PREPARING ROW
|
AC
|
1.000
|
$1.000
|
$15,000.000
|
$15,000.000
|
$25,000.000
|
|
|
PREPARING ROW
|
STA
|
175.000
|
$5,000.000
|
$6,000.000
|
$1,790.000
|
$2,500.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
776.000
|
$9.000
|
$13.000
|
$27.000
|
$20.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
30.000
|
$40.000
|
$60.000
|
$175.000
|
$70.000
|
|
|
BACKFILL (TY C)
|
STA
|
350.000
|
$270.000
|
$560.000
|
$510.000
|
$650.000
|
|
|
BLADING
|
STA
|
22.000
|
$150.000
|
$340.000
|
$410.000
|
$350.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
24,088.000
|
$1.000
|
$0.580
|
$0.560
|
$0.650
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
24,088.000
|
$0.170
|
$0.100
|
$0.090
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
385.000
|
$10.000
|
$12.000
|
$19.000
|
$15.000
|
|
|
CEMENT
|
TON
|
1,469.000
|
$330.000
|
$320.000
|
$265.000
|
$315.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(10")
|
SY
|
56,497.000
|
$8.000
|
$4.000
|
$4.950
|
$4.750
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
14,124.000
|
$6.500
|
$6.000
|
$7.100
|
$5.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
19,506.000
|
$7.000
|
$4.750
|
$5.100
|
$5.500
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
387.000
|
$185.000
|
$215.000
|
$192.540
|
$270.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
8,370.000
|
$60.000
|
$55.000
|
$62.000
|
$65.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
56,497.000
|
$5.000
|
$4.000
|
$5.000
|
$4.350
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
146,194.000
|
$6.000
|
$4.250
|
$7.000
|
$4.750
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
20.000
|
$172.500
|
$250.000
|
$200.000
|
$125.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
110.000
|
$436.000
|
$300.000
|
$305.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
34.000
|
$750.000
|
$730.000
|
$770.000
|
$850.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
620.000
|
$70.000
|
$55.000
|
$44.000
|
$55.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
284.000
|
$66.400
|
$70.000
|
$63.750
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$90.000
|
$100.000
|
$94.090
|
$95.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
28.000
|
$230.000
|
$180.000
|
$209.430
|
$165.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
71.000
|
$116.000
|
$1,000.000
|
$920.000
|
$950.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$1,400.000
|
$1,700.000
|
$1,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,000.000
|
$5,500.000
|
$6,245.150
|
$7,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
306.000
|
$19.000
|
$25.000
|
$20.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,424,598.790
|
$1,350,000.000
|
$1,314,000.000
|
$1,370,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$10,000.000
|
$17,500.000
|
$22,500.000
|
$30,000.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
72,264.000
|
$0.500
|
$0.300
|
$0.450
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$30.000
|
$25.000
|
$22.750
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,874.000
|
$1,800.000
|
$1,625.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$3.000
|
$3.500
|
$3.000
|
$3.250
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$415.000
|
$165.000
|
$150.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,300.000
|
$3,100.000
|
$2,825.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$275.000
|
$220.000
|
$200.000
|
$225.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$785.000
|
$950.000
|
$863.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$975.000
|
$1,000.000
|
$900.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$1,100.000
|
$1,275.000
|
$1,152.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
30.000
|
$500.000
|
$500.000
|
$455.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
7.000
|
$700.000
|
$530.000
|
$480.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$90.000
|
$130.000
|
$117.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
22.000
|
$24.000
|
$60.000
|
$45.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$60.000
|
$45.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
72,264.000
|
$0.500
|
$0.400
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
7,140.000
|
$2.280
|
$0.400
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
86,864.000
|
$0.500
|
$0.400
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
252.000
|
$4.600
|
$5.000
|
$4.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,086.000
|
$5.060
|
$5.000
|
$4.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
5,030.000
|
$2.280
|
$2.200
|
$1.850
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
265.000
|
$1.900
|
$2.200
|
$2.000
|
$2.200
|
|
|
PAVEMENT SEALER 10"
|
LF
|
250.000
|
$0.500
|
$2.200
|
$2.000
|
$2.200
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
125.000
|
$9.820
|
$55.000
|
$50.000
|
$55.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
17.000
|
$300.000
|
$225.000
|
$205.000
|
$225.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$400.000
|
$275.000
|
$250.000
|
$275.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
80.000
|
$25.000
|
$17.000
|
$15.000
|
$16.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
517.000
|
$3.750
|
$5.000
|
$4.500
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,346.000
|
$4.500
|
$5.000
|
$4.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
171,368.000
|
$0.750
|
$0.600
|
$0.550
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
11.000
|
$80.000
|
$110.000
|
$100.000
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
3.000
|
$86.250
|
$165.000
|
$150.000
|
$165.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
7,300.000
|
$1.000
|
$0.600
|
$0.550
|
$0.600
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
33,953.000
|
$150.000
|
$150.000
|
$170.000
|
$165.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
22,296.000
|
$180.000
|
$155.000
|
$172.000
|
$177.000
|
|
|
TACK COAT
|
GAL
|
51,986.000
|
$6.000
|
$4.500
|
$4.500
|
$5.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$300.000
|
$20,000.000
|
$20,000.000
|
$25,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
45,182.000
|
$5.000
|
$5.200
|
$4.700
|
$5.200
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
72,264.000
|
$0.750
|
$0.900
|
$0.800
|
$0.900
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
5,040.000
|
$0.750
|
$1.100
|
$1.000
|
$1.100
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
57,714.000
|
$0.750
|
$0.900
|
$0.800
|
$0.900
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
7,150.000
|
$0.750
|
$1.100
|
$1.000
|
$1.100
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$150.000
|
$205.000
|
$225.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$200.000
|
$300.000
|
$1.000
|
$300.000
|
|
Totals: |
$15,830,727.810
|
$14,945,724.640
|
$15,744,819.630
|
$15,939,669.200
|