WASHINGTON US 290 (0114-10-102)

Items: 73

County: WASHINGTON
Length: 4.5690 MILES
Highway: US 290
District: BRYAN
Control Number: 0114-10-102
DBE Goal: 0.0%
Project: F 2026(879)
Guaranty: $84,000.00
Time: 110 WORKING DAYS
Engineer's Estimate: $4,214,218.54
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263219
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00187526
Contract Type: FEDERAL
Project Description: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (6)
E
Engineer's Estimate
$4,214,218.54
$4,287,440.48
Over/Under Est: 1.74% $73,221.94
Over/Under Est: 6.6% $278,118.91
Amt Left: 4.78% $204,896.97
$4,729,455.02
Over/Under Est: 12.23% $515,236.48
Amt Left: 10.31% $442,014.54
Delta: -5.28% -$237,117.57
Over/Under Est: 19.44% $819,200.17
Amt Left: 17.4% $745,978.23
Delta: -6.43% -$303,963.69
Over/Under Est: 19.47% $820,544.56
Amt Left: 17.43% $747,322.62
Delta: -0.03% -$1,344.39
Over/Under Est: 45.21% $1,905,182.93
Amt Left: 42.73% $1,831,960.99
Delta: -21.54% -$1,084,638.37

Bid Items & Bid Tabulations

73 Total 0 of 73
WASHINGTON  |  US 290  |  BRYAN  |  0114-10-102  |  08/06/2026 1:00 PM CDT  |  $4,214,218.54  |  F 2026(879)  |  REHAB EXIST ROADWAY  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
BRAZOS PAVING, INC.
TEXAS MATERIALS GROUP, INC.
LARRY YOUNG PAVING, INC.
DURWOOD GREENE CONSTRUCTION CO.
REMOV CONC (DRIVEWAYS)
SY 86.000 $20.000 $30.000 $23.850 $31.250 $60.000 $19.000 $45.000
RMV (18") TRT/UNTRT BASE & ASPH PAV
SY 6,956.000 $8.000 $15.000 $11.550 $14.000 $18.000 $18.000 $35.000
BACKFILL (TY A OR B)
STA 161.770 $186.000 $250.000 $124.000 $177.000 $190.000 $230.000 $300.000
BLADING
STA 36.600 $85.000 $200.000 $15.000 $194.000 $100.000 $130.000 $125.000
FURN & PLACE TOPSOIL (4")
SY 13,742.000 $1.100 $1.000 $0.940 $1.000 $0.350 $1.000 $2.500
BROADCAST SEED (PERM_RURAL_CLAY)
SY 13,742.000 $0.300 $0.220 $0.240 $0.250 $0.300 $0.250 $0.400
BROADCAST SEED (TEMP_WARM_COOL)
SY 13,742.000 $0.270 $0.170 $0.180 $0.200 $0.300 $0.250 $0.400
VEGETATIVE WATERING
TGL 1,374.000 $7.250 $5.000 $14.500 $33.500 $1.000 $41.000 $12.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 75.000 $344.000 $350.000 $400.000 $389.000 $365.000 $470.000 $400.000
LIME TRT (EXIST MATL)(8")
SY 7,561.000 $2.350 $5.000 $3.820 $4.750 $7.700 $7.250 $10.000
CEM TRT(PLNT MX)(CL M)(TYA)(GR1-2)(12")
SY 6,956.000 $44.450 $65.000 $55.460 $52.000 $65.000 $54.000 $75.000
PRIME COAT (AE-P)
GAL 1,512.000 $5.100 $6.000 $5.200 $4.500 $6.600 $6.500 $10.000
PFC-C PG76-22 SAC-A
TON 5,053.000 $170.000 $165.000 $195.000 $191.600 $214.000 $230.000 $225.000
TACK COAT
GAL 7,245.000 $2.750 $3.000 $2.960 $4.650 $3.100 $3.750 $4.000
SP MIXES SP-B PG64-22
TON 3,775.000 $115.000 $110.000 $114.200 $122.800 $116.000 $140.000 $150.000
SP MIXES SP-C PG70-22
TON 9,962.000 $135.000 $110.000 $124.600 $142.500 $141.000 $150.000 $160.000
TACK COAT
GAL 8,265.000 $3.400 $3.000 $2.960 $4.650 $3.100 $4.000 $4.000
PLANE & TEXT ASPH CONC PAV(1.5")
SY 50,241.000 $1.750 $2.000 $1.990 $1.500 $1.900 $1.500 $3.000
PLANE ASPH CONC PAV(4")
SY 9,758.000 $3.000 $4.000 $3.590 $3.000 $5.000 $4.000 $9.000
PLANE & TEXT CONC PAV(1.5" - 4")
SY 2,534.000 $2.500 $4.000 $4.000 $4.500 $8.000 $3.500 $9.000
CL C CONC (MISC)
CY 2.000 $1,800.000 $4,000.000 $12,700.000 $1,225.000 $8,000.000 $500.000 $2,400.000
RIPRAP (MOW STRIP)(4 IN)
CY 202.100 $526.000 $650.000 $767.000 $506.750 $710.000 $690.000 $900.000
MOBILIZATION
LS 1.000 $200,677.070 $222,000.000 $137,000.000 $195,500.000 $326,400.000 $110,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,000.000 $5,000.000 $7,680.000 $8,157.000 $1,405.660 $9,800.000 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $9,000.000 $4,460.000 $7,235.000 $19,800.000 $2,400.000 $10,000.000
TMA (STATIONARY)
DAY 98.000 $200.000 $250.000 $400.000 $230.000 $13.000 $260.000 $350.000
TMA (MOBILE OPERATION)
DAY 12.000 $250.000 $500.000 $850.000 $626.000 $660.000 $660.000 $350.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $50.000 $40.000 $39.000 $42.000 $48.000 $45.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $12.200 $12.000 $11.000 $12.000 $12.000 $13.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,740.000 $3.600 $4.500 $3.600 $4.000 $4.200 $4.250 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,740.000 $1.000 $1.000 $1.100 $1.200 $0.890 $1.250 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,430.000 $40.000 $30.000 $70.300 $74.500 $46.000 $24.000 $75.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,710.000 $10.000 $16.000 $11.500 $10.750 $13.400 $11.000 $25.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,430.000 $18.000 $17.000 $11.000 $10.500 $12.800 $8.500 $22.000
DRIVEWAYS (CONC)
SY 86.000 $100.000 $150.000 $187.000 $101.000 $135.000 $180.000 $200.000
DRIVEWAYS (ACP)
SY 1,361.000 $55.000 $35.000 $33.000 $28.000 $37.000 $22.000 $35.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 37,832.000 $0.250 $0.350 $0.180 $0.250 $0.340 $0.500 $0.360
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 12,190.000 $2.500 $3.500 $1.700 $0.300 $3.000 $2.500 $12.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,150.000 $26.000 $30.000 $27.220 $30.500 $25.430 $32.000 $29.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,255.000 $2,500.000 $2,921.000 $2,350.000 $1,964.650 $2,800.000 $3,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,350.000 $1,800.000 $1,761.000 $1,560.000 $1,304.020 $2,100.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 1,150.000 $2.500 $4.000 $2.200 $7.250 $6.000 $2.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $200.000 $300.000 $278.000 $720.000 $601.980 $320.000 $300.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $150.000 $300.000 $220.000 $258.000 $215.360 $260.000 $300.000
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 3,660.000 $11.000 $30.000 $22.500 $21.500 $30.000 $28.000 $22.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 6.000 $1,800.000 $5,000.000 $3,611.000 $5,381.000 $5,000.000 $6,900.000 $5,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,155.000 $3,500.000 $3,722.000 $4,500.000 $3,737.580 $4,300.000 $3,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $240.000 $300.000 $220.000 $655.000 $548.140 $260.000 $400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,373.000 $2,000.000 $2,055.000 $1,860.000 $1,554.900 $1,600.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $753.000 $1,750.000 $1,000.000 $1,200.000 $975.240 $1,000.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $8,667.000 $5,500.000 $8,500.000 $10,400.000 $8,687.500 $8,500.000 $9,200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 92.000 $12.000 $25.000 $30.000 $18.500 $15.520 $32.000 $32.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 16.000 $34.000 $50.000 $39.000 $30.500 $25.620 $45.000 $45.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 12,590.000 $0.300 $0.250 $0.280 $0.500 $0.400 $0.500 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 50,278.000 $0.320 $0.250 $0.280 $0.500 $0.380 $0.500 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,500.000 $0.500 $0.500 $0.440 $0.750 $0.600 $0.750 $0.450
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 50,278.000 $0.400 $0.250 $0.280 $0.500 $0.380 $0.500 $0.300
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 261.000 $8.000 $4.000 $4.400 $6.000 $5.000 $6.500 $4.400
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 261.000 $5.000 $4.000 $4.400 $6.000 $5.000 $6.500 $4.400
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 778.000 $2.800 $2.000 $2.200 $5.000 $4.000 $5.250 $2.200
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 778.000 $2.000 $2.000 $2.200 $5.000 $4.000 $5.250 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,770.000 $1.400 $1.500 $1.500 $1.000 $1.000 $0.500 $3.500
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 530.000 $1.000 $1.000 $2.000 $1.250 $1.000 $1.250 $5.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,311.000 $1.000 $1.000 $2.000 $1.250 $1.000 $1.250 $2.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 36.000 $7.000 $10.000 $10.000 $15.000 $13.000 $17.000 $20.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 10.000 $175.000 $200.000 $211.000 $210.000 $175.000 $230.000 $220.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 10.000 $200.000 $200.000 $211.000 $210.000 $176.000 $230.000 $225.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 4,467.000 $0.700 $0.700 $0.780 $0.750 $0.650 $0.750 $0.850
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 17,869.000 $0.550 $0.700 $0.780 $0.750 $0.590 $0.750 $0.800
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 17,869.000 $0.550 $0.700 $0.780 $0.750 $0.590 $0.750 $0.800
REFL PAV MRKR TY II-C-R
EA 133.000 $4.000 $6.000 $7.000 $6.000 $5.000 $6.500 $7.000
ELIM EXT PM & MRKS (4")
LF 7,740.000 $0.400 $0.500 $0.440 $0.750 $0.650 $0.750 $0.450
PAV SURF PREP FOR MRK (6")
LF 3,044.000 $0.100 $0.100 $0.030 $0.300 $0.250 $0.250 $0.050
Totals: $4,214,218.540 $4,287,440.480 $4,492,337.450 $4,729,455.015 $5,033,418.710 $5,034,763.100 $6,119,401.470
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $82,000.00
Total: $92,000.00