|
|
EXCAVATION (ROADWAY)
|
CY
|
409.000
|
$25.000
|
$70.000
|
$177.000
|
$80.000
|
$100.000
|
$165.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
93.000
|
$21.000
|
$200.000
|
$75.000
|
$130.000
|
$200.000
|
$228.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
361.980
|
$245.000
|
$175.000
|
$214.000
|
$245.000
|
$300.000
|
$244.000
|
|
|
BLOCK SODDING
|
SY
|
928.000
|
$4.750
|
$10.000
|
$9.000
|
$7.000
|
$8.000
|
$7.400
|
|
|
STRAW OR HAY MULCH
|
SY
|
200.000
|
$0.700
|
$5.000
|
$2.000
|
$1.000
|
$2.000
|
$1.050
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
14.000
|
$0.500
|
$50.000
|
$11.000
|
$3.000
|
$10.000
|
$3.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
186.000
|
$0.450
|
$10.000
|
$11.000
|
$2.000
|
$10.000
|
$2.100
|
|
|
FERTILIZER
|
AC
|
0.330
|
$1,040.000
|
$875.000
|
$1,300.000
|
$1,500.000
|
$1,200.000
|
$1,580.000
|
|
|
VEGETATIVE WATERING
|
MG
|
39.600
|
$35.000
|
$110.000
|
$157.000
|
$125.000
|
$100.000
|
$167.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
44.000
|
$200.000
|
$175.000
|
$158.000
|
$425.000
|
$195.000
|
$685.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
817.930
|
$135.000
|
$125.000
|
$194.000
|
$195.000
|
$290.000
|
$160.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
48,246.000
|
$5.250
|
$3.800
|
$2.750
|
$3.400
|
$3.900
|
$4.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
1,190.000
|
$250.000
|
$165.000
|
$125.000
|
$190.000
|
$175.000
|
$355.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,000.000
|
$75.000
|
$54.000
|
$54.000
|
$45.000
|
$65.000
|
$112.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
141,606.000
|
$2.000
|
$2.500
|
$2.000
|
$1.900
|
$1.100
|
$3.050
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
1.340
|
$3,000.000
|
$8,000.000
|
$12,000.000
|
$7,500.000
|
$500.000
|
$9,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
71.000
|
$500.000
|
$975.000
|
$1,100.000
|
$1,200.000
|
$1,200.000
|
$1,300.000
|
|
|
RAIL (TY T631)
|
LF
|
256.130
|
$105.000
|
$80.000
|
$88.000
|
$70.200
|
$130.000
|
$75.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
150.000
|
$250.000
|
$230.000
|
$335.000
|
$201.800
|
$300.000
|
$213.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
370.000
|
$20.000
|
$7.000
|
$19.000
|
$4.750
|
$3.000
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$200,000.000
|
$68,000.000
|
$270,000.000
|
$350,000.000
|
$215,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$3,000.000
|
$5,000.000
|
$1,860.000
|
$14,500.000
|
$4,000.000
|
$21,000.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$5,000.000
|
$5,500.000
|
$5,250.000
|
$5,000.000
|
$10,500.000
|
$15,000.000
|
|
|
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
|
LF
|
270.000
|
$10.000
|
$145.000
|
$23.000
|
$55.000
|
$120.000
|
$190.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
80,075.000
|
$0.430
|
$0.150
|
$0.100
|
$0.700
|
$0.150
|
$0.140
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
35,958.000
|
$0.270
|
$0.150
|
$0.100
|
$0.760
|
$0.150
|
$0.140
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,562.500
|
$30.000
|
$26.000
|
$23.000
|
$22.700
|
$33.250
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
22.000
|
$2,100.000
|
$2,500.000
|
$2,150.000
|
$1,885.000
|
$1,800.000
|
$1,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,510.000
|
$1,600.000
|
$1,700.000
|
$1,450.000
|
$1,300.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,793.500
|
$4.000
|
$3.000
|
$2.000
|
$2.000
|
$12.500
|
$2.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$270.000
|
$270.000
|
$214.000
|
$230.000
|
$200.000
|
$243.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
18.000
|
$250.000
|
$250.000
|
$160.000
|
$180.000
|
$200.000
|
$190.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
31.000
|
$3,225.000
|
$3,400.000
|
$3,160.000
|
$3,085.000
|
$2,950.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
27.000
|
$265.000
|
$275.000
|
$214.000
|
$230.000
|
$200.000
|
$244.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
23.000
|
$310.000
|
$290.000
|
$250.000
|
$232.500
|
$200.000
|
$246.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
7.000
|
$375.000
|
$320.000
|
$290.000
|
$272.500
|
$240.000
|
$288.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
6.000
|
$670.000
|
$370.000
|
$335.000
|
$312.500
|
$575.000
|
$330.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
18.000
|
$18.000
|
$30.000
|
$25.000
|
$23.000
|
$30.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
49.000
|
$650.000
|
$550.000
|
$509.000
|
$475.600
|
$575.000
|
$503.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$780.000
|
$700.000
|
$640.000
|
$595.500
|
$700.000
|
$530.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$665.000
|
$770.000
|
$660.000
|
$616.350
|
$725.000
|
$652.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
16.000
|
$1,100.000
|
$900.000
|
$825.000
|
$768.230
|
$850.000
|
$813.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$975.000
|
$1,200.000
|
$1,100.000
|
$1,013.800
|
$925.000
|
$1,080.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,080.000
|
$1,100.000
|
$1,050.000
|
$961.310
|
$950.000
|
$1,018.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
3.000
|
$1,185.000
|
$950.000
|
$890.000
|
$824.140
|
$1,000.000
|
$873.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
90.000
|
$92.500
|
$75.000
|
$59.000
|
$55.000
|
$75.000
|
$58.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
51.000
|
$48.000
|
$90.000
|
$80.000
|
$75.000
|
$45.000
|
$172.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
47.000
|
$25.000
|
$20.000
|
$12.000
|
$11.000
|
$20.000
|
$12.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
28.000
|
$78.000
|
$100.000
|
$91.000
|
$85.000
|
$55.000
|
$160.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
121.000
|
$39.000
|
$18.750
|
$16.000
|
$15.000
|
$25.000
|
$64.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
77,764.000
|
$0.350
|
$0.300
|
$0.300
|
$0.300
|
$0.270
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
85,930.000
|
$0.500
|
$0.350
|
$0.300
|
$0.400
|
$0.300
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
938.000
|
$0.680
|
$0.600
|
$0.500
|
$1.000
|
$0.600
|
$0.900
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
31.000
|
$2.500
|
$1.500
|
$2.000
|
$2.000
|
$1.500
|
$3.700
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
801.000
|
$3.000
|
$3.000
|
$3.000
|
$4.000
|
$3.000
|
$4.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
1.000
|
$64.000
|
$85.000
|
$86.000
|
$95.000
|
$85.000
|
$133.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(RR XING)
|
EA
|
1.000
|
$78.000
|
$250.000
|
$300.000
|
$250.000
|
$250.000
|
$396.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
1.000
|
$78.000
|
$100.000
|
$86.000
|
$95.000
|
$100.000
|
$154.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,750.000
|
$0.350
|
$0.300
|
$0.300
|
$0.400
|
$0.270
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
32,598.000
|
$0.350
|
$0.300
|
$0.300
|
$0.320
|
$0.270
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
7,420.000
|
$0.500
|
$0.350
|
$0.300
|
$0.500
|
$0.300
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
37,177.000
|
$0.500
|
$0.350
|
$0.300
|
$0.420
|
$0.300
|
$0.320
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
503.000
|
$1.900
|
$0.900
|
$1.500
|
$1.550
|
$0.900
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
31.000
|
$4.700
|
$3.000
|
$7.500
|
$4.000
|
$3.000
|
$4.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
645.000
|
$8.000
|
$6.000
|
$11.000
|
$8.500
|
$6.000
|
$8.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
1.000
|
$210.000
|
$165.000
|
$190.000
|
$200.000
|
$165.000
|
$280.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$205.000
|
$200.000
|
$190.000
|
$550.000
|
$200.000
|
$313.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$417.000
|
$500.000
|
$450.000
|
$200.000
|
$500.000
|
$524.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
85,930.000
|
$1.100
|
$0.600
|
$0.600
|
$0.650
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,420.000
|
$0.750
|
$0.600
|
$0.600
|
$0.800
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
37,177.000
|
$0.880
|
$0.600
|
$0.600
|
$0.680
|
$0.600
|
$0.600
|
|
REFL PAV MRKR TY I-C
|
EA
|
10.000
|
$6.580
|
$6.000
|
$7.000
|
$4.500
|
$6.000
|
$5.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
834.000
|
$6.880
|
$6.000
|
$7.000
|
$4.500
|
$6.000
|
$5.800
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
13,574.490
|
$129.000
|
$142.000
|
$161.000
|
$130.000
|
$135.000
|
$150.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
23.830
|
$205.000
|
$200.000
|
$700.000
|
$525.000
|
$420.000
|
$403.000
|
|
|
TMA (STATIONARY)
|
DAY
|
87.000
|
$165.000
|
$50.000
|
$89.000
|
$215.000
|
$180.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
160.000
|
$400.000
|
$50.000
|
$205.000
|
$400.000
|
$180.000
|
$150.000
|
|
|
LEAD LED CHEVRON
|
EA
|
1.000
|
$4,000.000
|
$6,500.000
|
$4,800.000
|
$5,025.000
|
$4,500.000
|
$6,500.000
|
|
|
LED CHEVRON
|
EA
|
11.000
|
$2,650.000
|
$5,500.000
|
$4,300.000
|
$8,985.000
|
$4,000.000
|
$5,300.000
|
|
Totals: |
$4,339,194.890
|
$4,087,471.730
|
$4,110,723.870
|
$4,168,872.926
|
$4,210,289.715
|
$4,983,973.595
|