PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
3.000
|
$500.000
|
$900.000
|
$800.000
|
$500.000
|
$2,000.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$2,400.000
|
$615.000
|
$4,000.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
690.000
|
$8.000
|
$9.000
|
$7.000
|
$6.900
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
50.000
|
$30.000
|
$20.000
|
$60.000
|
$15.000
|
$40.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
6.000
|
$500.000
|
$440.000
|
$1,100.000
|
$850.000
|
$2,000.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
50.000
|
$20.000
|
$30.000
|
$50.000
|
$26.000
|
$40.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
6.000
|
$200.000
|
$425.000
|
$400.000
|
$250.000
|
$500.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
503.000
|
$0.150
|
$1.050
|
$0.010
|
$1.000
|
$3.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
503.000
|
$0.150
|
$1.050
|
$0.010
|
$1.000
|
$3.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
1,106.000
|
$0.300
|
$1.050
|
$2.000
|
$1.000
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
9.300
|
$20.000
|
$45.000
|
$15.000
|
$41.000
|
$1.000
|
|
|
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
|
CY
|
299.000
|
$100.000
|
$67.000
|
$100.000
|
$88.700
|
$80.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
1,335.000
|
$4.000
|
$5.000
|
$2.650
|
$4.000
|
$15.000
|
|
|
CEMENT
|
TON
|
30.000
|
$200.000
|
$205.000
|
$300.000
|
$161.000
|
$250.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
1,823.000
|
$2.500
|
$4.700
|
$3.000
|
$3.150
|
$12.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
365.000
|
$4.000
|
$10.000
|
$10.000
|
$5.800
|
$10.000
|
|
|
ASPH (AC-15P)
|
GAL
|
657.000
|
$4.000
|
$6.000
|
$7.000
|
$4.300
|
$10.000
|
|
|
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
|
CY
|
18.000
|
$200.000
|
$355.000
|
$350.000
|
$305.000
|
$700.000
|
|
|
AGGR (TY-D GR-5 OR TY-L GR-5)
|
CY
|
16.000
|
$200.000
|
$340.000
|
$340.000
|
$305.000
|
$700.000
|
|
|
CEM STABIL BKFL
|
CY
|
27.000
|
$100.000
|
$175.000
|
$250.000
|
$86.000
|
$250.000
|
|
|
PRESTR CONC PIL (20 IN SQ)
|
LF
|
735.000
|
$120.000
|
$100.000
|
$127.000
|
$85.000
|
$120.000
|
|
|
CL C CONC (ABUT)
|
CY
|
20.800
|
$1,000.000
|
$1,050.000
|
$1,000.000
|
$1,400.000
|
$1,000.000
|
|
|
CL C CONC (BENT)
|
CY
|
8.000
|
$1,500.000
|
$1,200.000
|
$1,250.000
|
$2,100.000
|
$1,200.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
1,928.000
|
$20.000
|
$18.000
|
$14.000
|
$23.000
|
$20.000
|
|
|
APPROACH SLAB
|
CY
|
46.000
|
$250.000
|
$500.000
|
$180.000
|
$685.000
|
$500.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
472.000
|
$120.000
|
$135.000
|
$150.000
|
$119.000
|
$200.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
289.000
|
$300.000
|
$175.000
|
$150.000
|
$125.000
|
$120.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
34.000
|
$500.000
|
$480.000
|
$500.000
|
$520.000
|
$500.000
|
|
|
RAIL (TY T223)
|
LF
|
144.000
|
$132.000
|
$127.000
|
$123.000
|
$140.000
|
$100.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
56.000
|
$100.000
|
$107.000
|
$75.000
|
$124.000
|
$75.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$15,000.000
|
$15,000.000
|
$58,500.000
|
$15,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$50,000.000
|
$45,000.000
|
$50,000.000
|
$60,000.000
|
$55,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$2,000.000
|
$1,500.000
|
$1,700.000
|
$1,600.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
115.000
|
$40.000
|
$31.000
|
$30.000
|
$30.000
|
$10.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
115.000
|
$10.000
|
$8.400
|
$8.000
|
$8.100
|
$10.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
20.000
|
$80.000
|
$115.000
|
$150.000
|
$166.000
|
$5.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
1,360.000
|
$3.500
|
$3.700
|
$3.850
|
$7.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
260.000
|
$5.000
|
$5.800
|
$6.000
|
$5.600
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,620.000
|
$1.000
|
$1.050
|
$1.100
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (6")
|
LF
|
1,360.000
|
$3.500
|
$4.200
|
$4.400
|
$4.050
|
$8.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$20.000
|
$20.000
|
$21.000
|
$19.250
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$2,800.000
|
$1,500.000
|
$1,370.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.500
|
$4.740
|
$2.750
|
$2.550
|
$2.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$250.000
|
$180.000
|
$250.000
|
$227.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,100.000
|
$2,200.000
|
$2,300.000
|
$2,125.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$300.000
|
$280.000
|
$200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$500.000
|
$470.000
|
$415.000
|
$380.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
2.000
|
$20.000
|
$16.000
|
$16.500
|
$15.100
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$20.000
|
$28.000
|
$30.000
|
$27.500
|
$50.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
200.000
|
$0.250
|
$1.050
|
$1.100
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,320.000
|
$0.400
|
$1.900
|
$2.000
|
$1.850
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
180.000
|
$0.450
|
$2.100
|
$2.200
|
$2.050
|
$10.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
593.000
|
$0.400
|
$1.900
|
$2.000
|
$1.850
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$6.000
|
$10.500
|
$11.000
|
$10.100
|
$40.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
$11,700.000
|
$6,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
8.000
|
$20.000
|
$50.000
|
$50.000
|
$46.000
|
$500.000
|
|
Totals: |
$578,911.400
|
$539,688.900
|
$562,368.810
|
$605,767.200
|
$661,782.300
|