REMOVING CONC (MISC)
|
CY
|
1.000
|
$72.000
|
$4,068.750
|
$1,200.000
|
$1,700.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
CY
|
60.000
|
$5.000
|
$16.650
|
$40.000
|
$51.000
|
|
|
BACKFILL (TY A)
|
STA
|
505.000
|
$210.000
|
$168.600
|
$200.000
|
$310.000
|
|
|
BLADING
|
HR
|
54.000
|
$130.000
|
$102.600
|
$150.000
|
$200.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
3,083.000
|
$3.500
|
$5.870
|
$5.000
|
$5.700
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
111.000
|
$200.000
|
$116.030
|
$170.000
|
$115.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
30,615.000
|
$25.000
|
$34.780
|
$42.000
|
$57.700
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
36,850.000
|
$3.500
|
$1.590
|
$1.200
|
$5.650
|
|
|
PLANE ASPH CONC PAV (0" TO 9")
|
SY
|
9,289.000
|
$7.000
|
$2.330
|
$3.400
|
$5.650
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
5,000.000
|
$6.000
|
$11.000
|
$14.000
|
$6.800
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
25.000
|
$700.000
|
$934.800
|
$550.000
|
$1,400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
13.000
|
$550.000
|
$1,150.580
|
$585.000
|
$960.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
240.000
|
$35.000
|
$59.560
|
$40.000
|
$51.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4.000
|
$52.000
|
$442.410
|
$350.000
|
$225.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$3,500.000
|
$5,000.000
|
$5,000.000
|
$5,100.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$1,700.000
|
$3,000.000
|
$2,500.000
|
$2,550.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$2,050.000
|
$3,236.900
|
$3,500.000
|
$4,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,100.000
|
$2,111.550
|
$1,500.000
|
$760.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$558,929.540
|
$500,000.000
|
$565,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$8,000.000
|
$3,600.000
|
$2,500.000
|
$17,550.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
2.000
|
$90.000
|
$125.400
|
$80.000
|
$340.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
60.000
|
$3.500
|
$15.000
|
$7.000
|
$11.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
60.000
|
$1.400
|
$8.000
|
$2.000
|
$5.700
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
208.000
|
$80.000
|
$114.000
|
$80.000
|
$190.000
|
|
|
CONC CURB (TY II)
|
LF
|
45.000
|
$20.000
|
$64.320
|
$60.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
150.000
|
$30.000
|
$46.400
|
$40.000
|
$45.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,900.000
|
$4,292.000
|
$3,700.000
|
$4,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$554.420
|
$1,044.000
|
$900.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$484.590
|
$1,160.000
|
$1,000.000
|
$1,130.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$24.000
|
$58.000
|
$50.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$30.000
|
$87.000
|
$75.000
|
$85.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$330.000
|
$116.000
|
$100.000
|
$110.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,518.000
|
$1.300
|
$1.430
|
$2.000
|
$2.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
760.000
|
$1.400
|
$1.430
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
174.000
|
$1.120
|
$1.200
|
$2.500
|
$2.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
730.000
|
$0.810
|
$1.200
|
$1.250
|
$1.830
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
274.000
|
$5.940
|
$8.000
|
$8.000
|
$17.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$125.360
|
$157.000
|
$200.000
|
$280.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
2.000
|
$177.660
|
$253.000
|
$250.000
|
$340.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$140.170
|
$167.000
|
$225.000
|
$285.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
57.000
|
$36.810
|
$53.000
|
$20.000
|
$68.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
160.000
|
$5.380
|
$10.000
|
$8.000
|
$11.300
|
|
|
PAVEMENT SEALER 4"
|
LF
|
121,235.000
|
$0.140
|
$0.150
|
$0.250
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,655.000
|
$0.370
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
66,149.000
|
$0.290
|
$0.480
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
17,719.000
|
$0.280
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
66,478.000
|
$0.470
|
$0.480
|
$0.500
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
974.000
|
$3.030
|
$4.300
|
$3.000
|
$5.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
644.000
|
$3.000
|
$4.300
|
$3.000
|
$5.700
|
|
|
INSTALL OF CONDUIT BY TRENCHING
|
LF
|
150.000
|
$12.000
|
$15.910
|
$16.000
|
$110.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
200.000
|
$5.000
|
$13.320
|
$10.000
|
$34.500
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
16.000
|
$600.000
|
$400.000
|
$5,100.000
|
$540.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
160.000
|
$30.000
|
$80.000
|
$330.000
|
$40.000
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
2,787.000
|
$98.000
|
$85.620
|
$98.000
|
$136.000
|
|
|
D-GR HMA TY-C PG76-22 (LEVEL-UP)
|
TON
|
290.000
|
$100.000
|
$96.480
|
$144.000
|
$175.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
31,611.000
|
$120.000
|
$108.540
|
$130.000
|
$164.000
|
|
|
BONDING COURSE
|
GAL
|
27,487.000
|
$4.000
|
$4.120
|
$4.000
|
$5.450
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,165.410
|
$12,500.000
|
$16,700.000
|
|
|
TMA (STATIONARY)
|
DAY
|
99.000
|
$200.000
|
$279.550
|
$200.000
|
$210.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
36.000
|
$64.720
|
$152.480
|
$64.000
|
$215.000
|
|
Totals: |
$6,196,224.960
|
$6,003,079.860
|
$7,130,859.350
|
$9,358,512.050
|