|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
237,675.000
|
$3.000
|
$5.180
|
$4.130
|
$6.000
|
$2.210
|
$3.700
|
|
|
BACKFILL (TY B)
|
STA
|
1,580.000
|
$110.000
|
$115.000
|
$59.720
|
$300.000
|
$152.400
|
$110.000
|
|
|
BLADING
|
HR
|
100.000
|
$150.000
|
$375.000
|
$148.740
|
$225.000
|
$211.430
|
$120.000
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$80.000
|
$125.000
|
$101.710
|
$96.000
|
$170.390
|
$60.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
237,675.000
|
$0.600
|
$0.320
|
$1.030
|
$2.000
|
$0.260
|
$1.310
|
|
|
PRIME COAT (AE-P)
|
GAL
|
47,546.000
|
$3.500
|
$4.000
|
$5.250
|
$4.600
|
$3.930
|
$3.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(SS-1H)
|
GAL
|
70,577.000
|
$2.500
|
$3.500
|
$3.540
|
$3.700
|
$3.650
|
$3.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
212,053.000
|
$3.000
|
$3.350
|
$3.350
|
$3.750
|
$3.780
|
$3.700
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
4,845.000
|
$130.000
|
$87.000
|
$99.440
|
$80.000
|
$100.760
|
$120.000
|
|
|
SUPERPAVE MIXTURES SP-B PG70-22
|
TON
|
105,810.000
|
$80.000
|
$75.750
|
$77.000
|
$81.000
|
$87.000
|
$94.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
84,567.000
|
$120.000
|
$105.000
|
$118.000
|
$99.640
|
$116.000
|
$118.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
20,000.000
|
$20.000
|
$23.850
|
$31.390
|
$27.000
|
$35.720
|
$22.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
11,609.000
|
$1.200
|
$6.310
|
$3.080
|
$1.000
|
$2.280
|
$0.860
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
5,840.000
|
$1.700
|
$8.050
|
$3.630
|
$1.500
|
$4.910
|
$1.250
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,980.000
|
$1.300
|
$5.690
|
$2.320
|
$1.500
|
$1.720
|
$1.350
|
|
|
PLANE ASPH CONC PAV (0" TO 3 1/2")
|
SY
|
6,756.000
|
$1.400
|
$5.920
|
$2.100
|
$1.400
|
$4.790
|
$1.550
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
1,020.000
|
$2.000
|
$22.470
|
$13.610
|
$4.000
|
$5.880
|
$4.300
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
1,438.000
|
$1.500
|
$30.510
|
$9.540
|
$2.600
|
$5.630
|
$3.350
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
70.000
|
$120.000
|
$148.500
|
$148.500
|
$161.000
|
$152.140
|
$135.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
84.000
|
$155.000
|
$181.500
|
$181.500
|
$200.000
|
$185.950
|
$165.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
420.000
|
$465.000
|
$797.500
|
$797.500
|
$860.000
|
$817.060
|
$487.500
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
104.000
|
$380.000
|
$690.800
|
$517.000
|
$453.000
|
$467.690
|
$415.000
|
|
|
JOINT SEALANT
|
LF
|
608.000
|
$15.000
|
$11.000
|
$11.550
|
$15.000
|
$20.000
|
$17.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,603,884.710
|
$800,000.000
|
$496,381.440
|
$2,621,000.000
|
$2,575,073.450
|
$2,635,278.020
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$15,000.000
|
$10,000.000
|
$5,000.000
|
$22,000.000
|
$10,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,000.000
|
$5.000
|
$5.470
|
$5.390
|
$7.000
|
$6.000
|
$4.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,000.000
|
$1.000
|
$0.980
|
$1.450
|
$1.000
|
$1.400
|
$1.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
328,648.000
|
$0.130
|
$0.130
|
$0.080
|
$0.100
|
$0.100
|
$0.080
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
9,125.000
|
$22.000
|
$32.450
|
$32.450
|
$33.000
|
$33.250
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
32.000
|
$1,800.000
|
$2,612.500
|
$2,612.500
|
$2,450.000
|
$2,676.570
|
$2,384.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
11.000
|
$1,500.000
|
$1,457.500
|
$1,457.500
|
$1,350.000
|
$1,493.240
|
$1,330.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
3.000
|
$1,100.000
|
$1,162.700
|
$1,162.700
|
$1,100.000
|
$1,191.210
|
$1,061.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
9,125.000
|
$3.000
|
$4.400
|
$4.400
|
$4.250
|
$4.510
|
$4.050
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
11.000
|
$240.000
|
$440.000
|
$440.000
|
$410.000
|
$450.790
|
$402.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
40.000
|
$2,500.000
|
$3,300.000
|
$3,300.000
|
$3,050.000
|
$3,380.930
|
$3,011.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
40.000
|
$280.000
|
$440.000
|
$440.000
|
$410.000
|
$450.790
|
$402.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,289.000
|
$25.000
|
$29.980
|
$29.980
|
$28.000
|
$30.710
|
$27.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
67.000
|
$550.000
|
$858.000
|
$940.500
|
$870.000
|
$963.560
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$600.000
|
$1,001.000
|
$1,094.500
|
$1,050.000
|
$1,121.340
|
$730.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
72.000
|
$80.000
|
$75.000
|
$110.000
|
$105.000
|
$112.700
|
$150.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
6,569.000
|
$5.500
|
$6.050
|
$6.050
|
$5.600
|
$6.200
|
$5.500
|
|
|
REMOVE LRSA
|
EA
|
16.000
|
$900.000
|
$1,100.000
|
$1,100.000
|
$1,050.000
|
$1,126.980
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
67.000
|
$80.000
|
$99.000
|
$148.500
|
$140.000
|
$152.140
|
$135.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
87.000
|
$34.000
|
$22.000
|
$22.000
|
$21.000
|
$22.540
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
60.000
|
$30.000
|
$22.000
|
$22.000
|
$21.000
|
$22.540
|
$20.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
40.000
|
$72.000
|
$99.000
|
$148.500
|
$140.000
|
$152.140
|
$135.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
40.000
|
$90.000
|
$99.000
|
$148.500
|
$140.000
|
$152.140
|
$135.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
294.000
|
$18.000
|
$50.000
|
$16.500
|
$15.500
|
$16.900
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
41,100.000
|
$0.700
|
$0.190
|
$0.120
|
$0.120
|
$0.120
|
$0.160
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
164,324.000
|
$0.600
|
$0.150
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
164,324.000
|
$0.600
|
$0.150
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,326.000
|
$2.000
|
$1.500
|
$1.890
|
$1.800
|
$2.250
|
$0.510
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,594.000
|
$0.700
|
$0.880
|
$0.680
|
$0.700
|
$0.700
|
$0.760
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
41,100.000
|
$0.350
|
$0.400
|
$0.340
|
$0.320
|
$0.350
|
$0.340
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
180,035.000
|
$0.300
|
$0.340
|
$0.340
|
$0.320
|
$0.350
|
$0.290
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
180,035.000
|
$0.350
|
$0.350
|
$0.340
|
$0.320
|
$0.350
|
$0.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,176.000
|
$3.000
|
$3.520
|
$3.300
|
$3.050
|
$3.380
|
$3.040
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
369,748.000
|
$0.400
|
$0.380
|
$0.330
|
$0.310
|
$0.340
|
$0.320
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,594.000
|
$0.750
|
$0.530
|
$0.660
|
$0.710
|
$0.680
|
$0.460
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
500.000
|
$15.000
|
$22.000
|
$22.000
|
$21.000
|
$22.540
|
$20.070
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
10.000
|
$4,000.000
|
$1,100.000
|
$1,100.000
|
$1,050.000
|
$1,126.980
|
$1,004.000
|
|
|
BONDING COURSESE
|
GAL
|
61,510.000
|
$3.000
|
$3.750
|
$5.270
|
$5.000
|
$3.670
|
$2.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$19,250.000
|
$11,762.710
|
$25,000.000
|
$22,156.330
|
$16,500.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$7,000.000
|
$8,250.000
|
$10,344.470
|
$8,000.000
|
$11,269.750
|
$6,500.000
|
|
|
AUTO PORT SMRT TRF MONITOR SYS (PLAN 1)
|
DAY
|
702.000
|
$300.000
|
$470.350
|
$470.350
|
$200.000
|
$450.000
|
$430.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$5,000.000
|
$18,000.000
|
$20,864.050
|
$15,000.000
|
$21,833.540
|
$6,500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,704.000
|
$30.000
|
$4.500
|
$70.460
|
$90.000
|
$70.000
|
$80.000
|
|
Totals: |
$25,388,366.200
|
$24,141,875.150
|
$25,073,595.670
|
$26,699,839.960
|
$27,794,811.080
|
$28,333,612.780
|