|
|
|
PREPARING ROW
|
STA
|
345.600
|
$1,000.000
|
$1,000.000
|
$1,474.000
|
$2,089.000
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
345.600
|
$400.000
|
$600.000
|
$1,210.000
|
$450.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
345.600
|
$322.000
|
$200.000
|
$301.620
|
$250.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
23,040.000
|
$0.560
|
$0.480
|
$0.410
|
$1.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
7,680.000
|
$0.540
|
$0.480
|
$0.410
|
$1.000
|
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
15,360.000
|
$0.500
|
$0.480
|
$0.350
|
$1.000
|
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
15,360.000
|
$0.440
|
$0.480
|
$0.350
|
$1.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
258.000
|
$14.000
|
$15.000
|
$75.470
|
$50.000
|
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
22,205.000
|
$50.000
|
$41.000
|
$52.800
|
$40.000
|
|
|
|
CEMENT
|
TON
|
550.000
|
$285.000
|
$350.000
|
$321.250
|
$350.000
|
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
62,173.000
|
$6.000
|
$2.400
|
$5.500
|
$8.000
|
|
|
|
ASPH (RC-250)
|
GAL
|
12,435.000
|
$5.600
|
$10.000
|
$9.820
|
$10.000
|
|
|
|
AGGR(TY-D GR-4 SAC-A)
|
CY
|
497.000
|
$235.000
|
$220.000
|
$319.820
|
$350.000
|
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
2,332.000
|
$5.600
|
$8.000
|
$11.010
|
$10.000
|
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
50.000
|
$235.000
|
$150.400
|
$672.400
|
$500.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
30.000
|
$235.000
|
$300.000
|
$330.000
|
$300.000
|
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
160.000
|
$37.000
|
$100.000
|
$72.000
|
$100.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,962.000
|
$1,000.000
|
$1,100.000
|
$2,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,850.000
|
$1,500.000
|
$1,650.000
|
$2,200.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$1,962.000
|
$1,800.000
|
$1,980.000
|
$2,650.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,500.000
|
$2,500.000
|
$2,750.000
|
$2,850.000
|
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$6,650.000
|
$7,500.000
|
$8,250.000
|
$8,500.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
80.000
|
$66.000
|
$60.000
|
$66.000
|
$50.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$384,000.000
|
$390,000.000
|
$850,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$6,000.000
|
$5,000.000
|
$2,090.000
|
$8,500.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
460.000
|
$57.000
|
$46.000
|
$52.250
|
$30.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
460.000
|
$18.000
|
$20.000
|
$16.500
|
$15.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,660.000
|
$5.800
|
$4.500
|
$6.050
|
$18.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,660.000
|
$1.550
|
$1.000
|
$1.100
|
$9.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,017.000
|
$45.000
|
$57.500
|
$67.700
|
$45.000
|
|
|
|
TURNOUTS (ACP)
|
SY
|
848.000
|
$80.000
|
$80.900
|
$64.600
|
$45.000
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,972.000
|
$50.000
|
$34.800
|
$43.340
|
$40.000
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
34,560.000
|
$0.210
|
$0.100
|
$0.310
|
$0.650
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$27.000
|
$28.350
|
$28.050
|
$50.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,240.000
|
$2,020.000
|
$1,925.000
|
$1,850.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$4.900
|
$9.000
|
$2.750
|
$5.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$4.900
|
$200.000
|
$275.000
|
$500.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$4.900
|
$200.000
|
$275.000
|
$500.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,165.000
|
$3,065.000
|
$3,080.000
|
$4,000.000
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
23.000
|
$270.000
|
$320.000
|
$302.500
|
$1,100.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
40.000
|
$630.000
|
$625.000
|
$456.500
|
$1,500.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$685.000
|
$750.000
|
$566.500
|
$1,500.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$760.000
|
$850.000
|
$605.000
|
$1,500.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,290.000
|
$900.000
|
$698.500
|
$1,500.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
53.000
|
$105.000
|
$100.000
|
$82.500
|
$100.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$33.000
|
$25.000
|
$27.500
|
$100.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$39.000
|
$40.000
|
$41.250
|
$100.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
20.000
|
$82.500
|
$75.000
|
$77.000
|
$100.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
10,040.000
|
$0.400
|
$0.640
|
$0.690
|
$1.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
102,384.000
|
$0.470
|
$0.640
|
$0.610
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,073.000
|
$1.550
|
$1.000
|
$2.030
|
$6.000
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
5,020.000
|
$0.520
|
$0.950
|
$0.880
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
51,192.000
|
$0.610
|
$0.850
|
$0.870
|
$1.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
890.000
|
$5.640
|
$8.000
|
$7.700
|
$6.000
|
|
|
|
LITTER REMOVAL
|
AC
|
6.350
|
$72.000
|
$1,000.000
|
$2,489.130
|
$2,500.000
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
6,010.000
|
$160.000
|
$150.000
|
$165.120
|
$180.000
|
|
|
|
TACK COAT
|
GAL
|
1,038.000
|
$10.000
|
$4.000
|
$5.350
|
$10.000
|
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
12,150.000
|
$170.000
|
$163.300
|
$164.930
|
$195.000
|
|
|
|
TACK COAT
|
GAL
|
4,702.000
|
$10.000
|
$5.000
|
$5.350
|
$10.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
114.000
|
$105.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$19,000.000
|
$19,628.400
|
$20,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
155.000
|
$225.000
|
$100.000
|
$388.000
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$540.000
|
$350.000
|
$604.370
|
$550.000
|
|
|
|
AWPT W/PROFILE PM (W)6"(SLD)(175 MIL)
|
LF
|
40,088.000
|
$1.500
|
$3.500
|
$3.850
|
$1.000
|
|
|
|
PATT REFL PAV MRK AWT (Y) 4" (DOT)
|
LF
|
31,148.000
|
$1.500
|
$2.000
|
$2.750
|
$1.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
114.000
|
$105.000
|
$70.000
|
$77.000
|
$150.000
|
|
Totals: |
$7,255,530.150
|
$6,519,737.260
|
$7,683,388.868
|
$8,559,186.400
|