|
|
PREPARING ROW
|
STA
|
3.000
|
$2,500.000
|
$4,500.000
|
$7,000.000
|
$6,700.000
|
$10,000.000
|
$5,000.000
|
$3,200.000
|
$29,600.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
2,133.000
|
$5.000
|
$10.250
|
$7.000
|
$8.250
|
$12.500
|
$12.000
|
$4.500
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
120.000
|
$8.000
|
$35.000
|
$33.000
|
$28.000
|
$50.000
|
$25.000
|
$50.000
|
$22.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
289.920
|
$250.000
|
$310.000
|
$223.000
|
$110.000
|
$750.000
|
$300.000
|
$175.000
|
$300.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,010.000
|
$17.000
|
$40.000
|
$32.000
|
$58.000
|
$10.000
|
$30.000
|
$18.000
|
$35.000
|
|
|
BACKFILL (TY B)
|
STA
|
298.000
|
$200.000
|
$250.000
|
$175.000
|
$180.000
|
$50.000
|
$300.000
|
$160.000
|
$300.000
|
|
|
BLADING
|
STA
|
298.000
|
$125.000
|
$200.000
|
$66.000
|
$130.000
|
$25.000
|
$300.000
|
$260.000
|
$300.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
79,445.000
|
$0.350
|
$0.300
|
$0.200
|
$0.300
|
$0.210
|
$0.210
|
$0.580
|
$0.208
|
|
|
STRAW/HAY MLCH SEED(TEMP)(WARM)
|
SY
|
39,723.000
|
$0.250
|
$0.300
|
$0.200
|
$0.300
|
$0.200
|
$0.200
|
$0.550
|
$0.200
|
|
|
STRAW/HAY MLCH SEED(TEMP)(COOL)
|
SY
|
39,723.000
|
$0.250
|
$0.300
|
$0.200
|
$0.300
|
$0.200
|
$0.200
|
$0.550
|
$0.200
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
1,333.000
|
$0.900
|
$1.000
|
$1.700
|
$1.600
|
$0.800
|
$1.850
|
$1.300
|
$1.850
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
667.000
|
$0.250
|
$2.000
|
$2.500
|
$2.500
|
$0.900
|
$2.000
|
$1.300
|
$2.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
667.000
|
$0.250
|
$2.000
|
$2.500
|
$3.000
|
$0.900
|
$2.000
|
$1.300
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,054.000
|
$10.500
|
$10.000
|
$5.000
|
$22.000
|
$1.000
|
$10.000
|
$12.000
|
$0.010
|
|
|
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
|
CY
|
3,900.000
|
$70.000
|
$55.000
|
$50.000
|
$77.000
|
$50.000
|
$77.000
|
$58.500
|
$29.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
77,312.000
|
$10.000
|
$11.000
|
$11.700
|
$12.000
|
$13.000
|
$12.000
|
$14.250
|
$18.000
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
64,427.000
|
$2.000
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
$3.000
|
$2.000
|
$3.000
|
|
|
CEMENT
|
TON
|
1,256.000
|
$150.000
|
$143.000
|
$147.000
|
$150.000
|
$150.000
|
$140.000
|
$185.000
|
$132.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
80,533.000
|
$3.000
|
$3.200
|
$2.900
|
$2.000
|
$3.000
|
$3.500
|
$2.400
|
$3.250
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1)
|
GAL
|
3,919.000
|
$5.000
|
$3.000
|
$3.800
|
$6.500
|
$3.500
|
$3.000
|
$4.750
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
15,462.000
|
$4.000
|
$3.000
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
$4.350
|
$4.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
62,108.000
|
$3.000
|
$2.500
|
$3.300
|
$3.200
|
$3.000
|
$3.200
|
$3.800
|
$3.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
859.000
|
$100.000
|
$110.000
|
$110.000
|
$118.000
|
$125.000
|
$140.000
|
$180.000
|
$124.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
748.000
|
$110.000
|
$110.000
|
$100.000
|
$118.000
|
$130.000
|
$170.000
|
$140.000
|
$124.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
618.000
|
$105.000
|
$115.000
|
$130.000
|
$118.000
|
$160.000
|
$136.000
|
$264.000
|
$112.000
|
|
|
D-GR HMA(SQ) TY-C PG64-22
|
TON
|
987.000
|
$130.000
|
$100.000
|
$135.000
|
$113.000
|
$125.000
|
$120.000
|
$125.000
|
$96.300
|
|
|
CUT & RESTORING PAV
|
SY
|
48.000
|
$114.350
|
$150.000
|
$180.000
|
$170.000
|
$175.000
|
$180.000
|
$120.000
|
$140.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
80.000
|
$250.000
|
$150.000
|
$260.000
|
$125.000
|
$250.000
|
$210.000
|
$220.000
|
$205.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
928.000
|
$30.000
|
$35.000
|
$31.000
|
$44.000
|
$40.000
|
$55.000
|
$60.000
|
$75.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
14.000
|
$1,200.000
|
$1,000.000
|
$875.000
|
$1,000.000
|
$850.000
|
$1,500.000
|
$2,000.000
|
$500.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
3.000
|
$625.000
|
$500.000
|
$600.000
|
$1,000.000
|
$500.000
|
$500.000
|
$1,500.000
|
$400.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
16.000
|
$440.000
|
$475.000
|
$550.000
|
$1,000.000
|
$500.000
|
$500.000
|
$700.000
|
$450.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
15.000
|
$180.000
|
$225.000
|
$220.000
|
$300.000
|
$200.000
|
$180.000
|
$285.000
|
$150.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
17.000
|
$160.000
|
$400.000
|
$360.000
|
$280.000
|
$350.000
|
$350.000
|
$675.000
|
$425.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
13.000
|
$250.000
|
$900.000
|
$460.000
|
$1,000.000
|
$450.000
|
$500.000
|
$870.000
|
$450.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
|
LF
|
26.000
|
$1,100.000
|
$1,200.000
|
$1,350.000
|
$1,900.000
|
$1,300.000
|
$1,800.000
|
$1,100.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,422.000
|
$50.000
|
$48.000
|
$46.000
|
$40.000
|
$45.000
|
$35.000
|
$40.000
|
$40.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
252.000
|
$60.000
|
$71.000
|
$88.000
|
$50.000
|
$86.000
|
$45.000
|
$50.000
|
$50.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4.000
|
$75.000
|
$185.000
|
$180.000
|
$60.000
|
$175.000
|
$70.000
|
$160.000
|
$70.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
52.000
|
$105.000
|
$200.000
|
$210.000
|
$79.000
|
$200.000
|
$100.000
|
$115.000
|
$100.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
44.000
|
$114.000
|
$190.000
|
$310.000
|
$97.000
|
$300.000
|
$140.000
|
$125.000
|
$150.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
32.000
|
$142.000
|
$225.000
|
$420.000
|
$118.000
|
$400.000
|
$180.000
|
$170.000
|
$175.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$4,000.000
|
$2,700.000
|
$2,600.000
|
$2,250.000
|
$2,500.000
|
$2,500.000
|
$4,200.000
|
$2,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
5.000
|
$3,000.000
|
$3,200.000
|
$3,600.000
|
$3,500.000
|
$3,500.000
|
$3,500.000
|
$4,500.000
|
$3,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,300.000
|
$5,500.000
|
$5,600.000
|
$5,800.000
|
$5,500.000
|
$5,000.000
|
$7,200.000
|
$4,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$8,000.000
|
$8,500.000
|
$9,400.000
|
$7,500.000
|
$9,000.000
|
$7,000.000
|
$8,700.000
|
$5,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$7,200.000
|
$9,500.000
|
$10,200.000
|
$1,050.000
|
$10,000.000
|
$8,000.000
|
$9,000.000
|
$5,500.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
2.000
|
$38,958.000
|
$36,750.000
|
$43,000.000
|
$45,250.000
|
$42,000.000
|
$32,000.000
|
$30,000.000
|
$40,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
4.000
|
$9,750.000
|
$13,500.000
|
$6,700.000
|
$6,100.000
|
$6,500.000
|
$10,000.000
|
$7,500.000
|
$9,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$650.000
|
$800.000
|
$780.000
|
$1,600.000
|
$750.000
|
$450.000
|
$515.000
|
$500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$750.000
|
$900.000
|
$880.000
|
$1,300.000
|
$850.000
|
$500.000
|
$615.000
|
$625.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
102.000
|
$600.000
|
$650.000
|
$880.000
|
$1,200.000
|
$800.000
|
$525.000
|
$615.000
|
$625.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$875.000
|
$850.000
|
$880.000
|
$750.000
|
$825.000
|
$650.000
|
$750.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,100.000
|
$900.000
|
$950.000
|
$900.000
|
$900.000
|
$900.000
|
$940.000
|
$900.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$2,100.000
|
$1,050.000
|
$2,000.000
|
$975.000
|
$1,075.000
|
$1,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,800.000
|
$1,600.000
|
$2,600.000
|
$2,900.000
|
$2,500.000
|
$5,000.000
|
$2,000.000
|
$1,800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
100.000
|
$25.000
|
$50.000
|
$32.000
|
$30.000
|
$30.000
|
$50.000
|
$16.000
|
$20.000
|
|
|
REMOV STR (PIPE)
|
EA
|
58.000
|
$300.000
|
$500.000
|
$730.000
|
$450.000
|
$700.000
|
$350.000
|
$550.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$370,754.000
|
$350,753.600
|
$250,000.000
|
$488,000.000
|
$412,000.000
|
$400,000.000
|
$350,000.000
|
$441,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$3,500.000
|
$3,000.000
|
$8,260.000
|
$7,000.000
|
$3,500.000
|
$2,500.000
|
$2,200.000
|
$2,075.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
945.000
|
$27.000
|
$25.000
|
$30.000
|
$22.000
|
$25.000
|
$35.000
|
$24.000
|
$20.100
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
585.000
|
$30.000
|
$27.000
|
$34.000
|
$24.000
|
$30.000
|
$55.000
|
$24.750
|
$22.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,530.000
|
$7.500
|
$8.500
|
$4.000
|
$9.000
|
$5.000
|
$10.000
|
$11.250
|
$8.120
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
200.000
|
$20.000
|
$35.000
|
$12.000
|
$13.000
|
$60.000
|
$30.000
|
$32.000
|
$35.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$90.000
|
$100.000
|
$60.000
|
$62.000
|
$120.000
|
$50.000
|
$250.000
|
$35.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,240.000
|
$2.750
|
$3.000
|
$3.100
|
$2.750
|
$2.500
|
$3.000
|
$1.850
|
$2.580
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,240.000
|
$0.750
|
$1.000
|
$0.600
|
$1.100
|
$0.500
|
$1.000
|
$0.550
|
$1.040
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$230.000
|
$100.000
|
$85.000
|
$94.000
|
$120.000
|
$50.000
|
$250.000
|
$35.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
578.000
|
$40.000
|
$40.000
|
$36.000
|
$21.000
|
$25.000
|
$25.000
|
$30.000
|
$34.400
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,823.000
|
$30.000
|
$40.000
|
$28.000
|
$21.000
|
$25.000
|
$25.000
|
$35.000
|
$28.900
|
|
|
TURNOUTS (ACP)
|
SY
|
590.000
|
$40.000
|
$40.000
|
$34.000
|
$21.000
|
$35.000
|
$25.000
|
$36.000
|
$34.070
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
512.000
|
$94.500
|
$100.000
|
$135.000
|
$70.000
|
$130.000
|
$100.000
|
$90.000
|
$105.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
1,000.000
|
$33.750
|
$26.500
|
$26.000
|
$23.000
|
$25.000
|
$10.000
|
$30.000
|
$35.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
24.000
|
$210.000
|
$230.000
|
$240.000
|
$250.000
|
$225.000
|
$350.000
|
$305.000
|
$150.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$230.000
|
$250.000
|
$240.000
|
$250.000
|
$225.000
|
$300.000
|
$440.000
|
$210.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$530.000
|
$680.000
|
$320.000
|
$620.000
|
$300.000
|
$500.000
|
$605.000
|
$590.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
82.000
|
$335.000
|
$330.000
|
$350.000
|
$350.000
|
$325.000
|
$500.000
|
$740.000
|
$300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
87.000
|
$135.000
|
$100.000
|
$110.000
|
$90.000
|
$100.000
|
$100.000
|
$95.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
46.000
|
$65.000
|
$60.000
|
$45.000
|
$73.000
|
$40.000
|
$55.000
|
$40.000
|
$45.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
59,590.000
|
$0.250
|
$1.050
|
$0.100
|
$0.100
|
$0.100
|
$0.120
|
$0.110
|
$0.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
192.000
|
$3.000
|
$3.150
|
$3.000
|
$3.250
|
$3.000
|
$6.000
|
$3.300
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
4,469.000
|
$0.350
|
$0.150
|
$0.140
|
$0.150
|
$0.140
|
$0.150
|
$0.160
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
37,542.000
|
$0.250
|
$0.150
|
$0.100
|
$0.100
|
$0.100
|
$0.120
|
$0.110
|
$0.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,424.000
|
$0.800
|
$0.900
|
$0.600
|
$1.500
|
$1.000
|
$0.750
|
$1.450
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
192.000
|
$6.000
|
$5.600
|
$6.000
|
$5.750
|
$5.300
|
$8.000
|
$5.850
|
$5.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
59,590.000
|
$0.280
|
$0.400
|
$0.350
|
$0.400
|
$0.340
|
$0.330
|
$0.380
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,469.000
|
$0.270
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
$0.420
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
37,542.000
|
$0.290
|
$0.400
|
$0.350
|
$0.400
|
$0.340
|
$0.330
|
$0.380
|
$0.340
|
|
REFL PAV MRKR TY I-A
|
EA
|
902.000
|
$4.000
|
$3.500
|
$3.500
|
$3.500
|
$3.200
|
$3.200
|
$3.550
|
$3.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
16.000
|
$3.000
|
$3.500
|
$3.500
|
$3.500
|
$3.200
|
$4.000
|
$3.550
|
$3.200
|
|
|
FLOATING TURBIDITY BARRIER
|
LF
|
150.000
|
$65.000
|
$35.000
|
$25.000
|
$55.000
|
$65.000
|
$55.000
|
$26.000
|
$90.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$78.000
|
$125.000
|
$125.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$200.000
|
|
Totals: |
$3,920,875.610
|
$3,972,777.000
|
$3,976,253.520
|
$4,227,366.000
|
$4,287,620.640
|
$4,361,625.930
|
$4,543,996.520
|
$4,569,890.790
|