PREPARING ROW
|
STA
|
8.800
|
$1,000.000
|
$5,700.000
|
$7,000.000
|
$14,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
292.000
|
$12.000
|
$18.000
|
$20.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,715.000
|
$12.000
|
$30.000
|
$25.000
|
$22.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,941.000
|
$2.000
|
$2.000
|
$3.000
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,471.000
|
$0.250
|
$0.400
|
$1.000
|
$0.450
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,471.000
|
$0.250
|
$0.400
|
$1.000
|
$0.450
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
4,941.000
|
$0.400
|
$0.550
|
$2.000
|
$0.560
|
|
|
VEGETATIVE WATERING
|
MG
|
197.600
|
$25.000
|
$36.000
|
$1.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
552.000
|
$1.000
|
$2.100
|
$4.000
|
$2.300
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
23.700
|
$1.000
|
$35.000
|
$1.000
|
$30.000
|
|
|
PROOF ROLLING
|
HR
|
3.000
|
$200.000
|
$100.000
|
$1.000
|
$90.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
1,338.000
|
$45.000
|
$52.000
|
$60.000
|
$65.000
|
|
|
CEMENT
|
TON
|
43.000
|
$220.000
|
$200.000
|
$250.000
|
$198.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
416.000
|
$6.000
|
$7.200
|
$30.000
|
$25.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
1,943.000
|
$3.000
|
$7.200
|
$20.000
|
$15.000
|
|
|
ASPH (RC-250)
|
TON
|
5.000
|
$750.000
|
$1,250.000
|
$2,250.000
|
$1,600.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
20.000
|
$300.000
|
$615.000
|
$550.000
|
$800.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
16.000
|
$300.000
|
$745.000
|
$250.000
|
$800.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
19.000
|
$300.000
|
$650.000
|
$550.000
|
$800.000
|
|
|
ASPH (AC-15P, AC-10-2TR, OR CRS-2P)
|
TON
|
13.000
|
$700.000
|
$850.000
|
$2,250.000
|
$1,100.000
|
|
|
CEM STABIL BKFL
|
CY
|
43.000
|
$200.000
|
$210.000
|
$250.000
|
$350.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
603.000
|
$300.000
|
$212.000
|
$135.000
|
$230.000
|
|
|
CL C CONC (ABUT)
|
CY
|
34.800
|
$1,000.000
|
$900.000
|
$1,100.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
22.700
|
$1,000.000
|
$950.000
|
$1,200.000
|
$1,300.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
9.100
|
$1,000.000
|
$1,050.000
|
$1,200.000
|
$2,200.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
5,150.000
|
$16.000
|
$17.850
|
$26.000
|
$22.000
|
|
|
APPROACH SLAB
|
CY
|
55.100
|
$800.000
|
$525.000
|
$600.000
|
$850.000
|
|
|
SHEAR KEY
|
CY
|
23.600
|
$350.000
|
$370.000
|
$400.000
|
$580.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
148.500
|
$190.000
|
$252.000
|
$320.000
|
$335.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
895.030
|
$210.000
|
$252.000
|
$320.000
|
$220.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$550.000
|
$525.000
|
$800.000
|
$1,000.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
1,557.000
|
$140.000
|
$170.000
|
$120.000
|
$130.000
|
|
|
RAIL (TY T223)
|
LF
|
332.000
|
$100.000
|
$95.000
|
$120.000
|
$140.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
68.000
|
$100.000
|
$105.000
|
$150.000
|
$140.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$31,500.000
|
$80,000.000
|
$35,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$116,000.000
|
$182,000.000
|
$150,000.000
|
$165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$3,000.000
|
$2,800.000
|
$22,000.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
280.000
|
$40.000
|
$36.000
|
$5.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
280.000
|
$10.000
|
$8.400
|
$1.000
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$15.000
|
$29.000
|
$1.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$3.000
|
$8.400
|
$1.000
|
$2.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
54.000
|
$3.000
|
$5.250
|
$1.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,780.000
|
$3.500
|
$3.100
|
$1.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,780.000
|
$1.000
|
$1.050
|
$1.000
|
$1.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
600.000
|
$25.000
|
$28.000
|
$25.000
|
$31.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,700.000
|
$3,100.000
|
$2,000.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
386.000
|
$3.000
|
$8.000
|
$4.000
|
$3.400
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$3,100.000
|
$3,500.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$275.000
|
$400.000
|
$500.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$350.000
|
$445.000
|
$800.000
|
$480.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$20.000
|
$16.000
|
$30.000
|
$17.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$30.000
|
$38.000
|
$30.000
|
$45.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
22.000
|
$1.000
|
$9.000
|
$5.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,750.000
|
$0.200
|
$2.100
|
$2.000
|
$2.250
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
230.000
|
$0.200
|
$2.100
|
$2.000
|
$2.250
|
|
|
PAVEMENT SEALER 4"
|
LF
|
430.000
|
$2.000
|
$2.100
|
$1.000
|
$2.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
11.000
|
$5.000
|
$26.250
|
$15.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
430.000
|
$0.500
|
$2.100
|
$1.000
|
$2.250
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
87.000
|
$200.000
|
$260.000
|
$300.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$7,800.000
|
$5,000.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
5.000
|
$150.000
|
$400.000
|
$250.000
|
$280.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$150.000
|
$150.000
|
$250.000
|
$500.000
|
|
Totals: |
$1,301,823.900
|
$1,544,163.060
|
$1,712,325.900
|
$1,722,623.960
|