PREPARING ROW
|
STA
|
416.000
|
$2,500.000
|
$550.000
|
$150.000
|
$525.950
|
$5,908.470
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
565.000
|
$15.000
|
$34.000
|
$30.000
|
$17.000
|
$28.910
|
|
|
RMV (6") TRT/UNTRT BASE & ASPH PAV
|
CY
|
24,649.000
|
$12.000
|
$22.000
|
$11.000
|
$9.100
|
$12.550
|
|
|
EXCAV (ROADWAY)
|
CY
|
24,649.000
|
$22.000
|
$10.000
|
$8.000
|
$11.400
|
$21.090
|
|
|
SUBGR WIDEN (DC)
|
STA
|
416.000
|
$950.000
|
$2,500.000
|
$200.000
|
$638.250
|
$1,049.660
|
|
|
EMBANK (FNL)(DC)(TY D)
|
CY
|
35,949.000
|
$13.000
|
$6.500
|
$10.000
|
$11.400
|
$22.110
|
|
|
BLADING
|
HR
|
36.000
|
$240.000
|
$160.000
|
$175.000
|
$103.500
|
$229.760
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
AC
|
81.200
|
$800.000
|
$550.000
|
$510.000
|
$509.710
|
$509.710
|
|
|
DRILL SEED (TEMP_WARM)
|
AC
|
81.200
|
$500.000
|
$420.000
|
$375.000
|
$378.310
|
$378.310
|
|
|
PROOF ROLLING
|
HR
|
85.000
|
$80.000
|
$140.000
|
$75.000
|
$80.500
|
$85.530
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
79,693.000
|
$90.000
|
$85.000
|
$90.000
|
$89.240
|
$69.090
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
3,669.000
|
$405.000
|
$325.000
|
$300.000
|
$319.000
|
$306.360
|
|
|
LIME TRT (EXIST MATL)(6")
|
SY
|
252,943.000
|
$2.500
|
$4.500
|
$2.000
|
$2.130
|
$5.040
|
|
|
PRIME COAT (MC-30)
|
GAL
|
47,816.000
|
$8.000
|
$5.000
|
$4.000
|
$4.540
|
$4.650
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
58,424.000
|
$107.000
|
$98.000
|
$115.000
|
$105.400
|
$116.000
|
|
|
D-GR HMA TY-C SAC-A PG76-22
|
TON
|
26,431.000
|
$132.000
|
$120.000
|
$135.000
|
$123.000
|
$151.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
3,866.000
|
$250.000
|
$138.000
|
$135.000
|
$109.900
|
$150.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
13,234.000
|
$6.000
|
$4.600
|
$2.500
|
$1.550
|
$9.440
|
|
|
PLANE ASPH CONC PAV(4")
|
SY
|
147,894.000
|
$4.000
|
$2.600
|
$1.250
|
$2.530
|
$2.900
|
|
|
STRUCT EXCAV
|
CY
|
196.000
|
$50.000
|
$90.000
|
$50.000
|
$25.000
|
$42.850
|
|
|
CEM STABIL BKFL
|
CY
|
392.000
|
$245.000
|
$325.000
|
$200.000
|
$240.000
|
$321.030
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
459.000
|
$15.000
|
$15.000
|
$20.000
|
$16.000
|
$24.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
7,595.000
|
$25.000
|
$20.000
|
$12.000
|
$52.000
|
$18.020
|
|
|
CL C CONC (COLLAR)
|
EA
|
26.000
|
$450.000
|
$1,500.000
|
$1,500.000
|
$750.000
|
$2,420.840
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
176.100
|
$650.000
|
$620.000
|
$625.000
|
$690.000
|
$611.160
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
100.000
|
$50.000
|
$75.600
|
$100.000
|
$120.000
|
$90.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
325.000
|
$1,200.000
|
$770.000
|
$825.000
|
$1,000.000
|
$1,326.630
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
26.000
|
$1,600.000
|
$1,100.000
|
$1,300.000
|
$1,800.000
|
$2,621.260
|
|
|
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
|
LF
|
155.000
|
$1,900.000
|
$1,275.000
|
$1,300.000
|
$1,600.000
|
$1,693.990
|
|
|
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
|
LF
|
60.000
|
$2,000.000
|
$1,400.000
|
$1,800.000
|
$2,200.000
|
$3,637.130
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
495.000
|
$125.000
|
$125.000
|
$115.000
|
$150.000
|
$170.690
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
39.000
|
$200.000
|
$200.000
|
$250.000
|
$310.000
|
$397.980
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
34.000
|
$300.000
|
$220.000
|
$300.000
|
$200.000
|
$278.630
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
8.000
|
$12,500.000
|
$8,500.000
|
$10,000.000
|
$9,000.000
|
$12,740.160
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
5.000
|
$13,125.000
|
$10,000.000
|
$12,000.000
|
$11,500.000
|
$13,301.170
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1)(C)
|
EA
|
11.000
|
$20,000.000
|
$10,500.000
|
$12,000.000
|
$15,000.000
|
$12,485.150
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
1.000
|
$13,500.000
|
$9,500.000
|
$24,000.000
|
$24,000.000
|
$18,933.700
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
1.000
|
$14,000.000
|
$9,000.000
|
$26,000.000
|
$30,000.000
|
$18,933.700
|
|
|
SET (TY I)(S= 9 FT)(HW= 6 FT)(3:1)(C)
|
EA
|
1.000
|
$25,000.000
|
$8,000.000
|
$24,000.000
|
$23,000.000
|
$21,010.530
|
|
|
SET (TY I)(S= 9 FT)(HW= 6 FT)(4:1)(C)
|
EA
|
11.000
|
$32,000.000
|
$17,500.000
|
$11,000.000
|
$13,000.000
|
$17,950.500
|
|
|
SET (TY I)(S= 9 FT)(HW= 9 FT)(3:1)(C)
|
EA
|
10.000
|
$35,000.000
|
$21,500.000
|
$12,000.000
|
$15,000.000
|
$18,018.500
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$2,300.000
|
$3,500.000
|
$3,100.000
|
$3,060.590
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$1,800.000
|
$2,300.000
|
$2,500.000
|
$3,400.000
|
$3,060.590
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
20.000
|
$2,000.000
|
$2,800.000
|
$2,250.000
|
$4,800.000
|
$3,060.590
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,800.000
|
$4,500.000
|
$4,250.000
|
$5,800.000
|
$4,372.280
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$2,400.000
|
$4,000.000
|
$4,800.000
|
$5,465.350
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$2,000.000
|
$7,500.000
|
$3,000.000
|
$1,000.000
|
$6,498.650
|
|
|
REMOV STR (SET)
|
EA
|
48.000
|
$500.000
|
$2,800.000
|
$2,000.000
|
$1,600.000
|
$1,706.890
|
|
|
REMOV STR (PIPE)
|
LF
|
208.000
|
$25.000
|
$40.000
|
$20.000
|
$18.000
|
$40.450
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,462,912.160
|
$1,222,000.000
|
$3,000,000.000
|
$3,155,574.290
|
$3,515,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,000.000
|
$3,000.000
|
$5,000.000
|
$2,970.010
|
$17,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$35,000.000
|
$10,000.000
|
$7,582.500
|
$18,295.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,200.000
|
$250.000
|
$300.000
|
$150.000
|
$151.650
|
$315.350
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$500.000
|
$750.000
|
$150.000
|
$505.500
|
$912.570
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
468.000
|
$73.000
|
$150.000
|
$100.000
|
$145.990
|
$145.990
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
468.000
|
$14.500
|
$29.000
|
$15.000
|
$27.190
|
$27.190
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$40.000
|
$64.000
|
$25.000
|
$60.950
|
$60.950
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$10.000
|
$18.000
|
$10.000
|
$16.860
|
$16.860
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
74.000
|
$150.000
|
$180.000
|
$125.000
|
$92.000
|
$114.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,964.000
|
$6.000
|
$7.000
|
$6.000
|
$6.520
|
$6.520
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,964.000
|
$1.000
|
$2.000
|
$2.000
|
$1.190
|
$1.910
|
|
|
CONSTRUCTING DETOURS
|
SY
|
64,078.000
|
$70.000
|
$44.000
|
$40.000
|
$52.600
|
$26.090
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
190.000
|
$100.000
|
$86.000
|
$40.000
|
$92.000
|
$42.640
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,130.000
|
$100.000
|
$190.000
|
$175.000
|
$92.000
|
$136.430
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
18,360.000
|
$34.000
|
$20.000
|
$15.000
|
$12.000
|
$19.590
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
74,640.000
|
$10.000
|
$5.700
|
$6.000
|
$12.000
|
$4.360
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
18,360.000
|
$34.000
|
$19.000
|
$15.000
|
$12.000
|
$19.990
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
68.000
|
$60.000
|
$170.000
|
$50.000
|
$35.000
|
$205.450
|
|
|
DRIVEWAYS (CONC)
|
SY
|
583.000
|
$103.000
|
$110.000
|
$175.000
|
$100.000
|
$109.630
|
|
|
DRIVEWAYS (ACP)
|
SY
|
605.000
|
$65.000
|
$100.000
|
$50.000
|
$49.500
|
$63.430
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,537.000
|
$30.000
|
$54.000
|
$20.000
|
$40.500
|
$34.190
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
84,280.000
|
$0.270
|
$0.250
|
$0.100
|
$0.060
|
$0.230
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
42,140.000
|
$0.270
|
$0.250
|
$0.100
|
$0.070
|
$0.260
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
67.000
|
$1,300.000
|
$1,325.000
|
$650.000
|
$1,225.000
|
$1,225.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
47.000
|
$1,000.000
|
$950.000
|
$550.000
|
$875.000
|
$875.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
47.000
|
$10,000.000
|
$8,400.000
|
$7,000.000
|
$7,825.000
|
$7,825.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
317.000
|
$50.000
|
$24.000
|
$22.000
|
$22.000
|
$22.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$704.000
|
$1,000.000
|
$925.000
|
$925.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$704.000
|
$1,100.000
|
$1,075.000
|
$1,075.000
|
$1,075.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$704.000
|
$1,250.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$840.000
|
$1,700.000
|
$1,550.000
|
$1,550.000
|
$1,550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$100.000
|
$135.000
|
$125.000
|
$125.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
10.000
|
$110.000
|
$135.000
|
$125.000
|
$125.000
|
$125.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
46.000
|
$90.000
|
$125.000
|
$115.000
|
$115.000
|
$115.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
52.000
|
$20.000
|
$27.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
4,644.000
|
$2.000
|
$5.000
|
$4.000
|
$3.500
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
54,096.000
|
$2.000
|
$0.600
|
$1.500
|
$0.560
|
$0.560
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
789.000
|
$1.500
|
$2.200
|
$2.180
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$250.000
|
$325.000
|
$325.000
|
$300.000
|
$300.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
174,240.000
|
$0.300
|
$0.280
|
$0.250
|
$0.260
|
$0.260
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
5,280.000
|
$1.000
|
$1.200
|
$1.200
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
84,480.000
|
$1.000
|
$0.600
|
$0.600
|
$0.550
|
$0.550
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
84,480.000
|
$0.750
|
$0.600
|
$0.600
|
$0.550
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
264.000
|
$5.500
|
$10.000
|
$10.000
|
$9.500
|
$9.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,056.000
|
$5.000
|
$8.000
|
$8.000
|
$7.500
|
$7.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
5.000
|
$4,000.000
|
$5,000.000
|
$3,000.000
|
$7,500.000
|
$4,890.030
|
|
|
BONDING COURSE
|
GAL
|
46,892.000
|
$5.000
|
$1.000
|
$3.500
|
$3.090
|
$4.000
|
|
|
TRAIL MNT SOL PRD RAD SPEED CNT MONITOR
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$12,000.000
|
$8,500.000
|
$8,294.000
|
|
Totals: |
$37,681,960.560
|
$31,130,076.400
|
$31,277,983.020
|
$32,740,581.894
|
$35,959,325.020
|