VICTORIA VARIOUS (0913-27-108)
Items: 68
County: VICTORIA
Length: 0.0000 MILES (0.0073 MILES)
Highway: VARIOUS
District: YOAKUM
Control Number: 0913-27-108
DBE Goal: 0.0%
Project: F 2026(805)
Guaranty: $20,000.00
Time: 159 WORKING DAYS
Engineer's Estimate: $990,520.50
Date: 07/01/2026 1:00 PM CDT (2 months ago)
Contract Number: 7263025
Type: TRAFFIC CONTROL DEVICES
Project ID: A00215421
Contract Type: FEDERAL
Project Description: INSTALL TRAFFIC CAMERA IN VARIOUS LOCATIONS TO ALLOW FOR THE ADJUSTMENT OF TRAFFIC FLOW AND CAPACITY AS NEEDED DURING PEAK AND NON-TRADITIONAL CONGESTION PERIODS, ALLOWING FOR THE EFFICIENT AND SUSTAINABLE, SAFE MOVEMENT OF PEOPLE AND GOODS.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES JANAK
PAUL RODRIGUEZ
VICTORIA VARIOUS (0913-27-108)
Project Name: N/A
Project: F 2026(805)
Engineer's Estimate: $267,592.00
Length: 0.0000 MILES (0.0073 MILES)
Project Class: TRAFFIC CONTROL DEVICES
Limits From: VARIOUS INTERSECTION LOCATIONS
Limits To: ALONG US 77, BU77S, AND US 87
Project Description: INSTALL TRAFFIC CAMERA IN VARIOUS LOCATIONS TO ALLOW FOR THE ADJUSTMENT OF TRAFFIC FLOW AND CAPACITY AS NEEDED DURING PEAK AND NON-TRADITIONAL CONGESTION PERIODS, ALLOWING FOR THE EFFICIENT AND SUSTAINABLE, SAFE MOVEMENT OF PEOPLE AND GOODS.
VICTORIA US 77 (0370-05-057)
Project Name: US 77 INSTALL TRAFFIC SIGNAL 2709
Project: C 370-5-57
Engineer's Estimate: $722,928.50
Length: 0.0000 MILES (0.0073 MILES)
Project Class: TRAFFIC CONTROL DEVICES
Limits From: @ BROADMOOR ST
Limits To: .
Project Description: INSTALL TRAFFIC SIGNAL
Bidders (6)
E
Engineer's Estimate
$990,520.50
1
$817,778.58
Over/Under Est:
-17.44%
-$172,741.92
$913,764.74
Over/Under Est:
-7.75%
-$76,755.76
Amt Left:
11.74%
$95,986.16
3
$995,512.70
Over/Under Est:
0.5%
$4,992.20
Amt Left:
21.73%
$177,734.12
Delta:
-8.95%
-$81,747.96
$1,011,583.53
Over/Under Est:
2.13%
$21,063.03
Amt Left:
23.7%
$193,804.95
Delta:
-1.61%
-$16,070.83
$1,096,651.65
Over/Under Est:
10.71%
$106,131.15
Amt Left:
34.1%
$278,873.07
Delta:
-8.41%
-$85,068.12
$1,122,122.00
Over/Under Est:
13.29%
$131,601.50
Amt Left:
37.22%
$304,343.42
Delta:
-2.32%
-$25,470.35
Bid Items & Bid Tabulations
68
Total
0 of 68
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
| Description | Amount |
|---|---|
| RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) | $4,320.00 |
| EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) | $500.00 |
| SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) | $1,000.00 |
| Total: | $5,820.00 |
