|
|
PREPARING ROW
|
STA
|
194.300
|
$1,500.000
|
$800.000
|
$341.000
|
$400.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
527.000
|
$20.000
|
$15.000
|
$27.500
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
169.000
|
$15.000
|
$5.000
|
$11.000
|
$15.000
|
|
|
BACKFILL (TY B)
|
STA
|
315.020
|
$200.000
|
$215.000
|
$402.830
|
$230.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
141,600.000
|
$1.000
|
$0.700
|
$0.720
|
$0.920
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
70,800.000
|
$0.750
|
$0.550
|
$0.550
|
$0.840
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
70,800.000
|
$0.750
|
$0.550
|
$0.550
|
$0.820
|
|
|
VEGETATIVE WATERING
|
MG
|
4,531.500
|
$13.000
|
$7.000
|
$17.730
|
$2.000
|
|
|
SUPERPAVE MIXTURES SP-C PG76-22
|
TON
|
25,751.000
|
$110.000
|
$112.000
|
$112.000
|
$115.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
22,951.000
|
$140.000
|
$144.000
|
$135.000
|
$160.000
|
|
|
TACK COAT
|
GAL
|
20,478.000
|
$3.000
|
$0.010
|
$4.840
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,712.000
|
$75.000
|
$50.000
|
$64.000
|
$58.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
204,357.000
|
$1.600
|
$1.300
|
$1.410
|
$1.250
|
|
|
CL A CONC (CURB OUTLET)(TY I)
|
EA
|
2.000
|
$2,500.000
|
$1,200.000
|
$8,250.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$400,000.000
|
$300,000.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$7,500.000
|
$20,000.000
|
$20,000.000
|
$9,500.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
169.000
|
$50.000
|
$42.000
|
$49.500
|
$40.000
|
|
|
TURNOUTS (ACP)
|
SY
|
734.000
|
$45.000
|
$40.000
|
$43.150
|
$35.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
2,764.000
|
$45.000
|
$40.000
|
$42.800
|
$34.000
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
246.000
|
$75.000
|
$100.000
|
$115.500
|
$65.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,659.000
|
$60.000
|
$55.000
|
$64.820
|
$50.000
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
1,943.000
|
$60.000
|
$40.000
|
$64.620
|
$35.000
|
|
|
DRIVEWAYS (CONC)(TYPE 2)
|
SY
|
281.000
|
$85.000
|
$125.000
|
$159.500
|
$88.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
60,949.000
|
$0.220
|
$0.300
|
$0.180
|
$0.200
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
39.000
|
$300.000
|
$300.000
|
$274.110
|
$310.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
5.000
|
$350.000
|
$350.000
|
$284.220
|
$345.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$750.000
|
$700.000
|
$668.590
|
$710.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
35,926.000
|
$0.300
|
$0.130
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
94,581.000
|
$0.200
|
$0.110
|
$0.110
|
$0.110
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,240.000
|
$0.550
|
$0.330
|
$0.340
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
12.000
|
$100.000
|
$50.000
|
$50.430
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
12.000
|
$120.000
|
$70.000
|
$72.840
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
169,788.000
|
$0.200
|
$0.110
|
$0.110
|
$0.110
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
79,227.000
|
$0.500
|
$1.000
|
$1.630
|
$1.400
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
66,160.000
|
$0.750
|
$1.000
|
$1.630
|
$1.400
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
1,120.000
|
$6.000
|
$4.500
|
$4.480
|
$4.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
200.000
|
$20.000
|
$20.000
|
$16.810
|
$16.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$250.000
|
$220.000
|
$224.120
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$350.000
|
$330.000
|
$336.180
|
$330.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
38.000
|
$20.000
|
$16.000
|
$16.810
|
$16.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,074.000
|
$3.000
|
$4.000
|
$3.920
|
$3.850
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,340.000
|
$3.500
|
$4.000
|
$3.920
|
$3.850
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
50,382.000
|
$2.900
|
$3.000
|
$4.080
|
$3.650
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$6,500.000
|
$9,700.490
|
$16,500.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
400.000
|
$4.000
|
$16.000
|
$16.810
|
$16.500
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
7,435.000
|
$3.750
|
$5.000
|
$5.040
|
$5.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
61,476.000
|
$0.500
|
$0.600
|
$0.620
|
$0.600
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
15,593.000
|
$0.550
|
$0.650
|
$0.670
|
$0.660
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
65,734.000
|
$0.550
|
$0.600
|
$0.620
|
$0.600
|
|
|
TMA (STATIONARY)
|
DAY
|
55.000
|
$200.000
|
$300.000
|
$395.660
|
$110.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$50.000
|
$30.000
|
$84.570
|
$22.000
|
|
Totals: |
$9,001,023.480
|
$8,411,111.000
|
$8,542,499.462
|
$9,403,742.460
|