|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
283.000
|
$429.930
|
$280.000
|
$241.840
|
$100.000
|
$425.000
|
$695.000
|
|
|
BACKFILL (TY B)
|
STA
|
283.000
|
$213.580
|
$140.000
|
$62.380
|
$191.800
|
$340.000
|
$295.000
|
|
|
BLADING
|
HR
|
200.000
|
$150.000
|
$140.000
|
$109.410
|
$175.000
|
$125.000
|
$135.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
31,447.000
|
$0.220
|
$0.100
|
$0.160
|
$0.110
|
$0.120
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
31,447.000
|
$0.220
|
$0.100
|
$0.160
|
$0.100
|
$0.120
|
$0.130
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
62,883.000
|
$0.360
|
$0.360
|
$0.420
|
$0.320
|
$0.300
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,588.000
|
$16.530
|
$10.000
|
$38.710
|
$0.010
|
$0.010
|
$12.000
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2) (IN VEH)
|
CY
|
10,801.000
|
$55.000
|
$60.000
|
$60.660
|
$74.000
|
$78.500
|
$89.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
79,961.000
|
$1.780
|
$1.000
|
$0.990
|
$0.860
|
$1.500
|
$2.100
|
|
|
REWORK BS MTL (TY C) (11") (ORD COMP)
|
SY
|
9,895.000
|
$1.950
|
$1.100
|
$1.450
|
$0.860
|
$1.500
|
$2.750
|
|
|
CEMENT
|
TON
|
1,454.000
|
$160.000
|
$170.000
|
$181.330
|
$149.640
|
$156.000
|
$151.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
79,961.000
|
$3.300
|
$3.300
|
$2.780
|
$3.250
|
$1.100
|
$2.750
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(11")
|
SY
|
9,895.000
|
$4.400
|
$4.200
|
$2.500
|
$3.250
|
$1.000
|
$3.250
|
|
|
ASPH (RC-250)
|
GAL
|
17,976.000
|
$4.160
|
$4.300
|
$3.250
|
$4.000
|
$3.500
|
$4.400
|
|
|
AGGR (TY-D GR-5 OR TY-L GR-5)
|
CY
|
719.000
|
$126.000
|
$150.000
|
$117.170
|
$185.740
|
$130.000
|
$143.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,949.000
|
$16.640
|
$53.000
|
$61.090
|
$52.500
|
$50.000
|
$51.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
13.000
|
$131.950
|
$220.000
|
$244.340
|
$210.000
|
$210.000
|
$205.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
48.000
|
$729.420
|
$790.000
|
$1,038.460
|
$630.000
|
$890.000
|
$765.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
144.000
|
$647.330
|
$850.000
|
$1,099.550
|
$840.000
|
$940.000
|
$810.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
820.000
|
$70.000
|
$56.000
|
$63.530
|
$57.750
|
$53.000
|
$53.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
152.000
|
$90.000
|
$100.000
|
$119.730
|
$81.900
|
$100.000
|
$97.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$107.510
|
$135.000
|
$156.380
|
$152.250
|
$130.000
|
$129.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
8.000
|
$9,610.460
|
$6,500.000
|
$7,330.300
|
$8,400.000
|
$6,000.000
|
$6,050.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
12.000
|
$7,526.920
|
$5,800.000
|
$6,719.440
|
$8,925.000
|
$5,500.000
|
$5,550.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,000.000
|
$850.000
|
$977.370
|
$682.500
|
$815.000
|
$810.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$811.640
|
$900.000
|
$1,038.460
|
$787.500
|
$850.000
|
$860.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$1,554.180
|
$950.000
|
$1,099.550
|
$892.500
|
$925.000
|
$910.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,437.000
|
$1,000.000
|
$1,160.630
|
$1,260.000
|
$975.000
|
$960.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,046.730
|
$2,200.000
|
$2,443.430
|
$1,575.000
|
$2,000.000
|
$2,020.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,048.160
|
$750.000
|
$1,038.460
|
$2,625.000
|
$875.000
|
$710.000
|
|
|
REMOV STR (PIPE)
|
LF
|
836.000
|
$15.770
|
$22.000
|
$30.540
|
$15.750
|
$26.000
|
$21.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$354,184.050
|
$240,000.000
|
$301,664.520
|
$412,000.000
|
$315,000.000
|
$342,700.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,200.000
|
$7,000.000
|
$2,000.000
|
$1,880.620
|
$28,000.000
|
$1,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
485.000
|
$33.600
|
$30.000
|
$37.870
|
$32.550
|
$43.000
|
$42.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
485.000
|
$9.480
|
$5.000
|
$12.220
|
$10.500
|
$8.000
|
$8.100
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
32.000
|
$72.030
|
$65.000
|
$125.390
|
$100.000
|
$105.000
|
$166.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,925.000
|
$5.860
|
$5.300
|
$3.670
|
$7.000
|
$5.000
|
$5.050
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,925.000
|
$1.560
|
$1.000
|
$1.220
|
$2.000
|
$1.000
|
$1.050
|
|
|
DRIVEWAYS (CONC)
|
SY
|
242.000
|
$84.290
|
$127.000
|
$152.710
|
$115.500
|
$131.000
|
$121.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
218.000
|
$41.990
|
$40.000
|
$57.080
|
$44.630
|
$39.000
|
$63.000
|
|
|
TURNOUTS (ACP)
|
SY
|
677.000
|
$60.000
|
$25.000
|
$67.560
|
$48.850
|
$37.500
|
$41.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,987.000
|
$24.450
|
$21.000
|
$32.780
|
$23.240
|
$15.500
|
$15.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
37,730.000
|
$0.210
|
$0.200
|
$0.420
|
$0.130
|
$0.250
|
$0.190
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
18,582.000
|
$0.180
|
$0.350
|
$0.500
|
$0.320
|
$0.250
|
$0.190
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
29.000
|
$243.900
|
$230.000
|
$183.750
|
$225.750
|
$225.000
|
$218.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$274.630
|
$240.000
|
$202.680
|
$236.250
|
$235.000
|
$228.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$536.740
|
$520.000
|
$510.680
|
$519.750
|
$515.000
|
$497.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
15.000
|
$456.510
|
$480.000
|
$432.490
|
$472.500
|
$98.000
|
$455.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$112.680
|
$200.000
|
$99.690
|
$99.750
|
$55.000
|
$96.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
32.000
|
$64.270
|
$57.000
|
$39.090
|
$56.700
|
$120.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
113,468.000
|
$0.330
|
$0.290
|
$0.310
|
$0.260
|
$0.250
|
$0.290
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
80.000
|
$4.130
|
$5.250
|
$8.550
|
$5.250
|
$5.000
|
$5.050
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
10,872.000
|
$0.300
|
$0.290
|
$0.310
|
$0.260
|
$0.280
|
$0.290
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
63,316.000
|
$0.350
|
$0.290
|
$0.310
|
$0.260
|
$0.280
|
$0.290
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,415.000
|
$1.140
|
$1.000
|
$1.310
|
$1.000
|
$1.150
|
$1.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
56,637.000
|
$0.350
|
$0.380
|
$0.560
|
$0.370
|
$0.380
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
5,436.000
|
$0.290
|
$0.380
|
$0.790
|
$0.370
|
$0.380
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
31,658.000
|
$0.290
|
$0.380
|
$0.560
|
$0.370
|
$0.380
|
$0.370
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
40.000
|
$13.640
|
$16.000
|
$18.330
|
$10.500
|
$15.750
|
$15.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,582.000
|
$3.180
|
$5.300
|
$4.150
|
$3.150
|
$5.000
|
$5.100
|
|
|
D-GR HMA TY-C SAC-A PG76-22
|
TON
|
9,887.000
|
$100.000
|
$101.000
|
$97.000
|
$104.770
|
$104.000
|
$100.000
|
|
|
TACK COAT
|
GAL
|
899.000
|
$3.670
|
$3.600
|
$9.920
|
$2.940
|
$16.000
|
$9.000
|
|
|
TMA (STATIONARY)
|
DAY
|
210.000
|
$200.530
|
$100.000
|
$295.170
|
$100.000
|
$121.000
|
$345.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$57.030
|
$50.000
|
$30.540
|
$40.000
|
$42.000
|
$41.000
|
|
Totals: |
$4,027,607.720
|
$3,877,452.100
|
$4,036,929.150
|
$4,137,193.060
|
$4,347,138.330
|
$4,415,967.560
|