|
|
PREPARING ROW
|
STA
|
9.000
|
$15,000.000
|
$2,200.000
|
$64,000.000
|
$40,000.000
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
2.000
|
$500.000
|
$120.000
|
$500.000
|
$1,000.000
|
$924.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
1,505.000
|
$100.000
|
$14.000
|
$20.000
|
$36.000
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
110.000
|
$50.000
|
$45.000
|
$50.000
|
$40.000
|
$210.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
16.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
$1,300.000
|
$7,000.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,313.000
|
$50.000
|
$25.000
|
$100.000
|
$45.000
|
$90.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
85.000
|
$200.000
|
$33.000
|
$50.000
|
$40.000
|
$84.000
|
|
|
BACKFILL (TY A)
|
STA
|
23.000
|
$1,000.000
|
$955.000
|
$450.000
|
$700.000
|
$725.000
|
|
|
BLADING
|
STA
|
23.000
|
$700.000
|
$250.000
|
$450.000
|
$500.000
|
$784.000
|
|
|
BLADING
|
HR
|
50.000
|
$235.000
|
$200.000
|
$150.000
|
$200.000
|
$289.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
2,666.000
|
$30.000
|
$0.160
|
$1.000
|
$0.160
|
$0.950
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
5,331.000
|
$5.000
|
$0.760
|
$1.000
|
$0.800
|
$1.800
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
2,666.000
|
$5.000
|
$0.730
|
$1.000
|
$0.750
|
$1.800
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
2,666.000
|
$5.000
|
$0.710
|
$1.000
|
$0.750
|
$1.800
|
|
|
VEGETATIVE WATERING
|
MG
|
205.000
|
$20.000
|
$15.000
|
$50.000
|
$23.000
|
$60.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(11")
|
SY
|
695.000
|
$100.000
|
$90.000
|
$100.000
|
$80.000
|
$120.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
26.000
|
$400.000
|
$300.000
|
$350.000
|
$1,000.000
|
$372.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
1,437.000
|
$16.000
|
$12.000
|
$15.000
|
$15.000
|
$40.000
|
|
|
CEMENT
|
TON
|
26.000
|
$400.000
|
$300.000
|
$350.000
|
$1,000.000
|
$472.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
1,437.000
|
$16.000
|
$11.000
|
$15.000
|
$14.000
|
$28.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
139.000
|
$15.000
|
$13.000
|
$10.000
|
$25.000
|
$35.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
3,656.000
|
$30.000
|
$6.000
|
$8.000
|
$15.000
|
$35.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
76.000
|
$500.000
|
$288.000
|
$500.000
|
$325.000
|
$2,000.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,968.000
|
$15.000
|
$6.500
|
$15.000
|
$15.000
|
$20.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$3,000.000
|
$1,200.000
|
$1,500.000
|
$3,500.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
128.000
|
$140.000
|
$85.000
|
$250.000
|
$150.000
|
$280.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$10,000.000
|
$5,000.000
|
$12,500.000
|
$12,000.000
|
$20,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$5,000.000
|
$2,500.000
|
$2,000.000
|
$5,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,500.000
|
$1,200.000
|
$5,000.000
|
$5,000.000
|
$5,300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$170,000.000
|
$250,000.000
|
$300,000.000
|
$340,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$10,000.000
|
$4,200.000
|
$8,500.000
|
$50,000.000
|
$30,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
100.000
|
$60.000
|
$41.000
|
$30.000
|
$42.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$50.000
|
$15.000
|
$15.000
|
$16.000
|
$21.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
35.000
|
$60.000
|
$17.000
|
$100.000
|
$45.000
|
$86.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$150.000
|
$55.000
|
$150.000
|
$100.000
|
$300.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,000.000
|
$4.150
|
$1.100
|
$4.000
|
$4.500
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,000.000
|
$2.000
|
$0.800
|
$2.000
|
$1.000
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$200.000
|
$93.000
|
$100.000
|
$135.000
|
$380.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$1,250.000
|
$950.000
|
$1,500.000
|
$950.000
|
$1,290.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
$1,634.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$1,500.000
|
$1,200.000
|
$1,427.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,035.000
|
$1,600.000
|
$1,500.000
|
$1,600.000
|
$1,868.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$750.000
|
$115.000
|
$100.000
|
$120.000
|
$207.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$55.000
|
$86.000
|
$100.000
|
$90.000
|
$154.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
1,667.000
|
$1.100
|
$3.300
|
$3.000
|
$3.300
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
450.000
|
$1.100
|
$5.500
|
$3.000
|
$5.500
|
$9.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
50.000
|
$5.000
|
$11.000
|
$20.000
|
$11.000
|
$18.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
1,667.000
|
$1.100
|
$3.300
|
$3.000
|
$3.300
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
210.000
|
$2.500
|
$2.000
|
$3.000
|
$4.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
417.000
|
$2.500
|
$2.000
|
$3.000
|
$4.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
45.000
|
$2.000
|
$1.400
|
$6.000
|
$4.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
84.000
|
$2.000
|
$1.400
|
$6.000
|
$4.000
|
$5.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
220.000
|
$2.500
|
$3.300
|
$3.000
|
$3.300
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
440.000
|
$3.000
|
$3.300
|
$3.000
|
$3.300
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
45.000
|
$15.000
|
$11.000
|
$20.000
|
$11.000
|
$18.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,371.000
|
$2.000
|
$2.200
|
$3.000
|
$2.200
|
$3.600
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,783.000
|
$2.000
|
$1.650
|
$3.000
|
$1.750
|
$2.700
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,912.000
|
$2.000
|
$1.650
|
$3.000
|
$1.750
|
$2.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$250.000
|
$248.000
|
$250.000
|
$250.000
|
$406.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$400.000
|
$330.000
|
$500.000
|
$350.000
|
$541.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$310.000
|
$303.000
|
$250.000
|
$325.000
|
$496.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
23.000
|
$6.000
|
$9.000
|
$6.000
|
$9.000
|
$14.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
70.000
|
$5.000
|
$9.000
|
$6.000
|
$9.000
|
$14.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,334.000
|
$4.000
|
$1.400
|
$3.000
|
$1.500
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$125.000
|
$165.000
|
$250.000
|
$175.000
|
$271.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
1.000
|
$5,900.000
|
$1,100.000
|
$5,000.000
|
$8,000.000
|
$8,500.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
1,841.000
|
$300.000
|
$190.000
|
$140.000
|
$300.000
|
$258.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
153.000
|
$300.000
|
$200.000
|
$170.000
|
$375.000
|
$320.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
958.000
|
$300.000
|
$200.000
|
$175.000
|
$350.000
|
$282.000
|
|
|
TACK COAT
|
GAL
|
603.000
|
$10.000
|
$3.200
|
$8.000
|
$15.000
|
$16.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
175.000
|
$300.000
|
$105.000
|
$150.000
|
$250.000
|
$196.000
|
|
|
TMA (STATIONARY)
|
DAY
|
70.000
|
$272.000
|
$125.000
|
$250.000
|
$500.000
|
$650.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$475.000
|
$125.000
|
$550.000
|
$50.000
|
$925.000
|
|
Totals: |
$2,817,247.900
|
$1,435,639.110
|
$2,869,716.000
|
$2,942,248.010
|
$3,464,174.000
|