VICTORIA US 87 (0143-10-058)

Items: 118

County: VICTORIA
Length: 4.4390 MILES
Highway: US 87
District: YOAKUM
Control Number: 0143-10-058
DBE Goal: 0.0%
Project: F 2025(821)
Guaranty: $100,000.00
Time: 255 WORKING DAYS
Engineer's Estimate: $6,552,127.50
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263206
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00207181
Contract Type: FEDERAL
Project Description: INSTALL SIDEWALKS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$6,552,127.50
$5,349,518.54
Over/Under Est: -18.35% -$1,202,608.96
Over/Under Est: -17.86% -$1,170,085.30
Amt Left: 0.61% $32,523.66
$5,973,904.62
Over/Under Est: -8.82% -$578,222.88
Amt Left: 11.67% $624,386.08
Delta: -11.00% -$591,862.42
$6,193,896.09
Over/Under Est: -5.47% -$358,231.41
Amt Left: 15.78% $844,377.55
Delta: -3.68% -$219,991.47
Over/Under Est: -4.7% -$307,786.17
Amt Left: 16.73% $894,822.79
Delta: -0.81% -$50,445.24
Over/Under Est: 4.68% $306,826.90
Amt Left: 28.22% $1,509,435.86
Delta: -9.84% -$614,613.07
Over/Under Est: 5.03% $329,350.50
Amt Left: 28.64% $1,531,959.46
Delta: -0.33% -$22,523.60

Bid Items & Bid Tabulations

118 Total 0 of 118
VICTORIA  |  US 87  |  YOAKUM  |  0143-10-058  |  09/03/2026 1:00 PM CDT  |  $6,552,127.50  |  F 2025(821)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  255 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
D&S CONCRETE CONTRACTORS LLC
TI-ZACK CONCRETE, LLC
STX CIVIL
HUNTER INDUSTRIES, LTD.
REXCON ENTERPRISES, LLC
TIGHT LINE CONSTRUCTION, LLC
REMOV CONC (MOWSTRIP)
SY 17.000 $50.000 $118.026 $40.000 $36.000 $13.500 $20.000 $63.000 $100.000
REMOV CONC (RIPRAP)
SY 10.000 $50.000 $190.645 $40.000 $48.960 $23.860 $18.000 $53.000 $100.000
REMOV CONC (MEDIANS)
SY 88.000 $27.000 $289.437 $40.000 $27.820 $23.810 $25.000 $86.000 $50.000
REMOV CONC (DRIVEWAYS)
SY 2,463.000 $25.000 $51.246 $33.000 $24.850 $15.810 $25.000 $41.000 $20.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 1,711.000 $35.000 $23.326 $33.000 $17.880 $10.850 $35.000 $39.000 $30.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 9,994.000 $15.000 $15.494 $5.000 $6.740 $8.600 $7.000 $16.000 $20.000
REMOV CONC (FLUME)
SY 11.000 $75.000 $142.812 $40.000 $55.640 $8.380 $21.000 $49.000 $100.000
REMOV CONC (MISC)
SY 3.000 $100.000 $374.980 $40.000 $61.200 $8.840 $88.000 $43.000 $250.000
RMV (8") TRT/UNTRT BASE & ASPH PAV
SY 316.000 $22.000 $51.129 $15.000 $29.050 $12.400 $77.000 $59.000 $35.000
BLOCK SODDING
SY 9,776.000 $12.000 $4.784 $10.000 $4.050 $11.670 $5.000 $6.500 $6.500
VEGETATIVE WATERING
TGL 81.800 $30.000 $87.462 $7.000 $30.800 $53.180 $38.510 $245.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 965.000 $115.000 $144.951 $75.000 $99.000 $164.840 $104.160 $200.000 $110.000
PLANE ASPH CONC PAV (0" TO 2" MICRO)
SY 299.000 $35.000 $43.472 $15.000 $55.000 $12.400 $27.500 $39.000 $20.000
CUT & RESTORE ASPH PAVING
SY 101.000 $180.000 $275.920 $150.000 $99.000 $104.870 $140.000 $295.000 $100.000
RIPRAP (CONC)(5 IN)
CY 106.000 $600.000 $647.767 $1,000.000 $769.020 $638.310 $725.000 $800.000 $650.000
RIPRAP (MOW STRIP)(6 IN)
CY 16.000 $715.000 $818.567 $1,000.000 $769.020 $606.260 $835.000 $805.000 $1,500.000
MULTI-LAYER POLYMER OVERLAY
SY 223.000 $275.000 $88.400 $37.000 $74.800 $88.140 $78.170 $110.000 $95.000
STR STEEL (MISC NON-BRIDGE)
LB 280.000 $35.000 $47.882 $10.000 $16.500 $25.870 $45.000 $35.000 $45.000
RAIL (HANDRAIL)(TY A)
LF 353.000 $120.000 $105.439 $75.000 $116.600 $215.940 $109.030 $125.000 $125.000
RETROFIT RAIL (TY T221)
LF 516.000 $400.000 $107.719 $125.000 $170.500 $155.040 $262.000 $130.000 $225.000
RETROFIT RAIL (TY C221)
LF 160.000 $400.000 $168.143 $125.000 $352.000 $161.020 $512.000 $310.000 $150.000
RETROFIT RAIL (TY PR11)
LF 266.000 $250.000 $167.787 $107.000 $165.000 $232.010 $203.000 $200.000 $225.000
RC PIPE (CL III)(24 IN)
LF 9.000 $132.000 $426.537 $200.000 $165.000 $219.350 $400.000 $250.000 $550.000
INLET (COMP)(TY SIDEWALK BRIDGE)
EA 5.000 $14,000.000 $12,719.139 $3,500.000 $12,100.000 $15,605.900 $14,000.000 $21,400.000 $32,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,550.000 $3,489.849 $3,000.000 $1,925.000 $1,685.830 $2,620.000 $9,050.000 $6,500.000
ADJUSTING MANHOLES & INLETS
EA 6.000 $5,500.000 $635.176 $1,800.000 $1,020.000 $1,185.300 $2,130.000 $1,800.000 $3,000.000
CLEAN EXIST CULVERTS
CY 126.000 $350.000 $114.312 $20.000 $27.500 $77.030 $200.000 $225.000 $100.000
REMOV STR (RET WALL)
LF 100.000 $130.000 $549.311 $15.000 $13.200 $67.880 $300.000 $32.000 $75.000
REMOV STR (WOOD STR)
LF 206.000 $50.000 $70.587 $15.000 $13.200 $41.190 $350.000 $7.000 $50.000
MOBILIZATION
LS 1.000 $613,445.500 $520,828.380 $450,000.000 $554,320.000 $532,199.480 $617,870.150 $685,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $3,000.000 $6,464.951 $5,000.000 $2,750.000 $7,406.540 $16,669.780 $7,450.000 $5,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $6,300.000 $3,500.000 $0.110 $7,741.870 $5,254.670 $16,900.000 $18,000.000
TMA (STATIONARY)
DAY 20.000 $500.000 $325.000 $500.000 $0.110 $197.030 $157.640 $325.000 $500.000
SANDBAGS FOR EROSION CONTROL
EA 30.000 $10.000 $6.500 $20.000 $5.500 $38.890 $12.000 $18.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $5.000 $4.875 $5.000 $2.200 $9.070 $2.660 $3.500 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $2.000 $1.300 $1.000 $1.100 $3.890 $1.000 $2.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,585.000 $10.000 $11.050 $3.000 $5.500 $10.370 $6.870 $9.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,585.000 $2.000 $1.300 $0.500 $1.100 $2.590 $1.000 $2.000 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 80.000 $65.000 $105.966 $80.000 $71.500 $94.510 $75.000 $88.000 $115.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $80.000 $116.611 $90.000 $82.500 $94.470 $125.000 $100.000 $125.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 80.000 $10.000 $45.868 $20.000 $11.000 $12.300 $41.000 $23.000 $35.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $36.583 $20.000 $11.000 $12.300 $71.000 $22.000 $45.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 80.000 $16.000 $39.618 $15.000 $22.000 $14.030 $56.000 $52.000 $50.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $22.000 $69.680 $15.000 $22.000 $14.030 $102.000 $58.000 $60.000
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
LF 780.000 $90.000 $48.143 $145.000 $55.000 $86.040 $36.000 $79.000 $120.000
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
LF 570.000 $35.000 $14.617 $10.000 $11.000 $12.950 $20.000 $20.000 $35.000
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
LF 780.000 $60.000 $30.522 $10.000 $11.000 $16.740 $20.000 $18.000 $45.000
COLORED TEXTURED CONC (4")
SY 609.000 $128.000 $90.649 $135.000 $132.360 $136.970 $126.000 $175.000 $130.000
CONC CURB (TY I)
LF 550.000 $50.000 $23.478 $30.000 $55.700 $34.960 $15.000 $22.000 $30.000
CONC CURB (TY II)
LF 3,180.000 $55.000 $23.478 $30.000 $55.700 $44.140 $18.000 $12.000 $35.000
CONC CURB & GUTTER (TY II)
LF 8,504.000 $65.000 $49.595 $28.000 $55.700 $46.290 $35.000 $50.000 $50.000
CONC CURB (TY F2)
LF 110.000 $230.000 $139.813 $30.000 $152.310 $248.820 $212.000 $220.000 $225.000
CONC CURB (TY C1)
LF 286.000 $150.000 $94.270 $30.000 $94.640 $133.600 $132.000 $150.000 $250.000
CONC CURB (TY F1)
LF 20.000 $225.000 $699.015 $30.000 $157.740 $232.300 $151.000 $180.000 $325.000
CONC CURB (TY F3)
LF 263.000 $250.000 $177.025 $30.000 $236.610 $209.150 $256.000 $255.000 $375.000
DRIVEWAYS (CONC)
SY 6,403.000 $135.000 $89.505 $105.000 $118.170 $125.690 $118.000 $155.000 $115.000
DRIVEWAYS (CONC) (HES)
SY 844.000 $160.000 $114.153 $115.000 $114.310 $134.870 $125.000 $175.000 $130.000
CONC SIDEWALKS (5")
SY 18,178.000 $83.000 $68.991 $105.000 $110.810 $99.440 $105.000 $96.000 $105.000
CURB RAMPS (TY 1)
SY 323.000 $250.000 $186.473 $150.000 $133.050 $178.000 $220.000 $320.000 $275.000
CURB RAMPS (TY 2)
SY 98.000 $250.000 $192.309 $150.000 $133.050 $185.900 $200.000 $285.000 $275.000
CURB RAMPS (TY 7)
SY 717.000 $240.000 $163.260 $150.000 $133.050 $216.180 $185.000 $285.000 $250.000
CURB RAMPS (TY 22)
SY 68.000 $240.000 $265.079 $160.000 $133.050 $167.030 $200.000 $405.000 $300.000
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $30.000 $32.280 $55.000 $33.610 $38.630 $29.220 $32.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $5,824.107 $2,000.000 $2,414.500 $2,693.600 $2,205.110 $5,250.000 $2,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,000.000 $4,400.607 $1,500.000 $1,358.500 $2,518.610 $1,487.780 $1,300.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $3.000 $9.082 $10.000 $3.300 $3.890 $1.590 $3.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $300.000 $756.852 $200.000 $242.000 $615.720 $138.150 $235.000 $625.000
RM MTL BM GD FEN TRANS (T101)
EA 2.000 $300.000 $1,135.278 $200.000 $286.000 $550.910 $185.970 $275.000 $575.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $2,064.843 $2,500.000 $3,844.500 $4,665.190 $3,905.430 $3,700.000 $4,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $1,135.278 $500.000 $363.000 $518.500 $159.410 $350.000 $525.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,300.000 $1,651.055 $1,000.000 $1,666.500 $1,944.370 $1,328.380 $1,600.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,459.845 $500.000 $891.000 $1,685.120 $1,009.570 $860.000 $3,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,701.303 $10,000.000 $9,014.500 $10,888.470 $8,342.210 $8,700.000 $12,000.000
RELOCATE EXISTING MAILBOX
EA 13.000 $400.000 $455.000 $200.000 $280.500 $453.690 $255.000 $305.000 $300.000
CONDT (PVC) (SCH 40) (2")
LF 1,300.000 $15.000 $23.237 $24.250 $13.200 $15.550 $12.630 $25.000 $31.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 2,355.000 $24.000 $33.554 $34.510 $22.000 $45.370 $21.050 $37.000 $45.000
ELEC CONDR (NO.8) BARE
LF 3,655.000 $2.200 $2.120 $1.970 $2.200 $2.590 $2.100 $2.000 $3.750
GROUND BOX TY D (162922)W/APRON
EA 31.000 $1,600.000 $1,524.553 $1,442.000 $1,650.000 $1,561.980 $1,578.740 $1,550.000 $1,900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $750.000 $1,105.000 $700.000 $775.500 $1,101.810 $850.000 $900.000 $750.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 6.000 $600.000 $642.200 $700.000 $495.000 $640.340 $450.000 $525.000 $1,150.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 30.000 $600.000 $547.300 $350.000 $495.000 $545.720 $700.000 $445.000 $650.000
REMOVE SM RD SN SUP&AM
EA 6.000 $120.000 $130.000 $150.000 $495.000 $129.630 $110.000 $105.000 $350.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,177.000 $1.000 $1.950 $1.500 $1.340 $1.580 $2.000 $1.500 $2.250
RE PM TY II (W) 6" (BRK)
LF 820.000 $2.000 $0.715 $0.550 $0.810 $0.960 $0.480 $0.600 $1.000
RE PM TY II (W) 6" (SLD)
LF 4,334.000 $0.250 $0.715 $0.550 $0.810 $0.960 $0.480 $0.600 $1.000
RE PM TY II (W) 8" (SLD)
LF 1,177.000 $1.000 $0.715 $0.550 $1.010 $1.190 $0.620 $0.600 $1.000
RE PM TY II (Y) 6" (BRK)
LF 820.000 $0.250 $0.715 $0.550 $0.810 $0.960 $0.480 $0.600 $1.000
RE PM TY II (Y) 6" (SLD)
LF 3,283.000 $0.250 $0.715 $0.550 $0.810 $0.960 $0.480 $0.600 $1.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 840.000 $1.000 $1.950 $1.500 $1.280 $1.500 $4.500 $1.500 $2.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 4,334.000 $1.000 $1.950 $1.500 $1.280 $1.500 $2.200 $1.500 $2.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 820.000 $1.000 $1.950 $1.500 $1.280 $1.530 $4.500 $1.500 $2.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,283.000 $1.000 $1.950 $1.500 $1.280 $1.500 $2.200 $1.500 $2.000
PREFAB PM TY C (W)(24")(SLD)
LF 2,443.000 $30.000 $18.200 $14.000 $11.440 $13.480 $14.000 $15.000 $18.000
PREFAB PM TY C (W)(ARROW)
EA 2.000 $250.000 $390.000 $300.000 $264.000 $311.100 $150.000 $320.000 $425.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000 $340.000 $520.000 $400.000 $308.000 $362.940 $250.000 $425.000 $525.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $250.000 $455.000 $350.000 $286.000 $337.030 $200.000 $370.000 $450.000
PREFAB PM TY C (W)(18")(YLD TRI)
EA 27.000 $70.000 $45.500 $35.000 $46.200 $54.440 $15.000 $37.000 $40.000
REFL PAV MRKR TY I-C
EA 263.000 $6.000 $8.450 $6.500 $4.620 $5.440 $7.500 $7.000 $8.500
REFL PAV MRKR TY II-A-A
EA 328.000 $6.000 $8.450 $6.500 $4.620 $5.440 $7.500 $7.000 $8.500
REFL PAV MRKR TY II-C-R
EA 51.000 $7.250 $8.450 $6.500 $4.620 $5.440 $7.500 $7.000 $8.500
TRAFFIC BUTTON TY W
EA 610.000 $5.000 $5.850 $4.500 $3.080 $3.630 $4.500 $5.000 $6.000
TRAFFIC BUTTON TY Y
EA 390.000 $5.000 $5.850 $4.500 $3.080 $3.630 $4.500 $5.000 $6.000
ELIM EXT PM & MRKS (6")
LF 7,592.000 $1.000 $1.300 $1.000 $0.680 $0.800 $0.750 $1.000 $1.500
ELIM EXT PM & MRKS (8")
LF 310.000 $1.500 $1.300 $1.000 $0.970 $1.140 $0.850 $1.000 $1.500
ELIM EXT PM & MRKS (12")
LF 223.000 $2.500 $3.900 $3.000 $2.400 $2.830 $0.950 $3.000 $4.500
ELIM EXT PM & MRKS (24")
LF 618.000 $5.000 $7.800 $6.000 $3.780 $4.460 $4.500 $6.500 $8.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 1.000 $65.000 $260.000 $1.000 $165.000 $194.440 $50.000 $210.000 $400.000
PED SIG SEC (LED)(COUNTDOWN)
EA 50.000 $1,000.000 $890.389 $915.250 $660.000 $900.890 $631.500 $970.000 $1,400.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 7,550.000 $2.750 $3.706 $3.750 $3.300 $3.050 $3.160 $4.000 $5.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 7,900.000 $2.600 $3.487 $3.450 $3.630 $2.660 $3.470 $3.500 $3.500
PED POLE ASSEMBLY
EA 43.000 $3,000.000 $2,046.875 $2,612.000 $2,860.000 $2,851.740 $2,736.490 $2,650.000 $3,500.000
PEDESTRIAN PUSH BUTTON POLE
EA 2.000 $2,000.000 $2,737.433 $2,246.000 $2,640.000 $2,851.740 $2,525.990 $2,300.000 $3,000.000
PED DETECT PUSH BUTTON (APS)
EA 52.000 $800.000 $1,104.107 $1,070.000 $825.000 $1,250.880 $789.370 $1,100.000 $1,400.000
PED DETECTOR CONTROLLER UNIT
EA 9.000 $4,000.000 $5,486.622 $5,169.000 $3,685.000 $6,092.350 $3,525.860 $5,250.000 $7,000.000
DRIFTWOOD REMOVAL
CY 6.000 $75.000 $1,345.000 $75.000 $660.000 $1,685.120 $1,000.000 $285.000 $250.000
SHRUB PLANTING AND REMOVAL
EA 19.000 $250.000 $472.494 $150.000 $266.200 $32.410 $275.000 $210.000 $150.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 122.000 $40.000 $43.693 $14.000 $44.000 $51.850 $50.000 $32.000 $75.000
REPLACING ELASTOMERIC BEARING PADS
EA 2.000 $10,000.000 $13,650.000 $6,000.000 $22,000.000 $13,610.580 $13,035.700 $15,000.000 $17,500.000
Totals: $6,552,127.500 $5,349,518.493 $5,382,042.200 $5,973,904.620 $6,193,896.094 $6,244,341.328 $6,858,954.400 $6,881,478.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $11,500.00