EXCAVATION (ROADWAY)
|
CY
|
177.000
|
$6.910
|
$40.000
|
$10.000
|
$70.000
|
$180.000
|
$39.000
|
$67.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
177.000
|
$7.190
|
$40.000
|
$10.000
|
$48.000
|
$180.000
|
$83.000
|
$67.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
437.680
|
$164.380
|
$100.000
|
$93.000
|
$210.000
|
$180.000
|
$107.350
|
$149.000
|
|
|
BLOCK SODDING
|
SY
|
1,595.000
|
$2.960
|
$4.500
|
$5.000
|
$4.000
|
$5.000
|
$5.430
|
$5.500
|
|
|
STRAW OR HAY MULCH
|
SY
|
38.000
|
$0.190
|
$10.000
|
$10.000
|
$6.000
|
$10.000
|
$11.000
|
$11.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
24.000
|
$0.100
|
$5.000
|
$10.000
|
$5.000
|
$10.000
|
$11.000
|
$11.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
14.000
|
$0.090
|
$5.000
|
$75.000
|
$2.000
|
$75.000
|
$82.000
|
$85.500
|
|
|
FERTILIZER
|
AC
|
0.420
|
$553.730
|
$1,200.000
|
$1,200.000
|
$100.000
|
$1,200.000
|
$1,303.000
|
$1,367.000
|
|
|
VEGETATIVE WATERING
|
MG
|
50.400
|
$18.670
|
$40.000
|
$46.000
|
$30.000
|
$20.000
|
$60.000
|
$281.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
30.000
|
$79.670
|
$150.000
|
$161.000
|
$266.000
|
$305.000
|
$173.000
|
$438.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
251.360
|
$83.730
|
$100.000
|
$130.000
|
$128.000
|
$140.000
|
$235.000
|
$164.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
34,869.000
|
$2.990
|
$3.450
|
$3.600
|
$3.600
|
$3.800
|
$3.790
|
$3.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
895.000
|
$124.240
|
$130.000
|
$137.000
|
$200.000
|
$144.000
|
$214.000
|
$175.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
484.020
|
$110.000
|
$155.000
|
$138.500
|
$150.000
|
$160.000
|
$153.000
|
$170.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
6,961.380
|
$128.190
|
$155.000
|
$138.500
|
$150.000
|
$160.000
|
$153.000
|
$170.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
10,800.000
|
$42.000
|
$10.000
|
$35.000
|
$33.000
|
$36.000
|
$38.460
|
$82.500
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
78,054.000
|
$1.070
|
$2.000
|
$1.550
|
$1.300
|
$1.150
|
$1.000
|
$2.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
107,698.000
|
$2.150
|
$2.500
|
$1.800
|
$1.400
|
$1.450
|
$1.000
|
$3.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
91.000
|
$482.330
|
$750.000
|
$438.000
|
$600.000
|
$625.000
|
$600.000
|
$510.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$322,000.000
|
$125,000.000
|
$203,000.000
|
$110,000.000
|
$100,000.000
|
$180,000.001
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$16,000.000
|
$4,000.000
|
$16,500.000
|
$3,000.000
|
$2,500.000
|
$16,000.000
|
$28,535.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
74,371.000
|
$0.140
|
$0.250
|
$0.210
|
$0.100
|
$0.200
|
$0.100
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
43,361.000
|
$0.140
|
$0.250
|
$0.260
|
$0.100
|
$0.200
|
$0.130
|
$0.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,500.000
|
$24.730
|
$25.000
|
$22.180
|
$24.000
|
$28.650
|
$24.100
|
$28.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,872.800
|
$2,200.000
|
$1,859.000
|
$1,900.000
|
$1,950.000
|
$2,020.000
|
$2,449.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,500.000
|
$2.330
|
$2.000
|
$1.900
|
$2.000
|
$0.950
|
$2.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$2,981.980
|
$3,500.000
|
$3,042.000
|
$3,200.000
|
$3,250.000
|
$3,305.000
|
$3,531.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$196.990
|
$300.000
|
$261.000
|
$276.000
|
$275.000
|
$284.000
|
$171.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
40.000
|
$216.920
|
$250.000
|
$212.000
|
$225.000
|
$230.000
|
$230.000
|
$290.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
5.000
|
$218.750
|
$300.000
|
$228.000
|
$242.000
|
$320.000
|
$248.000
|
$370.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
11.000
|
$496.670
|
$700.000
|
$581.000
|
$616.000
|
$772.000
|
$631.000
|
$786.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
9.000
|
$22.900
|
$26.000
|
$23.210
|
$25.000
|
$20.000
|
$26.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
136.000
|
$409.630
|
$500.000
|
$440.000
|
$466.000
|
$475.000
|
$478.000
|
$484.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$597.600
|
$600.000
|
$547.000
|
$580.000
|
$600.000
|
$594.000
|
$621.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$649.370
|
$1,100.000
|
$998.000
|
$1,058.000
|
$1,100.000
|
$1,084.000
|
$1,128.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
19.000
|
$715.780
|
$900.000
|
$817.000
|
$866.000
|
$925.000
|
$888.000
|
$917.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
11.000
|
$753.080
|
$1,100.000
|
$991.000
|
$1,050.000
|
$1,112.000
|
$1,077.000
|
$1,185.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$979.430
|
$950.000
|
$873.000
|
$925.000
|
$1,150.000
|
$949.000
|
$1,156.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
184.000
|
$59.330
|
$50.000
|
$42.000
|
$44.000
|
$52.000
|
$46.000
|
$62.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
35.000
|
$40.060
|
$35.000
|
$30.000
|
$31.000
|
$30.000
|
$33.000
|
$28.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
6.000
|
$26.320
|
$25.000
|
$20.000
|
$21.000
|
$30.000
|
$22.000
|
$27.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
28.000
|
$55.240
|
$70.000
|
$60.000
|
$63.000
|
$65.000
|
$65.000
|
$74.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
38.000
|
$74.180
|
$90.000
|
$80.000
|
$63.000
|
$75.000
|
$87.000
|
$68.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
91,408.000
|
$0.230
|
$0.280
|
$0.260
|
$0.260
|
$0.260
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
91,408.000
|
$0.240
|
$0.280
|
$0.260
|
$0.260
|
$0.260
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
788.000
|
$0.360
|
$0.500
|
$0.420
|
$0.420
|
$0.420
|
$0.460
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
96.000
|
$0.860
|
$2.000
|
$1.500
|
$1.500
|
$1.500
|
$1.630
|
$1.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
386.000
|
$1.810
|
$3.500
|
$3.000
|
$3.000
|
$3.000
|
$3.260
|
$3.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
6.000
|
$47.100
|
$60.000
|
$55.000
|
$55.000
|
$55.000
|
$60.000
|
$62.500
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
6.000
|
$50.040
|
$60.000
|
$55.000
|
$55.000
|
$55.000
|
$60.000
|
$62.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
8,645.000
|
$0.250
|
$0.280
|
$0.260
|
$0.260
|
$0.450
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
42,941.000
|
$0.240
|
$0.280
|
$0.260
|
$0.260
|
$0.260
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
8,645.000
|
$0.240
|
$0.280
|
$0.260
|
$0.260
|
$0.260
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
42,941.000
|
$0.250
|
$0.280
|
$0.260
|
$0.260
|
$0.260
|
$0.280
|
$0.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
394.000
|
$0.810
|
$1.000
|
$0.800
|
$1.060
|
$0.800
|
$0.870
|
$0.900
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
48.000
|
$2.370
|
$4.000
|
$3.500
|
$3.700
|
$3.500
|
$3.800
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
193.000
|
$4.940
|
$8.000
|
$7.000
|
$7.000
|
$7.000
|
$7.600
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
3.000
|
$70.400
|
$130.000
|
$125.000
|
$125.000
|
$125.000
|
$136.000
|
$142.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
3.000
|
$77.630
|
$150.000
|
$135.000
|
$135.000
|
$135.000
|
$147.000
|
$154.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
91,408.000
|
$0.460
|
$0.500
|
$0.490
|
$0.490
|
$0.490
|
$0.530
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
8,645.000
|
$0.440
|
$0.500
|
$0.490
|
$0.490
|
$0.450
|
$0.530
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
42,941.000
|
$0.510
|
$0.500
|
$0.490
|
$0.490
|
$0.490
|
$0.530
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
46.000
|
$4.280
|
$4.000
|
$4.000
|
$4.250
|
$4.000
|
$4.350
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,042.000
|
$4.190
|
$4.000
|
$4.000
|
$4.250
|
$4.000
|
$4.350
|
$4.500
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$295.060
|
$1,000.000
|
$750.000
|
$780.000
|
$750.000
|
$815.000
|
$854.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
6,440.530
|
$110.000
|
$130.000
|
$105.000
|
$125.000
|
$113.000
|
$125.500
|
$125.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
312.990
|
$100.000
|
$180.000
|
$157.000
|
$210.000
|
$110.000
|
$146.000
|
$293.000
|
|
|
TACK COAT
|
GAL
|
8,592.000
|
$2.590
|
$2.000
|
$2.300
|
$3.000
|
$3.500
|
$3.150
|
$3.500
|
|
|
TMA (STATIONARY)
|
DAY
|
22.000
|
$281.400
|
$400.000
|
$298.000
|
$130.000
|
$75.000
|
$500.000
|
$294.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
154.000
|
$423.880
|
$50.000
|
$648.000
|
$15.000
|
$75.000
|
$800.000
|
$28.500
|
|
|
LEAD LED CHEVRON
|
EA
|
1.000
|
$4,500.000
|
$9,500.000
|
$8,500.000
|
$9,500.000
|
$8,500.000
|
$9,300.000
|
$9,683.000
|
|
Totals: |
$3,687,425.398
|
$3,607,335.290
|
$3,646,425.280
|
$3,673,910.170
|
$3,687,199.240
|
$3,961,606.814
|
$4,799,103.620
|