PREPARING ROW
|
STA
|
68.000
|
$1,500.000
|
$1,200.000
|
$1,220.000
|
$1,214.870
|
$1,400.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
274.000
|
$18.000
|
$35.000
|
$24.000
|
$23.100
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
68.450
|
$280.000
|
$800.000
|
$188.460
|
$108.300
|
$900.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
1,814.000
|
$15.000
|
$20.000
|
$14.000
|
$20.000
|
$18.500
|
|
|
BLADING
|
STA
|
68.450
|
$200.000
|
$120.000
|
$290.720
|
$244.520
|
$500.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
16.000
|
$85.000
|
$275.000
|
$171.000
|
$163.800
|
$300.000
|
|
|
BLOCK SODDING
|
SY
|
598.000
|
$5.500
|
$8.000
|
$7.700
|
$5.800
|
$7.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
10,382.000
|
$0.120
|
$0.500
|
$0.170
|
$0.150
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
10,382.000
|
$0.120
|
$0.500
|
$0.070
|
$0.130
|
$0.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
442.000
|
$0.350
|
$1.000
|
$2.750
|
$0.420
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
20,765.000
|
$0.600
|
$1.000
|
$1.030
|
$0.710
|
$1.100
|
|
|
VEGETATIVE WATERING
|
MG
|
851.380
|
$10.000
|
$6.000
|
$5.000
|
$0.010
|
$5.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
198.000
|
$2.000
|
$20.000
|
$10.000
|
$0.010
|
$5.000
|
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
|
SY
|
3,044.000
|
$30.000
|
$91.000
|
$60.130
|
$80.710
|
$145.000
|
|
|
ASPH (RC-250)
|
TON
|
3.000
|
$1,300.000
|
$1,500.000
|
$4,100.000
|
$3,231.810
|
$6,342.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
21.000
|
$140.000
|
$500.000
|
$632.000
|
$421.820
|
$500.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
180.000
|
$120.000
|
$150.000
|
$220.000
|
$168.100
|
$350.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
40.000
|
$950.000
|
$1,150.000
|
$1,225.000
|
$1,084.930
|
$3,000.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$220.000
|
$210.000
|
$1,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
50.000
|
$105.000
|
$125.000
|
$210.000
|
$199.500
|
$175.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
22.000
|
$600.000
|
$600.000
|
$775.000
|
$735.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
25.000
|
$700.000
|
$700.000
|
$895.000
|
$851.550
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
528.000
|
$60.000
|
$48.000
|
$62.000
|
$57.750
|
$58.250
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$80.000
|
$125.000
|
$90.000
|
$84.000
|
$94.500
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$6,000.000
|
$10,000.000
|
$10,750.000
|
$10,185.000
|
$19,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$18,900.000
|
$28,000.000
|
$26,000.000
|
$24,675.000
|
$44,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$700.000
|
$750.000
|
$775.000
|
$735.000
|
$750.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$800.000
|
$800.000
|
$810.000
|
$771.750
|
$885.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,100.000
|
$1,000.000
|
$1,400.000
|
$1,312.500
|
$885.000
|
|
|
REMOV STR (PIPE)
|
EA
|
18.000
|
$400.000
|
$500.000
|
$265.000
|
$241.500
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$60,000.000
|
$75,000.000
|
$158,000.000
|
$180,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,000.000
|
$4,000.000
|
$1,925.000
|
$1,060.000
|
$2,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
160.000
|
$32.000
|
$46.000
|
$43.500
|
$41.480
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$8.000
|
$15.000
|
$8.800
|
$8.400
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$15.000
|
$25.000
|
$32.500
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$8.000
|
$10.000
|
$8.800
|
$3.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,290.000
|
$2.800
|
$4.150
|
$3.550
|
$3.000
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,290.000
|
$1.000
|
$1.150
|
$0.830
|
$1.000
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
250.000
|
$120.000
|
$150.000
|
$127.000
|
$120.750
|
$130.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
550.000
|
$25.000
|
$45.200
|
$60.620
|
$60.000
|
$85.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
755.000
|
$40.000
|
$48.000
|
$61.380
|
$60.000
|
$60.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,246.000
|
$40.000
|
$33.000
|
$67.810
|
$60.000
|
$51.500
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
16.000
|
$210.000
|
$200.000
|
$297.000
|
$283.500
|
$300.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$210.000
|
$263.000
|
$297.000
|
$283.500
|
$400.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
1.000
|
$3,880.000
|
$7,625.000
|
$8,150.000
|
$7,770.000
|
$9,000.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
85.000
|
$15.000
|
$18.500
|
$20.000
|
$18.900
|
$23.250
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
85.000
|
$1.600
|
$3.150
|
$3.250
|
$3.150
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
170.000
|
$1.600
|
$3.150
|
$3.630
|
$3.470
|
$4.350
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$700.000
|
$545.000
|
$530.000
|
$556.500
|
$625.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,800.000
|
$8,750.000
|
$9,400.000
|
$8,925.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$830.000
|
$1,100.000
|
$1,020.000
|
$971.250
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$360.000
|
$825.000
|
$480.000
|
$456.750
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
3.000
|
$450.000
|
$990.000
|
$700.000
|
$672.000
|
$1,400.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
12.000
|
$100.000
|
$125.000
|
$115.000
|
$110.250
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
56.000
|
$0.750
|
$12.000
|
$10.000
|
$1.500
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
575.000
|
$1.000
|
$1.250
|
$1.500
|
$1.500
|
$5.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
13,691.000
|
$0.750
|
$1.750
|
$1.650
|
$1.580
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
2,683.000
|
$0.750
|
$1.750
|
$1.650
|
$1.580
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
13,691.000
|
$0.750
|
$1.750
|
$1.650
|
$1.580
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
51.000
|
$9.000
|
$16.000
|
$16.500
|
$15.750
|
$22.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
164.000
|
$3.000
|
$5.250
|
$5.500
|
$5.250
|
$6.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,683.000
|
$1.000
|
$0.300
|
$0.280
|
$0.260
|
$0.500
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
3,194.000
|
$130.000
|
$135.000
|
$163.050
|
$171.200
|
$180.000
|
|
|
TACK COAT
|
GAL
|
1,978.000
|
$5.000
|
$5.000
|
$5.000
|
$5.250
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$7,000.000
|
$10,000.000
|
$7,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
102.000
|
$5.000
|
$11.000
|
$16.500
|
$10.500
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
78.000
|
$250.000
|
$200.000
|
$50.000
|
$230.000
|
$195.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$420.000
|
$200.000
|
$50.000
|
$50.000
|
$500.000
|
|
Totals: |
$1,317,722.930
|
$1,648,548.430
|
$1,654,632.721
|
$1,767,921.153
|
$2,355,480.150
|