PREPARING ROW
|
STA
|
31.500
|
$1,500.000
|
$2,000.000
|
$863.000
|
$1,500.000
|
$5,000.000
|
$541.430
|
$5,200.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
228.000
|
$10.000
|
$15.000
|
$9.800
|
$10.000
|
$22.000
|
$42.150
|
$9.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
110.000
|
$10.000
|
$15.000
|
$17.300
|
$10.000
|
$20.000
|
$79.910
|
$13.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,198.000
|
$3.000
|
$7.000
|
$9.100
|
$2.000
|
$3.000
|
$22.440
|
$5.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
86.000
|
$7.250
|
$7.000
|
$9.100
|
$10.000
|
$13.000
|
$22.340
|
$7.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
121.000
|
$15.000
|
$15.000
|
$32.300
|
$10.000
|
$13.000
|
$56.500
|
$9.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
639.000
|
$10.000
|
$15.000
|
$17.700
|
$5.000
|
$8.000
|
$41.000
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-11")
|
SY
|
2,446.000
|
$4.000
|
$5.000
|
$5.100
|
$3.000
|
$35.000
|
$25.870
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
829.000
|
$14.000
|
$15.000
|
$25.300
|
$50.000
|
$35.000
|
$39.240
|
$100.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
80.000
|
$15.000
|
$6.000
|
$32.100
|
$50.000
|
$35.000
|
$90.040
|
$50.000
|
|
|
BLOCK SODDING
|
SY
|
1,554.000
|
$4.000
|
$5.000
|
$8.600
|
$5.000
|
$7.000
|
$8.460
|
$6.000
|
|
|
FERTILIZER
|
AC
|
0.350
|
$2,000.000
|
$1,500.000
|
$2,200.000
|
$1,500.000
|
$1,700.000
|
$2,154.760
|
$800.000
|
|
|
VEGETATIVE WATERING
|
MG
|
45.000
|
$100.000
|
$33.000
|
$140.000
|
$95.000
|
$100.000
|
$137.350
|
$80.000
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$50,000.000
|
$40,000.000
|
$55,000.000
|
$40,000.000
|
$65,000.000
|
$55,229.000
|
$175,000.000
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
567.000
|
$11.000
|
$14.040
|
$18.600
|
$12.000
|
$15.000
|
$18.190
|
$6.000
|
|
|
PLANT MATERIAL (3-GAL)
|
EA
|
239.000
|
$15.000
|
$22.000
|
$32.300
|
$22.000
|
$27.000
|
$31.680
|
$20.000
|
|
|
PLANT MATERIAL (15-GAL)
|
EA
|
25.000
|
$130.000
|
$153.000
|
$225.000
|
$153.000
|
$192.000
|
$220.640
|
$120.000
|
|
|
MULCH
|
CY
|
20.000
|
$30.000
|
$55.000
|
$81.000
|
$55.000
|
$70.000
|
$79.210
|
$40.000
|
|
|
PLANT SOIL MIX
|
CY
|
154.100
|
$40.000
|
$70.000
|
$104.000
|
$70.000
|
$88.000
|
$101.670
|
$50.000
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
36.000
|
$250.000
|
$274.000
|
$404.000
|
$274.000
|
$340.000
|
$395.640
|
$250.000
|
|
|
PLANT MATERIAL (45 GAL) (TREE)
|
EA
|
8.000
|
$350.000
|
$142.000
|
$209.000
|
$142.000
|
$178.000
|
$204.620
|
$300.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
532.000
|
$50.000
|
$19.000
|
$54.000
|
$40.000
|
$37.000
|
$81.920
|
$25.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
85.200
|
$175.000
|
$300.000
|
$289.000
|
$200.000
|
$230.000
|
$156.860
|
$250.000
|
|
|
CL A CONC (FLUME)
|
CY
|
33.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
$1,600.000
|
$610.000
|
$350.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
3.000
|
$850.000
|
$3,200.000
|
$1,730.000
|
$1,300.000
|
$1,400.000
|
$2,535.820
|
$350.000
|
|
|
CL A CONC (STEPS)
|
CY
|
24.000
|
$800.000
|
$1,000.000
|
$1,260.000
|
$1,100.000
|
$1,400.000
|
$637.400
|
$600.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
804.000
|
$75.000
|
$80.000
|
$79.000
|
$100.000
|
$75.000
|
$150.780
|
$75.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,253.000
|
$10.000
|
$19.000
|
$12.200
|
$12.000
|
$15.000
|
$8.910
|
$12.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
168.000
|
$100.000
|
$200.000
|
$117.000
|
$120.000
|
$160.000
|
$226.170
|
$85.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
91.000
|
$100.000
|
$200.000
|
$145.000
|
$150.000
|
$155.000
|
$205.610
|
$105.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
63.000
|
$100.000
|
$60.000
|
$142.000
|
$200.000
|
$94.000
|
$194.020
|
$65.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
2.000
|
$3,000.000
|
$1,200.000
|
$5,730.000
|
$5,000.000
|
$4,000.000
|
$3,561.000
|
$3,300.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
1.000
|
$4,000.000
|
$1,200.000
|
$7,690.000
|
$5,500.000
|
$4,100.000
|
$5,209.000
|
$3,200.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
1.000
|
$4,000.000
|
$5,000.000
|
$6,850.000
|
$5,000.000
|
$4,000.000
|
$6,803.000
|
$3,400.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$6.000
|
$1,220.000
|
$400.000
|
$1,000.000
|
$2,324.000
|
$425.000
|
|
|
REMOV STR (PIPE)
|
LF
|
33.000
|
$30.000
|
$7.000
|
$27.500
|
$10.000
|
$40.000
|
$101.400
|
$15.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
111.000
|
$10.000
|
$18.000
|
$21.000
|
$5.000
|
$14.000
|
$7.550
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$120,000.000
|
$130,000.000
|
$148,000.000
|
$155,000.000
|
$164,000.000
|
$113,268.000
|
$165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$6,000.000
|
$7,700.000
|
$8,000.000
|
$2,500.000
|
$1,782.000
|
$7,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
220.000
|
$30.000
|
$35.000
|
$39.600
|
$15.000
|
$20.000
|
$34.270
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
220.000
|
$10.000
|
$16.000
|
$12.100
|
$2.000
|
$9.000
|
$20.560
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
375.000
|
$3.500
|
$2.640
|
$6.200
|
$3.000
|
$5.000
|
$3.430
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
375.000
|
$1.000
|
$1.000
|
$1.750
|
$0.500
|
$1.100
|
$1.710
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
355.000
|
$8.000
|
$8.000
|
$10.200
|
$11.000
|
$5.400
|
$9.910
|
$4.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
355.000
|
$1.000
|
$3.000
|
$1.450
|
$2.000
|
$1.250
|
$1.370
|
$1.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
278.000
|
$60.000
|
$55.000
|
$101.000
|
$150.000
|
$150.000
|
$101.780
|
$70.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,223.000
|
$25.000
|
$20.000
|
$27.300
|
$55.000
|
$22.000
|
$22.270
|
$22.000
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
359.000
|
$50.000
|
$6.300
|
$41.100
|
$55.000
|
$22.000
|
$40.440
|
$23.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
327.000
|
$80.000
|
$85.000
|
$95.000
|
$125.000
|
$120.000
|
$106.920
|
$60.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
2,753.000
|
$70.000
|
$60.000
|
$70.000
|
$110.000
|
$72.000
|
$98.010
|
$47.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
7.000
|
$2,500.000
|
$1,400.000
|
$1,870.000
|
$2,500.000
|
$3,000.000
|
$1,576.320
|
$1,200.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,500.000
|
$1,400.000
|
$2,060.000
|
$6,000.000
|
$3,000.000
|
$2,261.680
|
$1,350.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$2,500.000
|
$1,500.000
|
$1,960.000
|
$3,000.000
|
$3,000.000
|
$2,124.600
|
$850.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
17.000
|
$2,000.000
|
$1,500.000
|
$1,880.000
|
$3,000.000
|
$3,000.000
|
$1,850.460
|
$1,450.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$2,000.000
|
$1,400.000
|
$1,870.000
|
$1,600.000
|
$3,000.000
|
$1,713.390
|
$1,800.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
791.000
|
$10.000
|
$27.860
|
$14.500
|
$25.000
|
$30.000
|
$34.270
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
96.000
|
$20.000
|
$40.670
|
$24.900
|
$37.000
|
$46.000
|
$50.030
|
$30.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
930.000
|
$2.000
|
$2.510
|
$3.120
|
$2.000
|
$2.500
|
$3.080
|
$1.500
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
1,860.000
|
$2.000
|
$2.790
|
$2.430
|
$3.000
|
$2.500
|
$3.430
|
$1.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
60.000
|
$2.000
|
$3.900
|
$1.900
|
$3.000
|
$2.500
|
$4.800
|
$2.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$1,200.000
|
$1,560.000
|
$1,320.000
|
$1,400.000
|
$1,700.000
|
$1,919.000
|
$1,800.000
|
|
|
ELC SRV TY D 120/240 060(NS)AL(E)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$9,471.430
|
$8,100.000
|
$8,500.000
|
$10,000.000
|
$11,651.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$600.000
|
$405.600
|
$663.000
|
$364.000
|
$460.000
|
$673.000
|
$364.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
7.000
|
$600.000
|
$355.460
|
$635.000
|
$319.000
|
$400.000
|
$918.400
|
$319.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
18.000
|
$150.000
|
$50.140
|
$150.000
|
$45.000
|
$60.000
|
$111.000
|
$45.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,553.000
|
$1.000
|
$0.850
|
$2.400
|
$1.000
|
$0.850
|
$1.850
|
$0.760
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
693.000
|
$3.000
|
$2.340
|
$5.600
|
$2.000
|
$2.350
|
$5.070
|
$2.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
126.000
|
$10.000
|
$4.400
|
$10.500
|
$4.000
|
$4.400
|
$8.700
|
$3.950
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
6.000
|
$300.000
|
$195.000
|
$323.000
|
$175.000
|
$200.000
|
$329.000
|
$175.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
4,543.000
|
$0.200
|
$0.120
|
$0.230
|
$0.100
|
$0.120
|
$0.300
|
$0.110
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,553.000
|
$0.500
|
$0.160
|
$0.450
|
$0.150
|
$0.150
|
$0.620
|
$0.140
|
|
|
PAVEMENT SEALER 12"
|
LF
|
693.000
|
$0.800
|
$0.220
|
$0.900
|
$0.200
|
$0.250
|
$1.450
|
$0.200
|
|
|
PAVEMENT SEALER 24"
|
LF
|
126.000
|
$3.500
|
$0.330
|
$1.800
|
$0.300
|
$0.350
|
$3.520
|
$0.300
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
6.000
|
$150.000
|
$16.720
|
$37.500
|
$15.000
|
$16.800
|
$69.910
|
$15.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,441.000
|
$0.350
|
$0.530
|
$1.050
|
$0.500
|
$0.550
|
$0.560
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,102.000
|
$0.350
|
$0.530
|
$1.050
|
$0.500
|
$0.550
|
$0.530
|
$0.480
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,414.000
|
$0.500
|
$0.220
|
$0.780
|
$0.200
|
$0.250
|
$0.690
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
20.000
|
$5.000
|
$1.110
|
$7.500
|
$1.000
|
$1.100
|
$2.740
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
2.000
|
$75.000
|
$44.570
|
$68.000
|
$40.000
|
$45.000
|
$54.830
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,543.000
|
$0.100
|
$0.110
|
$0.160
|
$0.100
|
$0.130
|
$0.140
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,553.000
|
$0.300
|
$0.110
|
$0.160
|
$0.100
|
$0.130
|
$0.150
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
693.000
|
$0.500
|
$0.110
|
$0.160
|
$0.100
|
$0.130
|
$1.820
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
126.000
|
$1.000
|
$0.220
|
$0.320
|
$0.200
|
$0.250
|
$2.740
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
6.000
|
$10.000
|
$16.720
|
$24.000
|
$15.000
|
$17.000
|
$27.410
|
$15.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
25.000
|
$3,000.000
|
$1,520.000
|
$900.000
|
$2,500.000
|
$3,000.000
|
$4,273.880
|
$10,000.000
|
|
|
LANDSCAPE AMENITY (TY 2)
|
EA
|
643.000
|
$100.000
|
$20.000
|
$45.000
|
$9.000
|
$20.000
|
$29.290
|
$150.000
|
|
|
LANDSCAPE AMENITY (TY 3)
|
EA
|
16.000
|
$3,000.000
|
$6,300.000
|
$900.000
|
$5,000.000
|
$7,000.000
|
$7,353.900
|
$3,500.000
|
|
|
TREE PROTECTION
|
EA
|
21.000
|
$100.000
|
$300.000
|
$450.000
|
$600.000
|
$200.000
|
$274.140
|
$200.000
|
|
|
WHEEL STOPS
|
EA
|
29.000
|
$150.000
|
$90.000
|
$135.000
|
$85.000
|
$110.000
|
$130.220
|
$85.000
|
|
Totals: |
$1,266,594.250
|
$1,240,388.540
|
$1,330,185.770
|
$1,634,337.550
|
$1,641,878.530
|
$1,666,672.900
|
$1,693,301.120
|