REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,312.000
|
$6.000
|
$15.000
|
$30.000
|
$8.000
|
$6.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
439.000
|
$15.000
|
$20.000
|
$30.000
|
$70.000
|
$38.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1.000
|
$38.060
|
$200.000
|
$100.000
|
$70.000
|
$320.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
40.000
|
$1.800
|
$20.000
|
$20.000
|
$28.000
|
$31.500
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
83.000
|
$70.000
|
$100.000
|
$80.000
|
$150.000
|
$99.200
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
121.000
|
$5.000
|
$10.000
|
$50.000
|
$8.000
|
$21.400
|
|
|
ASPH (TIER II)
|
GAL
|
1,945.000
|
$3.500
|
$8.000
|
$10.000
|
$8.000
|
$7.700
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
48.000
|
$95.000
|
$150.000
|
$200.000
|
$500.000
|
$337.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
50.000
|
$18.880
|
$30.000
|
$20.000
|
$20.000
|
$29.400
|
|
|
TEMPORARY SPL SHORING
|
SF
|
296.000
|
$29.500
|
$60.000
|
$60.000
|
$125.000
|
$19.300
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
88.000
|
$100.000
|
$300.000
|
$150.000
|
$250.000
|
$222.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
456.000
|
$350.000
|
$325.000
|
$350.000
|
$600.000
|
$346.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
425.000
|
$60.000
|
$245.000
|
$80.000
|
$260.000
|
$271.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
620.000
|
$77.000
|
$265.000
|
$80.000
|
$310.000
|
$229.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
3.000
|
$600.000
|
$800.000
|
$1,000.000
|
$1,500.000
|
$1,130.000
|
|
|
RAIL (TY PR3)
|
LF
|
1,044.000
|
$300.000
|
$225.000
|
$200.000
|
$260.000
|
$361.000
|
|
|
RAIL (TY LOW PROF BR RAIL)
|
LF
|
964.000
|
$215.000
|
$75.000
|
$400.000
|
$120.000
|
$309.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 12 IN)
|
EA
|
1.000
|
$9,800.000
|
$6,750.000
|
$8,000.000
|
$7,500.000
|
$6,850.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
698.000
|
$172.000
|
$40.000
|
$20.000
|
$10.000
|
$28.600
|
|
|
REMOV STR (WOOD FENCE & POSTS)
|
LF
|
707.000
|
$25.000
|
$8.000
|
$10.000
|
$3.000
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$132,000.000
|
$130,000.000
|
$140,000.000
|
$135,000.000
|
$115,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,000.000
|
$8,500.000
|
$3,000.000
|
$3,000.000
|
$3,650.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$35.000
|
$25.000
|
$50.000
|
$26.500
|
$29.800
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$10.000
|
$10.000
|
$9.550
|
$10.700
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,205.000
|
$3.900
|
$4.500
|
$10.000
|
$4.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,205.000
|
$1.000
|
$1.000
|
$1.000
|
$0.500
|
$0.560
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$5,500.000
|
$3,000.000
|
$7,000.000
|
$3,500.000
|
$5,110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
380.000
|
$45.000
|
$40.000
|
$60.000
|
$45.000
|
$46.100
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$50.000
|
$40.000
|
$60.000
|
$50.000
|
$47.400
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
260.000
|
$15.000
|
$30.000
|
$20.000
|
$30.000
|
$63.700
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$20.000
|
$30.000
|
$30.000
|
$30.000
|
$35.200
|
|
|
CONC CURB (TY F1)
|
LF
|
41.000
|
$115.000
|
$154.000
|
$100.000
|
$310.000
|
$407.000
|
|
|
CONC CURB (TY F2)
|
LF
|
25.000
|
$200.000
|
$154.000
|
$300.000
|
$330.000
|
$513.000
|
|
|
CONC CURB (TY F3)
|
LF
|
359.000
|
$225.000
|
$261.800
|
$250.000
|
$340.000
|
$319.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
602.000
|
$75.000
|
$98.000
|
$80.000
|
$90.000
|
$116.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,600.000
|
$3,500.000
|
$3,000.000
|
$2,500.000
|
$2,160.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
93.000
|
$40.000
|
$30.000
|
$40.000
|
$20.000
|
$32.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$180.000
|
$350.000
|
$500.000
|
$550.000
|
$417.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$700.000
|
$1,375.000
|
$500.000
|
$1,000.000
|
$1,690.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$115.000
|
$220.000
|
$200.000
|
$150.000
|
$169.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
5.000
|
$20.900
|
$16.500
|
$50.000
|
$20.000
|
$11.200
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
11.000
|
$65.000
|
$192.500
|
$50.000
|
$105.000
|
$112.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
1,360.000
|
$0.720
|
$2.200
|
$4.000
|
$2.000
|
$2.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
20.000
|
$9.430
|
$17.600
|
$8.000
|
$16.000
|
$3.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
880.000
|
$0.510
|
$2.200
|
$4.000
|
$2.000
|
$2.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
70.000
|
$1.970
|
$4.400
|
$4.000
|
$10.000
|
$2.200
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
40.000
|
$0.170
|
$1.260
|
$4.000
|
$1.150
|
$2.600
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
3,632.000
|
$0.320
|
$0.660
|
$4.000
|
$0.600
|
$2.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
40.000
|
$1.190
|
$2.360
|
$2.000
|
$2.150
|
$3.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,632.000
|
$0.990
|
$1.650
|
$2.000
|
$1.500
|
$3.300
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
150.000
|
$5.000
|
$19.800
|
$10.000
|
$18.000
|
$11.600
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
12.000
|
$26.200
|
$71.500
|
$500.000
|
$65.000
|
$108.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
60.000
|
$6.910
|
$12.650
|
$4.000
|
$11.500
|
$7.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,512.000
|
$0.720
|
$0.710
|
$1.000
|
$0.750
|
$0.630
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,360.000
|
$0.940
|
$0.770
|
$2.000
|
$1.000
|
$0.680
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
150.000
|
$2.710
|
$1.590
|
$4.000
|
$1.500
|
$0.730
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
20.000
|
$4.440
|
$5.830
|
$10.000
|
$10.000
|
$0.780
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
12.000
|
$24.680
|
$19.800
|
$300.000
|
$20.000
|
$11.600
|
|
|
LITTER REMOVAL
|
CYC
|
7.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$250.000
|
$1,040.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
11.000
|
$880.000
|
$1,250.000
|
$800.000
|
$1,750.000
|
$1,200.000
|
|
|
REMOVE TIMBER POST
|
EA
|
97.000
|
$255.000
|
$20.000
|
$250.000
|
$25.000
|
$56.000
|
|
|
LANDSCAPE AMENITY (BOULDER)
|
EA
|
12.000
|
$4,000.000
|
$500.000
|
$3,000.000
|
$100.000
|
$564.000
|
|
Totals: |
$1,462,037.880
|
$1,363,047.840
|
$1,560,859.000
|
$1,615,889.500
|
$1,740,018.460
|