Show Job Controls
Bid Cobra

WEBB IH 35 (0018-05-089)

Items: 443

County: WEBB
Length: 3.6950 MILES
Highway: IH 35
District: LAREDO
Control Number: 0018-05-089
DBE Goal: 0.0%
Project: F 2026(017)
Guaranty: $100,000.00
Time: 894 WORKING DAYS
Engineer's Estimate: $226,858,175.99
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263201
Type: INTERCHANGE IMPROVEMENT (NEW OR UPDATE)
Project ID: A00119935
Contract Type: FEDERAL
Project Description: IH-35 RECONSTRUCTION & INTERCHANGES(RECONSTRUCTED/NEW)@UNIROYAL DR & SH 84
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$226,858,175.99
$205,813,980.82
Over/Under Est: -9.28% -$21,044,195.17
$217,055,849.05
Over/Under Est: -4.32% -$9,802,326.94
Amt Left: 5.46% $11,241,868.23
Over/Under Est: -1.47% -$3,330,900.99
Amt Left: 8.61% $17,713,294.18
Delta: -2.98% -$6,471,425.95
Over/Under Est: 21.16% $48,009,350.41
Amt Left: 33.55% $69,053,545.58
Delta: -22.97% -$51,340,251.40

Bid Items & Bid Tabulations

443 Total 0 of 443
WEBB  |  IH 35  |  LAREDO  |  0018-05-089  |  08/06/2026 1:00 PM CDT  |  $226,858,175.99  |  F 2026(017)  |  INTERCHANGE IMPRV (NEW OR UPDATE)  |  894 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PULICE CONSTRUCTION, INC.
WEBBER, LLC
JAMES CONSTRUCTION GROUP, LLC
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 232.590 $15,000.000 $81,000.000 $61,739.850 $62,000.000 $117,803.860
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 15.000 $352.000 $575.640 $350.000 $791.370 $829.700
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 14.000 $771.000 $616.760 $2,000.000 $1,133.200 $1,352.880
REMOV CONC (PAV)
SY 12,159.000 $10.000 $12.630 $8.400 $10.110 $16.860
REMOV CONC (MOWSTRIP)
SY 2,126.000 $14.000 $9.330 $15.940 $14.230 $12.290
REMOV CONC (RIPRAP)
SY 11,534.000 $14.000 $11.620 $6.450 $8.150 $11.910
REMOV CONC (MEDIANS)
SY 316.000 $16.500 $26.480 $18.790 $14.490 $14.440
REMOV CONC (DRIVEWAYS)
SY 5,525.000 $20.000 $10.550 $11.380 $15.870 $10.840
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 1,675.000 $30.000 $12.490 $7.440 $40.850 $12.380
REMOV CONC (CURB)
LF 8,693.000 $3.500 $2.100 $5.430 $3.420 $3.790
REMOV CONC (RETAINING WALLS)
SY 3,737.000 $35.000 $21.340 $7.890 $7.120 $21.670
REMOV CONC (TRAFFIC BARRIER)
LF 3,048.000 $24.500 $18.420 $9.600 $4.790 $15.330
REMOV CONC (RAIL)
LF 1,971.000 $18.000 $19.190 $13.400 $10.570 $12.640
REMOV CONC (FLUME)
SY 196.000 $96.000 $85.380 $53.880 $21.300 $48.370
RMV (19"-23") TRT/UNTRT BASE & ASPH PAV
SY 308,036.000 $15.000 $5.000 $5.960 $6.470 $13.190
EXCAV (ROADWAY)
CY 542,689.000 $14.000 $10.000 $9.890 $8.930 $19.330
EMBANK (FNL)(DC)(TY C)
CY 473,311.000 $18.000 $10.000 $5.820 $19.030 $13.680
DRILL SEED (PERM_RURAL_CLAY)
SY 556,319.000 $0.200 $0.190 $0.190 $0.200 $0.250
DRILL SEED (TEMP_WARM_COOL)
SY 556,319.000 $0.200 $0.180 $0.180 $0.230 $0.250
FERTILIZER
AC 115.050 $565.000 $477.140 $467.600 $235.000 $263.610
VEGETATIVE WATERING
TGL 54,667.200 $5.000 $8.000 $1.090 $27.680 $28.500
PROOF ROLLING
HR 171.000 $210.000 $77.320 $85.770 $121.110 $95.240
CEM TRT(PLNT MX)(CL N)(TY E)(GR 5)(6")
SY 12,149.000 $16.500 $19.000 $16.260 $22.080 $25.060
CEM TRT(PLNT MX)(CL N)(TYE)(GR1-2)(8")
SY 293,683.000 $20.000 $21.600 $24.460 $27.570 $33.080
CEM TRT(PLNT MX)(CL N)(TYE)(GR1-2)(9")
SY 253,529.000 $20.000 $24.780 $21.960 $30.490 $36.860
PRIME COAT (MC-30)
GAL 106,591.000 $5.000 $5.780 $5.500 $5.500 $5.800
PRIME COAT (RC-250)
GAL 5,489.000 $8.000 $7.350 $7.000 $7.000 $7.380
AGGR (TY-PB, GR-5)(SAC-A)
CY 197.000 $300.000 $236.290 $225.000 $225.000 $237.250
D-GR HMA TY-B SAC-B PG70-22
TON 6,040.000 $140.000 $119.720 $115.440 $119.000 $120.210
D-GR HMA TY-C SAC-B PG70-22
TON 65,775.000 $140.000 $113.420 $109.190 $113.000 $113.870
SP MIXES SP-C PG70-22
TON 1,349.000 $200.000 $126.020 $121.190 $125.000 $126.530
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 3,695.000 $200.000 $175.380 $168.190 $172.000 $176.090
PLANE ASPH CONC PAV (2.5")
SY 15,908.000 $3.500 $1.350 $4.120 $1.580 $1.760
CONC PVMT (CRCP) (13")
SY 493,206.000 $105.000 $87.200 $97.150 $117.140 $110.540
CONC PVMT(TRANSITION SLAB) (13")
SY 679.000 $155.000 $215.000 $275.210 $257.020 $82.930
CONC PVMT (CRCP)(HES) (13")
SY 26,424.000 $155.000 $115.000 $113.470 $147.800 $138.230
STRUCT EXCAV
CY 18,218.000 $26.500 $5.160 $3.120 $24.790 $27.250
CEM STABIL BKFL
CY 11,836.000 $150.000 $100.000 $130.190 $206.950 $105.280
FLOWABLE BACKFILL
CY 903.000 $200.000 $200.000 $227.920 $248.710 $220.340
TRENCH EXCAVATION PROTECTION
LF 9,741.000 $8.000 $2.420 $6.270 $2.170 $10.200
TEMPORARY SPL SHORING
SF 113,586.000 $60.000 $14.000 $19.180 $41.390 $34.000
DRILL SHAFT (18 IN)
LF 92.000 $265.000 $58.000 $117.450 $54.110 $74.770
DRILL SHAFT (36 IN)
LF 11,443.000 $300.000 $215.000 $213.220 $182.900 $215.020
DRILL SHAFT (42 IN)
LF 1,830.000 $485.000 $236.000 $269.300 $244.540 $284.060
DRILL SHAFT (48 IN)
LF 1,913.000 $525.000 $350.000 $329.570 $317.860 $378.080
DRILL SHAFT (54 IN)
LF 44.000 $890.000 $499.430 $775.000 $685.000 $840.190
DRILL SHAFT (72 IN)
LF 120.000 $1,608.500 $1,087.490 $790.000 $850.000 $1,337.680
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 14.000 $180.000 $131.430 $75.000 $132.000 $158.160
DRILL SHAFT (SIGN MTS) (24 IN)
LF 126.000 $340.000 $184.000 $835.500 $179.000 $263.610
DRILL SHAFT (SIGN MTS) (48 IN)
LF 92.000 $860.000 $499.430 $991.000 $991.000 $474.500
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 280.000 $858.500 $841.140 $1,086.500 $1,086.500 $774.990
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 320.000 $324.000 $252.340 $287.000 $287.000 $289.960
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 12.000 $474.500 $289.140 $451.000 $451.000 $395.410
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $430.000 $368.000 $580.000 $580.500 $36.900
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 255.000 $600.000 $499.430 $819.000 $819.000 $527.210
CL C CONC (ABUT)
CY 406.800 $1,500.000 $1,600.000 $1,390.890 $934.660 $1,351.260
CL C CONC (CAP)
CY 1,379.300 $1,500.000 $1,500.000 $1,451.780 $1,313.410 $1,627.780
CL C CONC (CAP)(MASS)
CY 8.000 $1,500.000 $950.000 $2,806.410 $1,128.580 $5,967.720
CL C CONC (COLUMN)
CY 1,040.000 $1,600.000 $1,700.000 $1,570.750 $1,440.310 $2,068.050
CL C CONC (RAIL FOUNDATION)
CY 144.000 $552.500 $600.000 $552.280 $664.290 $674.130
REINF CONC SLAB
SF 260,504.000 $24.000 $21.000 $22.990 $22.430 $21.540
BRIDGE MEDIAN
SF 9,932.000 $18.000 $12.990 $28.840 $21.550 $12.700
APPROACH SLAB
CY 988.000 $650.000 $927.680 $850.870 $603.320 $1,217.420
RETAINING WALL (MSE)
SF 152,871.000 $60.000 $85.000 $97.710 $69.830 $126.960
RETAINING WALL (TEMP WALL)
SF 19,695.000 $20.000 $19.970 $39.590 $29.580 $45.060
RETAINING WALL (SPREAD FOOTING)
SF 444.000 $123.000 $94.880 $119.690 $80.450 $147.940
PRESTR CONC GIRDER (TX54)
LF 27,590.460 $185.000 $210.000 $191.990 $220.320 $242.210
PRESTR CONC GIRDER (TX62)
LF 7,047.000 $215.000 $225.000 $213.930 $240.380 $252.970
PNEUMATICALLY PLACED CONC (REPAIR)
CF 1,213.000 $120.000 $47.820 $112.930 $16.620 $62.340
RIPRAP (CONC)(4 IN)
CY 3,380.850 $553.000 $550.000 $455.420 $377.900 $655.830
RIPRAP (CONC)(5 IN)
CY 51.000 $598.000 $593.680 $496.040 $634.000 $669.380
RIPRAP (CONC)(6 IN)
CY 374.000 $733.500 $598.880 $490.070 $488.940 $637.850
RIPRAP (CONC)(FLUME)
CY 35.000 $732.000 $624.920 $457.050 $1,245.410 $1,113.790
RIPRAP (MOW STRIP)(4 IN)
CY 588.000 $653.000 $583.260 $502.700 $677.100 $825.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 1,653.000 $201.000 $224.780 $337.800 $192.170 $397.110
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 533.000 $975.000 $604.090 $574.490 $445.930 $869.950
RAIL (TY PR11)
LF 32.500 $89.500 $161.870 $249.580 $185.310 $428.000
RAIL (HANDRAIL)(TY B)
LF 115.000 $130.500 $129.930 $141.550 $122.780 $145.230
RAIL (HANDRAIL)(TY F)
LF 461.000 $141.000 $197.160 $192.000 $126.250 $120.100
RAIL (TY T221)(MOD)
LF 2,282.000 $147.500 $51.150 $65.010 $116.400 $118.230
RAIL(TY T80SS)(MOD)
LF 24,693.600 $130.000 $65.000 $92.270 $94.070 $110.240
RAIL(TY T80PP)(MOD)
LF 3,558.000 $220.000 $87.170 $154.410 $168.980 $94.650
RAIL(TY T80PP-TS)(MOD)
LF 3,932.000 $300.000 $250.000 $303.440 $197.670 $360.740
TYPE A JOINT
LF 280.000 $52.000 $15.240 $160.000 $177.440 $41.570
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,603.000 $221.000 $233.150 $329.250 $177.440 $217.860
CONC BOX CULV (3 FT X 2 FT)
LF 228.000 $329.500 $320.000 $276.080 $280.280 $381.410
CONC BOX CULV (4 FT X 3 FT)
LF 416.000 $460.000 $385.000 $365.070 $347.390 $454.030
CONC BOX CULV (7 FT X 3 FT)
LF 1,381.000 $730.000 $710.000 $598.500 $589.170 $778.950
CONC BOX CULV (8 FT X 3 FT)
LF 666.000 $743.000 $850.000 $680.000 $645.410 $915.740
CONC BOX CULV (8 FT X 4 FT)
LF 328.000 $900.000 $860.000 $838.000 $696.690 $1,042.010
CONC BOX CULV (8 FT X 8 FT)
LF 568.000 $1,400.000 $1,195.000 $919.310 $881.600 $1,236.510
RC PIPE (CL III)(24 IN)
LF 9,667.000 $85.000 $100.000 $88.440 $109.780 $97.640
RC PIPE (CL III)(30 IN)
LF 887.000 $100.000 $131.000 $129.550 $134.930 $131.980
RC PIPE (CL III)(36 IN)
LF 1,425.000 $140.000 $163.000 $153.900 $188.190 $162.820
MANH (COMPL)(PRM)(48IN)
EA 6.000 $7,918.500 $9,496.320 $7,026.760 $7,868.670 $7,471.990
MANH (COMPL)(PRM)(60IN)
EA 3.000 $10,050.000 $10,202.070 $9,259.580 $9,476.660 $8,137.700
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $9,011.000 $9,492.470 $7,061.120 $7,684.010 $7,483.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 2.000 $24,500.000 $19,586.020 $17,293.990 $16,117.230 $13,977.150
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 1.000 $9,330.500 $11,476.270 $10,118.770 $11,146.570 $8,686.930
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 1.000 $11,032.000 $11,477.300 $9,556.840 $11,146.570 $8,686.930
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 24.000 $9,500.000 $11,550.660 $9,742.450 $11,354.240 $9,003.260
INLET (COMPL)(PCU)(5FT)(LEFT)
EA 2.000 $11,770.000 $11,314.960 $9,720.620 $9,166.970 $9,003.260
INLET (COMPL)(PCU)(5FT)(RIGHT)
EA 1.000 $11,150.000 $11,374.330 $10,004.790 $8,268.860 $9,003.260
INLET (COMPL)(PCU)(5FT)(BOTH)
EA 3.000 $11,283.500 $11,859.090 $10,978.830 $9,513.560 $9,319.590
INLET (COMPL)(PMBD)(4FT)
EA 15.000 $6,940.500 $10,525.380 $9,196.020 $6,254.160 $8,348.570
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 2.000 $6,755.500 $9,752.430 $6,686.790 $8,039.650 $8,752.340
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 10.000 $8,402.500 $10,582.160 $7,999.620 $6,688.650 $7,144.650
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 2.000 $11,395.000 $20,207.480 $18,494.660 $13,745.050 $15,690.910
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 3.000 $8,052.500 $8,780.900 $7,193.260 $6,850.490 $6,933.770
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 4.000 $7,800.000 $9,068.010 $7,144.940 $7,802.080 $8,377.610
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $8,872.000 $11,517.380 $9,052.890 $7,435.350 $10,135.170
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,993.000 $10,809.570 $8,699.020 $6,339.970 $8,494.520
INLET (COMPL)(TY AZR)(HOU)
EA 3.000 $9,000.000 $9,050.630 $10,268.330 $10,116.990 $19,697.900
JCT BOX (COMPL)(SPL)
EA 1.000 $13,510.000 $42,850.020 $62,710.780 $50,094.460 $43,693.730
INLET (COMPL) (TY MSE2)
EA 23.000 $8,000.000 $10,884.860 $14,636.200 $12,918.140 $9,893.440
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $7,940.000 $12,471.160 $18,641.090 $11,926.620 $19,586.270
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $11,533.500 $11,225.080 $19,046.700 $12,279.510 $20,980.360
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 3.000 $10,666.500 $16,707.170 $23,236.030 $17,069.820 $24,736.600
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $13,778.000 $9,320.400 $13,311.530 $18,142.450 $15,218.540
WINGWALL (PW - 1) (HW=4 FT)
EA 5.000 $17,000.000 $17,229.560 $20,846.800 $25,702.320 $28,115.930
WINGWALL (PW - 1) (HW=5 FT)
EA 6.000 $21,553.500 $21,656.720 $26,591.270 $26,787.600 $33,829.190
WINGWALL (PW - 1) (HW=6 FT)
EA 3.000 $20,238.500 $27,801.980 $37,939.540 $33,338.400 $49,538.800
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $33,742.000 $33,585.610 $47,871.690 $35,332.450 $64,735.820
WINGWALL (PW - 1) (HW=9 FT)
EA 3.000 $25,000.000 $60,114.670 $69,997.070 $42,357.830 $107,215.230
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 17.000 $2,034.500 $2,737.820 $3,959.980 $1,670.730 $4,371.870
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $2,139.000 $2,927.880 $4,187.540 $1,599.520 $4,627.550
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $3,752.000 $6,997.730 $10,570.360 $3,482.980 $7,987.180
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
LF 779.000 $1,925.000 $650.000 $718.290 $1,258.080 $1,359.770
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
LF 732.000 $2,500.000 $940.000 $991.850 $1,955.820 $2,207.970
JACK BOR TUN BOX CULV (5 FT X 5 FT)
LF 1,452.000 $4,425.000 $1,900.000 $1,998.260 $2,361.600 $2,838.960
ADJUSTING MANHOLES
EA 1.000 $4,000.000 $2,251.270 $6,170.650 $1,618.760 $3,872.870
ADJUSTING INLETS
EA 9.000 $2,336.000 $2,251.280 $8,886.710 $1,618.760 $4,189.200
PIPE (PVC) (SCH 40) (6 IN)
LF 1,163.000 $42.000 $51.720 $20.840 $21.660 $25.160
REMOV STR (INLET)
EA 14.000 $1,039.500 $3,904.270 $1,405.190 $437.470 $4,089.900
REMOV STR (MANHOLE)
EA 1.000 $3,411.500 $2,341.570 $1,957.440 $1,727.840 $2,776.930
REMOV STR (SET)
EA 40.000 $419.000 $1,754.770 $668.890 $348.880 $1,451.890
REMOV STR (WINGWALL)
EA 6.000 $1,704.500 $3,902.760 $2,063.960 $1,727.840 $5,824.870
REMOV STR (HEADWALL)
EA 9.000 $1,611.000 $7,805.520 $2,063.950 $1,727.840 $5,602.480
REMOV STR (PIPE)
LF 2,678.000 $14.000 $43.400 $33.210 $12.060 $14.380
REMOV STR (BOX CULVERT)
LF 2,705.000 $94.000 $66.620 $44.550 $64.900 $68.080
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $200,000.000 $63,051.010 $119,870.950 $93,040.380 $89,766.940
MOBILIZATION
LS 1.000 $20,480,055.000 $20,581,398.080 $21,500,000.000 $13,647,171.470 $27,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 45.000 $35,000.000 $50,000.000 $225,000.000 $29,368.840 $45,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $10,000.000 $15,000.000 $21,108.750 $17,098.260 $30,000.000
TMA (STATIONARY)
DAY 3,500.000 $66.500 $275.000 $1.000 $178.480 $250.000
TMA (MOBILE OPERATION)
HR 6,000.000 $62.500 $55.000 $1.000 $109.210 $85.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 672.000 $45.500 $40.150 $58.580 $38.950 $42.170
ROCK FILTER DAMS (REMOVE)
LF 672.000 $13.000 $27.320 $15.740 $26.500 $13.710
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 555.000 $26.500 $40.150 $67.030 $38.950 $42.170
CONSTRUCTION EXITS (REMOVE)
SY 555.000 $11.000 $25.260 $14.800 $24.500 $13.710
TEMP SEDMT CONT FENCE (INSTALL)
LF 29,665.000 $3.000 $3.660 $4.380 $3.550 $4.740
TEMP SEDMT CONT FENCE (REMOVE)
LF 29,665.000 $1.000 $1.390 $1.090 $1.350 $1.050
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,365.000 $5.500 $6.340 $8.610 $6.150 $6.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,365.000 $1.000 $2.470 $1.090 $2.400 $2.110
CONSTRUCTING DETOURS
SY 71,533.000 $100.000 $78.000 $108.220 $115.170 $124.250
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 72.000 $63.000 $100.200 $75.000 $113.700 $189.980
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 35,860.000 $60.000 $60.000 $36.850 $56.000 $51.720
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 23,220.000 $39.000 $60.000 $28.320 $45.310 $53.960
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 340.000 $39.000 $75.000 $28.500 $45.320 $97.520
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 186,680.000 $7.000 $4.000 $3.680 $4.930 $5.800
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 91,855.000 $5.000 $2.470 $6.810 $4.930 $9.580
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,960.000 $5.000 $4.270 $11.500 $4.960 $20.040
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 35,860.000 $10.000 $8.500 $22.300 $8.820 $22.990
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 23,220.000 $10.000 $5.200 $24.320 $8.820 $25.830
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 340.000 $10.000 $5.300 $315.430 $9.040 $31.840
PERM CTB (SGL SLOPE)(42)(MOD)
LF 15,903.000 $150.000 $45.000 $81.090 $90.020 $76.930
PERM CTB (TRAN T80SS TO SSTR)(MOD)
LF 72.000 $354.000 $125.000 $271.130 $307.970 $375.000
PERM CTB (TRANS T80SS TO T80PP)(MOD)
LF 30.000 $400.000 $212.000 $398.280 $384.020 $353.200
CONC CURB (TY II)
LF 23,982.000 $15.000 $25.000 $7.730 $22.350 $14.180
CONC CURB (DOWELED)
LF 3,784.000 $35.000 $26.040 $12.550 $28.280 $31.160
CONC CURB U-TURN
LF 379.000 $50.000 $34.370 $50.000 $43.690 $87.430
DRIVEWAYS (CONC) (HES)
SY 2,312.000 $119.500 $140.610 $132.790 $71.970 $127.740
CONC SIDEWALKS (4")
SY 1,517.000 $70.000 $72.910 $62.180 $80.330 $70.480
CONC SIDEWALKS (6")
SY 2,876.000 $143.500 $130.190 $69.090 $90.190 $143.510
CURB RAMPS (TY 1)
EA 3.000 $2,476.500 $2,603.840 $2,800.000 $2,664.600 $3,891.170
CURB RAMPS (TY 2)
EA 1.000 $2,846.000 $3,228.760 $2,760.000 $3,016.520 $4,570.950
CURB RAMPS (TY 7)
EA 6.000 $2,055.000 $2,603.840 $2,800.000 $3,016.580 $4,238.600
CURB RAMPS (TY 10)
EA 3.000 $2,897.500 $2,916.300 $2,850.000 $3,024.480 $5,209.830
CURB RAMPS (TY 21)
EA 2.000 $3,872.000 $3,645.380 $2,800.000 $3,102.590 $5,511.570
CURB RAMPS (TY 22)
EA 4.000 $4,133.500 $3,749.530 $2,750.000 $5,441.130 $5,634.940
FIXED BOLLARD
EA 9.000 $292.500 $1,384.220 $500.000 $652.160 $579.920
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 13,301.000 $0.200 $0.480 $0.350 $0.170 $0.370
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 70,038.000 $0.700 $0.230 $0.230 $0.080 $0.240
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 20,802.000 $12.500 $6.120 $5.830 $5.000 $3.160
MTL W-BEAM GD FEN (TIM POST)
LF 763.000 $25.000 $32.270 $29.550 $24.500 $28.980
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,300.000 $1,315.510 $1,752.000 $1,350.000 $1,844.390
REMOVE METAL BEAM GUARD FENCE
LF 6,308.000 $1.500 $2.170 $2.100 $3.000 $2.630
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 19.000 $290.000 $249.030 $300.000 $150.000 $311.570
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $272.000 $281.510 $375.000 $150.000 $311.570
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 1,336.000 $10.000 $23.440 $29.610 $24.460 $25.820
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 1.000 $3,000.000 $3,161.550 $3,750.000 $3,949.210 $4,164.110
CABLE BARRIER (REMOVE)
LF 18,062.000 $6.500 $4.170 $4.990 $4.490 $4.730
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 3.000 $800.000 $416.850 $1,500.000 $1,549.210 $1,633.510
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,209.500 $3,735.390 $3,509.000 $3,250.000 $3,426.020
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $209.000 $357.300 $350.000 $200.000 $262.770
CRASH CUSH ATTEN (MOVE & RESET)
EA 28.000 $1,798.000 $1,340.210 $1,300.000 $2,500.000 $1,597.440
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $897.000 $1,134.020 $1,100.000 $1,000.000 $854.080
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 29.000 $30,000.000 $26,984.540 $26,175.000 $23,500.000 $27,156.460
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 5.000 $7,871.000 $8,937.870 $8,800.000 $8,800.000 $8,704.190
CHAIN LINK FENCE (INSTALL) (6')
LF 550.000 $75.000 $43.580 $50.130 $39.490 $41.640
CHAIN LINK FENCE (REMOVE)
LF 6,120.000 $10.000 $11.910 $7.830 $3.490 $3.680
GATE (REMOVE)
EA 1.000 $1,425.000 $476.400 $191.500 $249.210 $262.770
PIPE UNDERDRAINS (TY 8) (6")
LF 9,440.000 $40.000 $33.640 $42.420 $47.000 $48.070
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $2,429.500 $1,645.490 $2,051.000 $2,051.000 $2,162.600
REMOVE RD IL ASM (TRANS-BASE)
EA 7.000 $796.000 $415.310 $575.000 $575.550 $606.820
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 6.000 $2,044.500 $1,577.140 $1,286.000 $1,286.000 $1,355.980
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 30.000 $1,675.000 $1,771.660 $1,222.000 $1,222.000 $1,288.500
IN RD IL (TY SA) 50S-8 (400W EQ) LED
EA 4.000 $5,200.000 $7,149.710 $5,331.000 $5,331.000 $5,621.090
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 30.000 $6,500.000 $6,098.280 $3,972.000 $3,972.000 $4,188.660
HI MST IL POLE (150 FT)(100 MPH)
EA 7.000 $78,000.000 $67,291.400 $59,416.000 $59,416.000 $72,726.750
LED HI MST IL ASM (6 FIXT) (TY A)
EA 7.000 $36,931.500 $46,788.550 $41,872.000 $41,872.000 $44,150.470
CONDT (PVC) (SCH 40) (2")
LF 25,620.000 $10.500 $12.620 $17.300 $17.300 $18.240
CONDT (PVC) (SCH 40) (2") (BORE)
LF 250.000 $24.850 $26.290 $18.500 $18.500 $19.510
CONDT (PVC) (SCH 40) (3")
LF 1,205.000 $16.000 $14.720 $19.400 $19.400 $20.450
CONDT (PVC) (SCH 80) (2")
LF 16,375.000 $16.000 $13.140 $14.700 $14.700 $15.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 5,880.000 $35.000 $21.030 $20.000 $20.000 $21.090
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,000.000 $37.000 $31.540 $22.000 $22.000 $23.200
CONDT (PVC) (SCH 80) (4") (BORE)
LF 295.000 $40.000 $36.800 $31.000 $31.000 $32.680
CONDT (RM) (1 1/4")
LF 2,040.000 $50.000 $32.590 $30.600 $30.600 $32.260
CONDT (RM) (2")
LF 375.000 $22.500 $44.160 $32.000 $32.000 $33.740
CONDT (RM) (3")
LF 300.000 $46.000 $68.340 $59.000 $59.000 $62.210
CONDT (RM) (4")
LF 400.000 $68.000 $92.530 $78.000 $78.000 $82.250
ITS MULTI-DUCT CND (PVC-40)
LF 21,200.000 $36.500 $33.650 $24.100 $24.100 $25.410
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,295.000 $26.000 $36.800 $83.360 $83.360 $87.900
FIBER OPTIC CABLE ROAD MARKER
EA 59.000 $280.000 $236.570 $238.500 $238.500 $251.480
ELEC CONDR (NO.14) INSULATED
LF 23,685.000 $1.000 $1.000 $1.100 $1.100 $1.160
ELEC CONDR (NO.10) BARE
LF 120.000 $1.500 $1.310 $1.650 $1.650 $1.740
ELEC CONDR (NO.10) INSULATED
LF 240.000 $7.000 $1.630 $1.700 $1.700 $1.790
ELEC CONDR (NO.8) BARE
LF 25,145.000 $1.500 $1.790 $1.750 $1.750 $1.850
ELEC CONDR (NO.8) INSULATED
LF 73,620.000 $2.000 $1.950 $2.050 $2.050 $2.160
ELEC CONDR (NO.6) BARE
LF 4,215.000 $2.000 $2.050 $2.250 $2.250 $2.370
ELEC CONDR (NO.6) INSULATED
LF 3,605.000 $2.500 $2.260 $2.670 $2.670 $2.820
ELEC CONDR (NO.4) BARE
LF 1,525.000 $3.500 $3.310 $3.160 $3.150 $3.320
ELEC CONDR (NO.4) INSULATED
LF 3,390.000 $4.000 $3.840 $3.600 $3.600 $3.800
ELEC CONDR (NO.2) BARE
LF 805.000 $4.000 $4.260 $4.720 $4.720 $4.980
ELEC CONDR (NO.2) INSULATED
LF 1,610.000 $3.500 $4.570 $5.500 $5.500 $5.800
ELEC CONDR (1/0) BARE
LF 1,370.000 $4.500 $5.840 $8.100 $8.100 $8.540
ELEC CONDR (1/0) INSULATED
LF 2,740.000 $3.000 $5.940 $8.000 $8.000 $8.430
ELEC CONDR (2/0) BARE
LF 1,295.000 $2.000 $7.470 $8.300 $8.300 $8.750
ELEC CONDR (2/0) INSULATED
LF 2,540.000 $2.000 $8.410 $9.610 $9.610 $10.130
TRAY CABLE (3 CONDR) (12 AWG)
LF 4,775.000 $5.000 $5.890 $3.220 $3.220 $3.390
ITS GND BOX(PCAST) TY 1 (243636)
EA 2.000 $8,554.000 $4,836.570 $4,492.000 $4,492.000 $4,736.440
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 49.000 $3,979.000 $5,257.140 $4,666.000 $4,666.000 $4,919.900
ITS GND BOX(PCAST) TY 2 (366060)
EA 1.000 $7,424.000 $7,990.850 $8,903.000 $8,903.000 $9,387.450
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 7.000 $10,458.500 $7,990.850 $9,494.000 $9,494.000 $10,010.620
REMOVE ITS GROUND BOX
EA 18.000 $1,205.500 $1,577.140 $83.000 $483.000 $509.290
GROUND BOX TY A (122311)W/APRON
EA 3.000 $1,561.000 $1,014.630 $1,172.000 $1,172.000 $1,235.770
GROUND BOX TY C (162911)
EA 15.000 $2,000.000 $1,077.710 $1,085.000 $1,085.000 $1,144.040
GROUND BOX TY C (162911)W/APRON
EA 12.000 $2,044.500 $1,156.570 $1,206.000 $1,206.000 $1,271.630
GROUND BOX TY D (162922)
EA 13.000 $1,691.000 $1,077.710 $1,127.000 $1,127.000 $1,188.330
GROUND BOX TY D (162922)W/APRON
EA 71.000 $1,726.500 $1,261.710 $1,208.000 $1,208.000 $1,273.740
REMOVE GROUND BOX
EA 19.000 $328.500 $257.600 $483.000 $483.000 $509.290
REMOVE ELECTRICAL SERVICES
EA 5.000 $188.500 $946.290 $1,469.000 $1,469.000 $1,548.940
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
EA 5.000 $10,100.000 $9,988.570 $10,421.000 $10,421.000 $10,988.060
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $7,897.000 $7,044.570 $8,886.000 $8,886.000 $9,369.540
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
EA 1.000 $3,875.000 $5,046.850 $9,772.000 $9,772.000 $10,303.750
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 8.000 $8,634.500 $6,834.280 $8,016.000 $8,016.000 $8,452.190
ALUMINUM SIGNS (TY A)
SF 6.250 $44.000 $37.210 $36.080 $45.000 $47.450
ALUMINUM SIGNS (TY G)
SF 1,143.750 $44.000 $34.880 $32.350 $37.000 $39.010
ALUMINUM SIGNS (TY O)
SF 837.500 $44.000 $29.140 $32.770 $32.770 $36.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $850.000 $884.260 $725.000 $725.000 $975.330
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $1,030.000 $1,030.730 $825.000 $825.000 $1,064.960
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 18.000 $1,340.000 $1,150.070 $950.000 $950.000 $1,043.870
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $1,080.000 $938.500 $775.000 $775.000 $975.330
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $1,330.000 $1,150.080 $875.000 $875.000 $1,212.580
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $1,510.000 $1,372.500 $1,050.000 $1,050.000 $1,423.470
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,500.000 $1,529.820 $1,100.000 $1,100.000 $1,634.340
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 8.000 $1,290.000 $1,448.440 $1,250.000 $1,250.000 $1,845.220
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 12.000 $1,700.000 $1,377.920 $1,250.000 $1,250.000 $1,581.630
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 1.000 $1,200.000 $1,443.020 $1,000.000 $1,000.000 $1,607.990
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
EA 1.000 $1,300.000 $1,779.360 $1,250.000 $1,250.000 $1,792.510
IN SM RD SN SUP&AM TYS80(1)SB(U-WC)
EA 1.000 $2,160.000 $1,372.490 $1,250.000 $1,250.000 $1,607.990
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 5.000 $3,060.000 $2,587.670 $2,500.000 $2,500.000 $2,346.080
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 104.000 $710.000 $591.310 $425.000 $425.000 $822.440
IN SM RD SN SUP&AM TYTWT(1)UA(T)
EA 14.000 $840.000 $862.560 $475.000 $475.000 $1,001.700
IN SM RD SN SUP&AM TYTWT(1)UB(P)
EA 3.000 $980.000 $694.380 $425.000 $425.000 $938.430
IN SM RD SN SUP&AM TYTWT(1)UB(T)
EA 2.000 $1,130.000 $911.380 $475.000 $475.000 $1,054.410
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 6.000 $3,220.000 $2,354.400 $2,447.440 $1,814.000 $2,846.920
REMOVE SM RD SN SUP&AM
EA 149.000 $150.000 $119.350 $110.140 $125.000 $105.440
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $520.000 $1,204.330 $455.580 $2,500.000 $527.210
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
EA 12.000 $8,000.000 $4,063.240 $7,500.000 $6,500.000 $6,853.700
IN SRSS & AM (RAIL)(130 MPH)(T MOUNT)
EA 9.000 $8,300.000 $4,220.560 $5,297.470 $6,560.000 $6,916.970
IN SRSS & AM (RAIL)(130 MPH)(U MOUNT)
EA 5.000 $11,000.000 $7,453.790 $6,750.270 $7,150.000 $7,539.060
IN SRSS & AM (RAIL)(130 MPH)(U-BM MNT)
EA 4.000 $9,000.000 $4,437.550 $7,200.000 $7,150.000 $7,539.060
INSTALL LRSS (STRUCT STEEL)
LB 6,344.200 $8.500 $6.840 $6.380 $8.000 $8.430
RELOCATE LRSA
EA 1.000 $8,000.000 $8,875.100 $3,438.640 $5,000.000 $5,272.070
REMOVE LRSA
EA 14.000 $1,250.000 $797.460 $861.740 $2,000.000 $2,108.830
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $52,236.500 $41,524.920 $40,098.000 $40,098.000 $43,336.500
INS OH SN SUP(30 FT CANT)
EA 3.000 $45,000.000 $39,339.400 $39,079.000 $39,079.000 $41,649.430
INS OH SN SUP(35 FT CANT)
EA 3.000 $50,000.000 $38,298.670 $38,152.000 $38,152.000 $41,649.430
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 51.000 $80.000 $101.990 $150.000 $150.000 $99.120
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 208.000 $35.000 $48.820 $27.180 $45.000 $47.450
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $35.000 $48.820 $39.370 $45.000 $47.450
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 13.000 $90.000 $101.990 $85.470 $150.000 $99.120
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 197.000 $32.000 $48.820 $26.980 $45.000 $47.450
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 191.000 $32.000 $48.820 $4.980 $45.000 $47.450
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 6.000 $50.000 $48.820 $37.730 $45.000 $47.450
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 54.000 $85.000 $84.630 $150.000 $150.000 $82.250
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 9.000 $120.000 $100.900 $375.000 $80.000 $98.060
INSTL OM ASSM (OM-3R)(WFLX)GNDHH
EA 3.000 $250.000 $279.920 $375.000 $375.000 $272.040
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 11,700.000 $0.300 $0.590 $0.580 $0.290 $0.310
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 70,417.000 $0.250 $0.430 $0.420 $0.290 $0.310
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 846.000 $0.500 $2.040 $2.000 $0.550 $0.580
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 73,706.000 $0.250 $0.430 $0.420 $0.290 $0.310
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 687.000 $4.000 $7.650 $7.500 $4.000 $4.220
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 10,728.000 $6.500 $7.650 $7.500 $3.900 $4.110
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 69,100.000 $1.000 $0.450 $0.440 $0.800 $0.840
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 4,587.000 $1.000 $1.530 $1.500 $0.850 $0.900
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 362,059.000 $0.500 $0.450 $0.440 $0.800 $0.840
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 22,368.000 $1.000 $0.800 $0.780 $1.550 $1.630
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 4,379.000 $7.000 $9.690 $9.500 $4.000 $4.220
WK ZN PAV MRK REMOV (W)(ARROW)
EA 155.000 $112.500 $127.550 $125.000 $40.000 $42.170
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 26.000 $273.000 $765.310 $750.000 $850.000 $896.250
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 20.000 $273.000 $2,551.020 $2,500.000 $900.000 $948.970
WK ZN PAV MRK REMOV (W)(UTURN ARROW)
EA 9.000 $247.000 $306.120 $300.000 $100.000 $105.440
WK ZN PAV MRK REMOV (W)(WORD)
EA 92.000 $143.500 $178.570 $175.000 $60.000 $63.260
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 32.000 $90.000 $35.710 $35.000 $10.000 $10.540
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 356,529.000 $0.500 $0.450 $0.440 $0.800 $0.840
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 1,181.000 $14.500 $6.380 $6.250 $3.000 $3.160
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 3,388.000 $2.600 $1.000 $0.980 $0.580 $0.610
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,122.000 $1.800 $1.530 $1.500 $0.900 $0.950
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 31,372.000 $1.400 $0.900 $0.880 $0.860 $0.910
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 453.000 $7.600 $4.080 $4.000 $2.990 $3.150
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 4,122.000 $4.800 $1.680 $1.650 $2.590 $2.730
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,513.000 $9.000 $9.690 $9.500 $6.800 $7.170
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 59.000 $200.000 $122.450 $120.000 $150.000 $158.160
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $310.000 $301.020 $295.000 $190.000 $200.350
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 11.000 $350.000 $357.140 $350.000 $200.000 $210.890
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 2.000 $320.000 $306.120 $300.000 $200.000 $210.890
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 66.000 $230.000 $178.570 $175.000 $160.000 $168.710
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 19.000 $770.000 $484.690 $475.000 $290.000 $305.780
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 94.000 $60.000 $35.710 $35.000 $38.000 $40.070
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,561.000 $5.800 $2.040 $2.000 $3.000 $3.160
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 34,910.000 $1.600 $0.970 $0.950 $0.560 $0.590
PAVEMENT SLER 6"
LF 348,853.000 $0.280 $0.390 $0.380 $0.210 $0.220
PAVEMENT SLER 8"
LF 32,223.000 $0.350 $0.630 $0.620 $0.400 $0.420
PAVEMENT SLER 12"
LF 5,565.000 $1.090 $0.860 $0.840 $1.000 $1.050
PAVEMENT SLER 24"
LF 1,513.000 $1.080 $4.080 $4.000 $0.800 $0.840
PAVEMENT SLER (ARROW)
EA 59.000 $44.000 $25.510 $25.000 $15.000 $15.820
PAVEMENT SLER (WORD)
EA 66.000 $57.000 $35.710 $35.000 $15.000 $15.820
PAVEMENT SLER (DBL ARROW)
EA 2.000 $80.000 $35.720 $35.000 $20.000 $21.090
PAVEMENT SLER (UTURN ARROW)
EA 11.000 $84.000 $35.710 $35.000 $20.000 $21.090
PAVEMENT SLER (RR XING)
EA 7.000 $135.000 $76.530 $75.000 $35.000 $36.900
PAVEMENT SLER (YLD TRI)
EA 94.000 $23.000 $25.510 $25.000 $9.000 $9.490
PAVEMENT SLER (NUMBER)
EA 2.000 $62.000 $127.550 $125.000 $20.000 $21.090
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 52,050.000 $1.500 $1.000 $0.980 $0.540 $0.570
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 159,747.000 $0.750 $0.840 $0.820 $0.540 $0.570
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 156,976.000 $0.750 $0.840 $0.820 $0.540 $0.570
REFL PAV MRKR TY I-C
EA 112.000 $4.500 $12.240 $12.000 $4.000 $4.220
REFL PAV MRKR TY II-A-A
EA 130.000 $4.500 $12.240 $12.000 $4.000 $4.220
REFL PAV MRKR TY II-C-R
EA 4,871.000 $5.000 $7.650 $7.500 $3.900 $4.110
ELIM EXT PM & MRKS (4")
LF 146,602.000 $0.350 $0.360 $0.350 $0.510 $0.540
ELIM EXT PM & MRKS (6")
LF 44,594.000 $0.500 $0.410 $0.400 $0.570 $0.600
ELIM EXT PM & MRKS (8")
LF 6,416.000 $0.500 $0.710 $0.700 $0.650 $0.690
ELIM EXT PM & MRKS (12")
LF 200.000 $1.000 $5.100 $5.000 $1.750 $1.850
ELIM EXT PM & MRKS (24")
LF 715.000 $1.100 $6.630 $6.500 $2.700 $2.850
ELIM EXT PM & MRKS (ARROW)
EA 16.000 $100.000 $76.530 $75.000 $49.000 $51.660
ELIM EXT PM & MRKS (DBL ARROW)
EA 2.000 $120.000 $96.940 $95.000 $78.000 $82.250
ELIM EXT PM & MRKS (WORD)
EA 24.000 $90.000 $76.530 $75.000 $49.000 $51.660
ELIM EXT PM & MRKS (RR XING)
EA 3.000 $260.000 $408.160 $400.000 $100.000 $105.440
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 6.000 $35.000 $76.530 $75.000 $10.000 $10.540
PAV SURF PREP FOR MRK (6")
LF 348,853.000 $0.150 $0.100 $0.100 $0.180 $0.190
PAV SURF PREP FOR MRK (8")
LF 32,223.000 $0.200 $0.150 $0.150 $0.240 $0.250
PAV SURF PREP FOR MRK (12")
LF 5,565.000 $0.250 $0.260 $0.250 $0.400 $0.420
PAV SURF PREP FOR MRK (24")
LF 1,513.000 $0.300 $0.510 $0.500 $0.500 $0.530
PAV SURF PREP FOR MRK (ARROW)
EA 59.000 $23.000 $25.510 $25.000 $13.000 $13.710
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $34.000 $25.510 $25.000 $20.000 $21.100
PAV SURF PREP FOR MRK (UTURN ARR)
EA 11.000 $53.000 $25.510 $25.000 $20.000 $21.090
PAV SURF PREP FOR MRK (NUMBER)
EA 2.000 $84.000 $25.510 $25.000 $20.000 $21.090
PAV SURF PREP FOR MRK (WORD)
EA 66.000 $28.000 $25.510 $25.000 $13.000 $13.710
PAV SURF PREP FOR MRK (RR XING)
EA 7.000 $103.000 $25.510 $25.000 $30.000 $31.630
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 94.000 $16.000 $25.510 $25.000 $10.000 $10.540
PAV SURF PREP FOR MRK (RPM)
EA 5,113.000 $0.320 $1.020 $1.000 $0.500 $0.530
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $3,307.000 $39,428.550 $44,024.000 $44,024.000 $46,419.610
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $43,443.000 $36,905.130 $44,024.000 $44,024.000 $46,419.610
REMOVING TRAFFIC SIGNALS
EA 1.000 $5,734.000 $7,254.850 $7,547.000 $7,547.000 $7,957.680
TEMP TRAF SIGNALS
EA 1.000 $200,000.000 $133,005.660 $130,419.000 $130,419.000 $137,515.860
VEH SIG SEC (12")LED(GRN)
EA 45.000 $354.000 $325.940 $302.000 $302.000 $318.430
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $365.000 $325.940 $302.000 $302.000 $318.430
VEH SIG SEC (12")LED(YEL)
EA 45.000 $342.000 $325.940 $302.000 $302.000 $318.430
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $350.500 $325.940 $302.000 $302.000 $318.430
VEH SIG SEC (12")LED(RED)
EA 45.000 $345.500 $325.940 $302.000 $302.000 $318.430
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $330.000 $325.940 $302.000 $302.000 $318.430
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $793.000 $693.940 $846.000 $846.000 $892.040
LOUVER (12") (ADJUSTABLE)
EA 4.000 $324.000 $457.370 $463.000 $463.000 $488.200
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 49.000 $181.500 $178.740 $276.000 $276.000 $291.020
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 5,410.000 $2.000 $1.950 $2.200 $2.200 $2.320
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 6,245.000 $2.000 $1.950 $3.200 $3.200 $3.370
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 2,240.000 $2.500 $1.950 $3.650 $3.650 $3.850
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,180.000 $3.500 $5.570 $4.800 $4.800 $5.060
TRF SIG CBL (TY A)(12 AWG)(9 CONDR)
LF 5,705.000 $6.000 $5.570 $6.200 $6.200 $6.540
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 440.000 $6.300 $1.730 $7.150 $7.150 $7.540
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $12,196.500 $13,878.850 $12,383.000 $12,383.000 $13,056.830
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $14,503.500 $15,771.420 $14,091.000 $14,091.000 $14,857.780
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $15,569.000 $17,033.140 $15,057.000 $15,057.000 $15,876.350
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $31,472.000 $38,166.840 $30,677.000 $30,677.000 $32,346.320
INS TRF SIG PL AM(S)1 ARM(55')
EA 3.000 $37,000.000 $32,804.560 $29,142.000 $29,142.000 $30,727.790
INS TRF SIG PL AM(S)2 ARM(55-44')LUM
EA 1.000 $81,308.500 $47,629.690 $37,966.000 $37,966.000 $40,031.950
INS TRF SIG PL AM(S)2 ARM(60-44')LUM
EA 2.000 $42,220.000 $48,470.840 $38,824.000 $38,824.000 $40,936.640
INS TRF SIG PL AM(S)2 ARM(65-44')LUM
EA 1.000 $44,711.500 $49,732.550 $39,804.000 $39,804.000 $41,969.980
PED POLE ASSEMBLY
EA 11.000 $2,415.000 $2,628.570 $3,854.000 $3,854.000 $4,063.710
REMOVAL OF CABLES
LF 4,345.000 $1.500 $2.100 $1.050 $1.050 $1.110
INSTALL OF FOUNDATION (PEDESTAL POLE)
LF 1.000 $2,500.000 $2,628.570 $1,040.500 $1,040.500 $1,097.120
FULL - WIDTH MOWING
CYC 16.000 $6,489.500 $3,034.240 $4,817.820 $4,867.000 $16,000.000
LITTER REMOVAL
CYC 47.000 $4,923.000 $2,305.330 $1,200.000 $2,290.950 $16,000.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 47.000 $185.000 $1,553.830 $1,950.000 $1,982.920 $4,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 47.000 $1,969.500 $1,553.830 $1,950.000 $1,982.920 $4,000.000
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 127,741.000 $1.000 $0.910 $0.850 $0.850 $0.920
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 1.000 $128.500 $882.420 $87.050 $197.000 $535.650
BONDING COURSE
GAL 8,396.000 $3.500 $0.010 $0.010 $0.010 $0.010
NGCS GRINDING OF CONCRETE PAVEMENT
SY 245,111.000 $13.000 $5.220 $5.090 $4.900 $5.170
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $23,975.000 $13,668.570 $5,707.000 $5,707.000 $6,017.550
VIVDS PROSR SYS
EA 2.000 $24,250.000 $14,641.140 $11,333.000 $11,333.000 $11,949.690
VIVDS CNTRL SOFTWARE
EA 3.000 $7,333.500 $762.290 $971.000 $971.000 $1,023.840
VIVDS TEMPORARY
EA 1.000 $38,755.500 $14,719.990 $32,374.000 $32,374.000 $34,135.660
VIVDS CABLING
LF 7,130.000 $3.500 $2.310 $4.600 $4.600 $4.850
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 2.000 $9,624.500 $10,304.000 $10,770.000 $10,770.000 $11,356.050
RVDS (PRESENCE DETECTION ONLY)
EA 14.000 $8,920.500 $7,465.140 $6,273.000 $6,273.000 $6,614.340
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 5.000 $7,420.000 $8,096.000 $8,127.000 $8,127.000 $8,569.230
REMOVE ITS POLE (55 FT)
EA 2.000 $1,800.000 $1,892.570 $1,406.000 $1,406.000 $1,482.510
ITS POLE (50 FT)(110 MPH)
EA 6.000 $30,000.000 $19,556.560 $18,639.000 $18,639.000 $19,653.250
ITS RADIO(SNGL)(5 GHZ) I (O)
EA 1.000 $7,000.000 $5,888.000 $5,064.000 $5,064.000 $5,339.560
REMOVE ITS RADIO
EA 1.000 $600.000 $189.260 $725.000 $725.000 $764.450
CCTV FIELD EQUIPMENT (DIGITAL)
EA 8.000 $12,405.500 $11,040.000 $7,440.000 $7,440.000 $7,844.850
REMOVE CCTV FIELD EQUIPMENT
EA 2.000 $508.000 $257.600 $765.000 $765.000 $806.620
CCTV MOUNT (MAST)
EA 2.000 $871.000 $509.950 $663.000 $663.000 $699.070
ETHERNET SWITCH (INSTALL ONLY)
EA 5.000 $450.000 $331.200 $258.500 $258.500 $272.570
INSTALL OF ETHERNET SURGE PROTECT
EA 11.000 $410.000 $1,051.430 $243.500 $243.500 $256.750
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,722.000 $1,304.360 $10,733.340 $8,277.000 $6,431.930
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 5,135.000 $4.000 $4.210 $4.050 $4.050 $4.270
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 10.000 $1,646.500 $1,577.140 $250.000 $250.000 $263.610
FO SPLICE ENCLOSURE (TYPE 1)
EA 11.000 $2,034.000 $3,154.280 $1,850.000 $1,850.000 $1,950.670
FIBER OPTIC CBL (SNGL-MODE)(72 FIBER)
LF 27,915.000 $3.000 $5.890 $3.150 $3.150 $3.320
FIBER OPTIC PATCH PANEL (72 POSITION)
EA 2.000 $10.000 $6,834.290 $1,624.000 $1,624.000 $1,712.370
LOOP INSTALLATION
LF 800.000 $13.000 $16.820 $17.630 $17.300 $18.240
SENSOR INSTALLATION
EA 4.000 $2,000.000 $2,229.030 $2,500.000 $4,500.000 $15,816.230
COAXIAL CABLE
LF 725.000 $4.000 $4.630 $6.300 $6.300 $6.640
REMOVE EXIST GND MT COMM CABINET
EA 1.000 $4,080.500 $1,997.710 $1,573.000 $1,573.000 $1,658.590
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 2.000 $25,323.000 $14,194.280 $11,621.000 $11,621.000 $12,253.360
ITS GRND MNT CAB (TY 5)(CONF 2)
EA 3.000 $17,290.000 $16,402.280 $13,627.000 $13,627.000 $14,368.510
REMOVE DMS
EA 1.000 $12,000.000 $13,142.850 $11,808.000 $11,808.000 $12,450.550
ETHERNET/FIBER MEDIA CONVERTER (SM)
EA 11.000 $2,509.000 $3,785.140 $1,794.000 $1,794.000 $1,891.610
LCS SIGNAL UNIT (REMOVE)
EA 6.000 $9,900.000 $2,418.290 $202.000 $202.000 $213.000
Totals: $226,858,175.990 $205,813,980.812 $217,055,849.043 $223,527,274.981 $274,867,526.392
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $226,856.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $500,000.00
MATERIAL FURNISHED BY THE STATE (NON-PART) $320,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $1,500,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,800,000.00
Total: $4,346,856.00