$699.400
|
$1,500.000
|
$3,000.000
|
$2,300.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 5)
|
EA
|
1.000
|
$907.000
|
$1,079.730
|
$4,000.000
|
$2,500.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 6)
|
EA
|
1.000
|
$852.000
|
$1,407.100
|
$5,000.000
|
$2,600.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 7)
|
EA
|
1.000
|
$1,550.000
|
$1,734.190
|
$6,000.000
|
$2,500.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 8)
|
EA
|
1.000
|
$2,750.000
|
$1,983.260
|
$6,500.000
|
$2,400.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 9)
|
EA
|
1.000
|
$608.000
|
$1,075.710
|
$3,500.000
|
$2,600.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 11)
|
EA
|
1.000
|
$3,300.000
|
$1,983.260
|
$13,000.000
|
$2,800.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 12)
|
EA
|
1.000
|
$509.000
|
$716.380
|
$1,500.000
|
$2,400.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 13)
|
EA
|
1.000
|
$1,235.000
|
$944.410
|
$2,500.000
|
$2,250.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 14)
|
EA
|
1.000
|
$975.000
|
$1,097.870
|
$2,000.000
|
$2,300.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 15)
|
EA
|
1.000
|
$1,550.000
|
$1,450.880
|
$3,000.000
|
$2,100.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 16)
|
EA
|
7.000
|
$332.000
|
$410.580
|
$1,500.000
|
$2,000.000
|
|
Totals: |
$329,960.130
|
$388,451.410
|
$393,925.000
|
$451,211.000
|