|
|
PREPARING ROW
|
STA
|
623.050
|
$100.000
|
$105.000
|
$200.000
|
$484.000
|
$135.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,599.000
|
$13.890
|
$5.200
|
$20.000
|
$5.000
|
$13.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,159.000
|
$11.160
|
$10.000
|
$15.000
|
$15.000
|
$27.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
623.050
|
$215.000
|
$1.000
|
$75.000
|
$8.000
|
$300.000
|
|
|
BLOCK SODDING
|
SY
|
88,310.000
|
$2.640
|
$0.010
|
$1.050
|
$0.250
|
$3.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
44,155.000
|
$0.200
|
$0.170
|
$0.200
|
$0.200
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
44,155.000
|
$0.120
|
$0.080
|
$0.200
|
$0.100
|
$0.150
|
|
|
FERTILIZER
|
AC
|
27.490
|
$738.000
|
$750.000
|
$600.000
|
$790.000
|
$500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3,298.800
|
$6.040
|
$4.000
|
$3.000
|
$18.000
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
10.000
|
$130.000
|
$460.000
|
$200.000
|
$100.000
|
$425.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
15,434.600
|
$78.000
|
$62.000
|
$78.000
|
$80.000
|
$75.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
101,743.000
|
$3.220
|
$3.000
|
$2.500
|
$2.700
|
$3.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
2,554.000
|
$124.000
|
$125.000
|
$110.000
|
$82.000
|
$115.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
26,917.130
|
$94.000
|
$79.000
|
$87.000
|
$86.000
|
$92.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,738.000
|
$2.630
|
$1.150
|
$0.500
|
$2.800
|
$3.500
|
|
|
PLANE ASPH CONC PAV (1/2")
|
SY
|
227,227.000
|
$0.700
|
$1.150
|
$0.500
|
$1.090
|
$0.850
|
|
|
PLANE ASPH CONC PAV (1/2" TO 2")
|
SY
|
2,595.000
|
$1.250
|
$1.150
|
$0.500
|
$1.900
|
$4.250
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
14.000
|
$10.710
|
$14.000
|
$75.000
|
$20.000
|
$33.000
|
|
|
CEM STABIL BKFL
|
CY
|
42.000
|
$41.330
|
$25.000
|
$90.000
|
$80.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$75.000
|
$315.000
|
$350.000
|
$82.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
32.000
|
$91.000
|
$185.000
|
$360.000
|
$91.000
|
$130.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
16.000
|
$103.000
|
$394.000
|
$450.000
|
$127.000
|
$230.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$1,418.000
|
$1,300.000
|
$1,800.000
|
$1,125.000
|
$1,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,204.000
|
$1,800.000
|
$3,350.000
|
$2,110.000
|
$2,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,708.000
|
$3,000.000
|
$4,700.000
|
$2,950.000
|
$3,250.000
|
|
|
REMOV STR (SET)
|
EA
|
13.000
|
$183.000
|
$263.000
|
$500.000
|
$550.000
|
$225.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$580,000.000
|
$355,000.000
|
$100,000.000
|
$470,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,800.000
|
$9,500.000
|
$3,200.000
|
$750.000
|
$40,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,020.000
|
$29.450
|
$25.000
|
$40.000
|
$26.500
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,020.000
|
$11.580
|
$9.000
|
$10.000
|
$9.500
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
30.000
|
$5.140
|
$5.000
|
$30.000
|
$5.250
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
30.000
|
$1.090
|
$1.000
|
$5.000
|
$1.250
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,580.000
|
$17.180
|
$12.000
|
$21.000
|
$32.750
|
$42.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
116,906.000
|
$0.240
|
$0.150
|
$0.230
|
$0.200
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
53,696.000
|
$0.260
|
$0.140
|
$0.250
|
$0.250
|
$0.150
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
14.000
|
$207.000
|
$295.000
|
$200.000
|
$313.000
|
$125.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$224.000
|
$355.000
|
$250.000
|
$375.000
|
$150.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$484.000
|
$690.000
|
$500.000
|
$727.000
|
$400.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
31.500
|
$28.380
|
$26.000
|
$25.000
|
$25.000
|
$20.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
74.000
|
$530.000
|
$357.000
|
$380.000
|
$376.000
|
$360.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$584.000
|
$484.000
|
$490.000
|
$510.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$605.000
|
$480.000
|
$500.000
|
$505.000
|
$460.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
27.000
|
$360.000
|
$616.000
|
$620.000
|
$650.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
13.000
|
$720.000
|
$714.000
|
$780.000
|
$752.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$773.000
|
$685.000
|
$760.000
|
$722.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
11.000
|
$851.000
|
$840.000
|
$790.000
|
$885.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
76.000
|
$83.000
|
$48.000
|
$65.000
|
$51.000
|
$62.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
12.000
|
$58.000
|
$48.000
|
$75.000
|
$51.000
|
$68.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$32.000
|
$38.000
|
$55.000
|
$40.000
|
$49.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
246,914.000
|
$0.230
|
$0.270
|
$0.180
|
$0.300
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
123,457.000
|
$0.400
|
$0.300
|
$0.250
|
$0.320
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
100.000
|
$0.360
|
$1.000
|
$0.600
|
$1.100
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,402.000
|
$0.550
|
$0.400
|
$0.550
|
$0.420
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
578.000
|
$2.080
|
$2.000
|
$2.500
|
$2.150
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
34.000
|
$51.000
|
$50.000
|
$75.000
|
$53.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
18.000
|
$63.000
|
$60.000
|
$75.000
|
$64.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
13,670.000
|
$0.240
|
$0.300
|
$0.250
|
$0.320
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
34,783.000
|
$0.230
|
$0.280
|
$0.220
|
$0.290
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
13,670.000
|
$0.380
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
34,783.000
|
$0.410
|
$0.300
|
$0.250
|
$0.320
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
72.000
|
$2.970
|
$3.000
|
$2.500
|
$3.200
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
50.000
|
$1.070
|
$2.000
|
$4.000
|
$2.150
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,201.000
|
$0.950
|
$0.800
|
$1.750
|
$0.850
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
289.000
|
$5.970
|
$6.000
|
$8.000
|
$6.350
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
17.000
|
$128.000
|
$130.000
|
$150.000
|
$137.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
9.000
|
$177.000
|
$150.000
|
$165.000
|
$160.000
|
$165.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
36.000
|
$5.410
|
$10.000
|
$8.000
|
$10.500
|
$8.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
123,457.000
|
$0.410
|
$0.400
|
$0.500
|
$0.430
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
13,670.000
|
$0.420
|
$0.400
|
$0.700
|
$0.430
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
34,783.000
|
$0.400
|
$0.400
|
$0.650
|
$0.430
|
$0.650
|
|
REFL PAV MRKR TY I-C
|
EA
|
60.000
|
$4.800
|
$4.000
|
$8.000
|
$4.250
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,664.000
|
$4.700
|
$4.000
|
$5.000
|
$4.250
|
$5.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
10.000
|
$2,000.000
|
$1,922.000
|
$2,100.000
|
$1,425.000
|
$2,500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$1,433.000
|
$2,045.000
|
$1,200.000
|
$7,900.000
|
$3,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$1,433.000
|
$3,040.000
|
$500.000
|
$2,700.000
|
$3,000.000
|
|
|
LED CHEVRON
|
EA
|
1.000
|
$4,500.000
|
$17,281.250
|
$19,000.000
|
$4,000.000
|
$4,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
17.000
|
$215.000
|
$260.000
|
$350.000
|
$325.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
360.000
|
$135.000
|
$600.000
|
$25.000
|
$20.000
|
$100.000
|
|
Totals: |
$6,346,545.842
|
$5,288,985.330
|
$5,387,277.720
|
$5,843,746.020
|
$6,398,368.560
|