REMOVING CONC (RIPRAP)
|
SY
|
76.000
|
$38.000
|
$20.000
|
$40.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
61.000
|
$32.000
|
$20.000
|
$40.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
238.000
|
$29.000
|
$20.000
|
$19.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
10.000
|
$42.000
|
$20.000
|
$19.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
4,260.000
|
$15.000
|
$11.000
|
$12.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
340.000
|
$6.000
|
$20.000
|
$8.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,211.000
|
$9.000
|
$12.500
|
$10.000
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
65.000
|
$0.500
|
$1.000
|
$2.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
318.000
|
$102.000
|
$175.000
|
$100.000
|
|
|
CL A CONC (FLUME)
|
CY
|
1.000
|
$1,250.000
|
$1,000.000
|
$1,000.000
|
|
|
CL C CONC (RETAINING WALL)
|
CY
|
47.000
|
$2,350.000
|
$1,500.000
|
$2,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
56.000
|
$494.000
|
$650.000
|
$525.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
37.000
|
$150.000
|
$300.000
|
$320.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
1.000
|
$1,175.000
|
$5,000.000
|
$2,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
3.000
|
$1,105.000
|
$750.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
3.000
|
$1,175.000
|
$750.000
|
$1,000.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
71.000
|
$195.000
|
$10.000
|
$75.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$185,726.100
|
$165,000.000
|
$173,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,500.000
|
$5,000.000
|
$4,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
85.000
|
$12.000
|
$10.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
85.000
|
$4.000
|
$1.000
|
$2.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
144.000
|
$90.000
|
$200.000
|
$255.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
319.000
|
$29.000
|
$50.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,800.000
|
$63.000
|
$50.000
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,090.000
|
$186.000
|
$132.000
|
$100.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,273.000
|
$109.000
|
$98.000
|
$130.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
6.000
|
$2,200.000
|
$3,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
10.000
|
$3,000.000
|
$3,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
2.000
|
$2,483.000
|
$3,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$3,000.000
|
$3,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
13.000
|
$2,131.000
|
$3,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
15.000
|
$3,500.000
|
$3,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$5,979.000
|
$3,250.000
|
$2,500.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
24.000
|
$527.000
|
$200.000
|
$1,000.000
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
4.000
|
$500.000
|
$250.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
5.000
|
$344.000
|
$350.000
|
$500.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
5.000
|
$304.000
|
$500.000
|
$500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
180.000
|
$50.000
|
$20.000
|
$20.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
180.000
|
$4.000
|
$2.000
|
$3.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
11.000
|
$1,800.000
|
$1,500.000
|
$1,767.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$795.000
|
$1,000.000
|
$700.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
8.000
|
$770.000
|
$350.000
|
$650.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,687.000
|
$12.000
|
$10.000
|
$21.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
2,687.000
|
$9.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,522.000
|
$6.000
|
$1.000
|
$9.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,687.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
4.000
|
$15,000.000
|
$20,000.000
|
$27,063.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
30.000
|
$1,000.000
|
$650.000
|
$895.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
3,645.000
|
$2.500
|
$2.500
|
$3.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
3,645.000
|
$5.000
|
$3.000
|
$3.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
14.000
|
$3,500.000
|
$2,800.000
|
$3,721.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
30.000
|
$1,600.000
|
$1,100.000
|
$1,436.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
27.000
|
$900.000
|
$40.000
|
$45.000
|
|
|
INSTALL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
30.000
|
$900.000
|
$150.000
|
$165.000
|
|
|
REMOV PED SIG LED TRAF SIG LAMP UNIT
|
EA
|
27.000
|
$800.000
|
$150.000
|
$188.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
2.000
|
$362.000
|
$500.000
|
$1,000.000
|
|
|
TREE TRIMMING
|
EA
|
2.000
|
$362.000
|
$250.000
|
$400.000
|
|
|
TREE PROTECTION
|
EA
|
11.000
|
$1,000.000
|
$400.000
|
$750.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,500.000
|
$22,500.000
|
$11,500.000
|
|
|
GROUND BOX (ADJUST)
|
EA
|
16.000
|
$500.000
|
$600.000
|
$752.000
|
|
|
TMA (STATIONARY)
|
DAY
|
233.000
|
$210.000
|
$500.000
|
$450.000
|
|
Totals: |
$1,992,676.100
|
$1,810,443.000
|
$1,910,035.000
|