REMOVING CONC (RIPRAP)
|
SY
|
524.000
|
$15.000
|
$20.000
|
$22.000
|
$14.330
|
$35.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
10.000
|
$200.000
|
$200.000
|
$550.000
|
$267.730
|
$380.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
407.000
|
$20.000
|
$20.000
|
$25.000
|
$14.650
|
$28.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
21.000
|
$15.000
|
$20.000
|
$25.000
|
$60.380
|
$180.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
3,715.000
|
$10.000
|
$5.000
|
$10.000
|
$12.920
|
$12.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
246.000
|
$20.000
|
$20.000
|
$25.000
|
$27.480
|
$45.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
6.000
|
$35.000
|
$100.000
|
$100.000
|
$25.420
|
$100.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
456.000
|
$15.000
|
$20.000
|
$25.000
|
$8.970
|
$16.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
2,712.000
|
$2.500
|
$3.000
|
$5.000
|
$4.420
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
2,712.000
|
$6.000
|
$5.000
|
$8.000
|
$2.970
|
$8.000
|
|
|
VEGETATIVE WATERING
|
MG
|
42.310
|
$30.000
|
$100.000
|
$250.000
|
$35.840
|
$200.000
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
4.000
|
$120.000
|
$1,000.000
|
$400.000
|
$301.950
|
$800.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
35.000
|
$100.000
|
$100.000
|
$79.000
|
$23.970
|
$100.000
|
|
|
CL A CONC (MISC)
|
CY
|
1.100
|
$600.000
|
$2,000.000
|
$2,000.000
|
$2,068.860
|
$2,500.000
|
|
|
CL C CONC (MISC)
|
CY
|
3.800
|
$800.000
|
$2,000.000
|
$1,500.000
|
$999.210
|
$2,800.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
1,739.000
|
$80.000
|
$50.000
|
$60.000
|
$21.470
|
$120.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
95.700
|
$450.000
|
$1,000.000
|
$750.000
|
$477.560
|
$500.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
41.000
|
$80.000
|
$100.000
|
$150.000
|
$58.240
|
$180.000
|
|
|
GRATE & FRAME
|
EA
|
15.000
|
$1,500.000
|
$2,000.000
|
$1,200.000
|
$1,127.280
|
$2,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
6.000
|
$900.000
|
$500.000
|
$500.000
|
$2,936.600
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$125,637.000
|
$350,000.000
|
$200,000.000
|
$210,000.000
|
$480,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$2,200.000
|
$4,000.000
|
$1,500.000
|
$8,650.480
|
$24,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
4,000.000
|
$5.000
|
$1.000
|
$0.100
|
$9.390
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,000.000
|
$3.000
|
$3.000
|
$0.100
|
$3.650
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,000.000
|
$1.000
|
$1.000
|
$0.100
|
$1.200
|
$0.500
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
86.000
|
$50.000
|
$100.000
|
$115.000
|
$48.760
|
$220.000
|
|
|
CONC CURB (TY II)
|
LF
|
113.000
|
$22.000
|
$20.000
|
$35.000
|
$33.550
|
$55.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
7.000
|
$20.000
|
$50.000
|
$45.000
|
$53.680
|
$67.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,878.000
|
$24.000
|
$35.000
|
$40.000
|
$22.240
|
$43.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
561.000
|
$70.000
|
$70.000
|
$85.000
|
$75.930
|
$216.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
354.000
|
$60.000
|
$50.000
|
$65.000
|
$54.950
|
$160.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,656.000
|
$53.000
|
$65.000
|
$125.000
|
$86.800
|
$114.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
172.000
|
$120.000
|
$65.000
|
$125.000
|
$140.670
|
$360.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
1,090.000
|
$120.000
|
$65.000
|
$125.000
|
$86.900
|
$210.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
1,387.000
|
$120.000
|
$65.000
|
$125.000
|
$250.000
|
$190.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
24.000
|
$120.000
|
$65.000
|
$125.000
|
$109.270
|
$460.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
906.000
|
$120.000
|
$65.000
|
$125.000
|
$146.740
|
$250.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
416.000
|
$120.000
|
$65.000
|
$125.000
|
$157.880
|
$280.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
714.000
|
$120.000
|
$65.000
|
$125.000
|
$131.570
|
$230.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
195.000
|
$120.000
|
$65.000
|
$125.000
|
$327.530
|
$450.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
4.000
|
$200.000
|
$500.000
|
$125.000
|
$253.790
|
$100.000
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$200.000
|
$100.000
|
$150.000
|
$298.780
|
$300.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
500.000
|
$18.000
|
$20.000
|
$15.000
|
$13.710
|
$50.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
50.000
|
$3.000
|
$10.000
|
$2.000
|
$4.750
|
$3.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
93.000
|
$600.000
|
$500.000
|
$550.000
|
$759.200
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
58.000
|
$100.000
|
$100.000
|
$50.000
|
$375.170
|
$175.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,200.000
|
$1,000.000
|
$250.000
|
$904.360
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
115.000
|
$350.000
|
$200.000
|
$150.000
|
$419.380
|
$425.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$150.000
|
$100.000
|
$750.000
|
$128.160
|
$100.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
45.000
|
$2.000
|
$4.000
|
$5.000
|
$2.080
|
$5.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,446.000
|
$4.000
|
$5.500
|
$5.000
|
$3.530
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,285.000
|
$6.000
|
$9.000
|
$9.000
|
$5.860
|
$7.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
16.000
|
$35.000
|
$50.000
|
$50.000
|
$100.650
|
$60.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
25.000
|
$6.000
|
$14.000
|
$15.000
|
$7.310
|
$15.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
96.000
|
$0.400
|
$1.000
|
$1.000
|
$0.400
|
$2.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
45.000
|
$0.800
|
$2.000
|
$1.250
|
$0.600
|
$2.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
3,446.000
|
$0.900
|
$1.500
|
$1.250
|
$2.310
|
$1.700
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,310.000
|
$1.800
|
$4.000
|
$3.800
|
$3.890
|
$3.300
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
16.000
|
$5.000
|
$6.000
|
$15.000
|
$22.180
|
$22.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
20.000
|
$1.000
|
$3.000
|
$5.000
|
$0.670
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
76.000
|
$1.000
|
$3.000
|
$2.500
|
$0.810
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
215.000
|
$1.000
|
$2.000
|
$2.500
|
$0.880
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
125.000
|
$1.250
|
$2.000
|
$2.000
|
$1.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,815.000
|
$2.000
|
$2.500
|
$2.250
|
$1.510
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
2,114.000
|
$2.500
|
$2.500
|
$2.500
|
$4.020
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
96.000
|
$0.200
|
$0.300
|
$0.250
|
$0.540
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
45.000
|
$0.400
|
$0.400
|
$0.300
|
$0.810
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,446.000
|
$0.600
|
$0.500
|
$0.300
|
$1.060
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,310.000
|
$1.000
|
$0.600
|
$0.400
|
$1.610
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
16.000
|
$20.000
|
$0.700
|
$25.000
|
$21.690
|
$30.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
160.000
|
$3.000
|
$10.000
|
$2.000
|
$1.960
|
$3.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$1,100.000
|
$2,000.000
|
$3,500.000
|
$2,561.920
|
$2,500.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
20,000.000
|
$2.000
|
$0.500
|
$0.100
|
$9.390
|
$15.000
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
2.000
|
$350.000
|
$500.000
|
$250.000
|
$442.860
|
$1,000.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$200.000
|
$500.000
|
$150.000
|
$268.400
|
$150.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
106.000
|
$100.000
|
$50.000
|
$50.000
|
$74.080
|
$50.000
|
|
|
INSTALL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
106.000
|
$400.000
|
$200.000
|
$250.000
|
$106.270
|
$400.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
5.000
|
$350.000
|
$500.000
|
$450.000
|
$872.300
|
$2,200.000
|
|
Totals: |
$1,693,999.150
|
$1,680,038.500
|
$2,046,450.800
|
$2,298,873.356
|
$3,809,805.700
|