PREPARING ROW
|
STA
|
21.030
|
$3,000.000
|
$1,800.000
|
$325.000
|
$5,700.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,057.000
|
$8.000
|
$14.000
|
$16.490
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,698.000
|
$14.000
|
$21.000
|
$20.480
|
$20.000
|
|
|
BLADING
|
HR
|
16.000
|
$95.000
|
$65.000
|
$85.000
|
$180.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
13,025.000
|
$0.500
|
$0.450
|
$0.290
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
3,257.000
|
$0.500
|
$0.590
|
$0.270
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
3,257.000
|
$0.500
|
$0.590
|
$0.270
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
365.400
|
$20.000
|
$45.000
|
$19.120
|
$50.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
1,417.500
|
$75.000
|
$90.000
|
$78.010
|
$100.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
6,029.800
|
$3.000
|
$5.000
|
$3.250
|
$3.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
71.500
|
$160.000
|
$170.000
|
$150.000
|
$185.000
|
|
|
ASPH (RC-250)
|
GAL
|
1,134.600
|
$4.000
|
$7.500
|
$7.000
|
$8.000
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
38.500
|
$120.000
|
$150.000
|
$325.200
|
$300.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
150.600
|
$100.000
|
$135.000
|
$163.700
|
$300.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
5,203.200
|
$3.250
|
$4.250
|
$4.650
|
$8.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
647.200
|
$80.000
|
$105.000
|
$121.000
|
$120.000
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
282.100
|
$85.000
|
$105.000
|
$132.750
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
67.000
|
$125.000
|
$175.000
|
$106.800
|
$150.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,200.000
|
$10.000
|
$10.000
|
$24.000
|
$42.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
765.000
|
$125.000
|
$183.000
|
$196.050
|
$180.000
|
|
|
CL C CONC (ABUT)
|
CY
|
26.000
|
$850.000
|
$1,500.000
|
$1,364.350
|
$1,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
20.800
|
$850.000
|
$1,500.000
|
$2,966.690
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
8.400
|
$1,000.000
|
$1,600.000
|
$2,646.300
|
$1,000.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
4,788.000
|
$15.000
|
$20.500
|
$15.730
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
64.200
|
$500.000
|
$500.000
|
$441.710
|
$1,000.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
450.000
|
$125.000
|
$165.000
|
$174.620
|
$185.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
562.500
|
$150.000
|
$155.000
|
$174.620
|
$185.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,035.000
|
$100.000
|
$142.000
|
$149.600
|
$185.000
|
|
|
RAIL (TY T223)
|
LF
|
252.000
|
$110.000
|
$145.000
|
$160.890
|
$180.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
76.000
|
$100.000
|
$75.000
|
$66.340
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
147.000
|
$85.000
|
$85.000
|
$79.390
|
$105.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,200.000
|
$1,250.000
|
$1,244.660
|
$2,550.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$15,000.000
|
$15,000.000
|
$28,400.000
|
$90,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
6.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$164,000.000
|
$80,372.500
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$2,500.000
|
$1,500.000
|
$2,088.600
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
150.000
|
$30.000
|
$36.450
|
$31.930
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
123.000
|
$30.000
|
$39.500
|
$33.990
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
273.000
|
$8.000
|
$9.550
|
$7.210
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
370.000
|
$3.000
|
$4.300
|
$2.830
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
370.000
|
$1.000
|
$1.000
|
$1.030
|
$2.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,140.000
|
$25.000
|
$22.500
|
$84.830
|
$65.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
480.000
|
$10.000
|
$3.500
|
$28.500
|
$20.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
660.000
|
$10.000
|
$15.000
|
$27.000
|
$20.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
281.000
|
$20.000
|
$25.000
|
$23.500
|
$42.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$24.000
|
$24.450
|
$22.090
|
$25.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
4.000
|
$1,400.000
|
$1,950.000
|
$1,594.440
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
750.000
|
$1.000
|
$2.500
|
$1.550
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,300.000
|
$2,945.000
|
$2,827.350
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$100.000
|
$250.000
|
$206.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$3,000.000
|
$1,030.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$500.000
|
$2,000.000
|
$8,345.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,500.000
|
$1,250.000
|
$12,500.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$180.000
|
$850.000
|
$195.190
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
1.000
|
$500.000
|
$500.000
|
$565.660
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$18.000
|
$16.000
|
$13.390
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
2.000
|
$50.000
|
$48.000
|
$40.170
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$15.000
|
$16.000
|
$16.630
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,234.000
|
$0.750
|
$0.850
|
$0.880
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
440.000
|
$1.250
|
$0.850
|
$0.880
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,206.000
|
$0.750
|
$0.850
|
$0.880
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
162.000
|
$1.500
|
$2.000
|
$2.030
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
4,208.000
|
$0.500
|
$0.750
|
$0.770
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
530.000
|
$0.800
|
$0.750
|
$0.770
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
53.000
|
$10.000
|
$10.000
|
$5.150
|
$15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$15,000.000
|
$12,875.000
|
$11,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$5,000.000
|
$5,000.000
|
$1,030.000
|
$12,500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$150.000
|
$750.000
|
$1,287.500
|
$250.000
|
|
Totals: |
$1,286,383.700
|
$1,654,744.260
|
$1,691,902.222
|
$2,459,638.700
|