REMOVING CONC (RIPRAP)
|
CY
|
6.000
|
$150.000
|
$76.160
|
$8.860
|
$250.000
|
$95.570
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
21.000
|
$30.000
|
$75.000
|
$52.930
|
$35.000
|
$127.430
|
|
|
BACKFILL (TY A)
|
STA
|
39.000
|
$145.000
|
$224.000
|
$156.600
|
$450.000
|
$509.710
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
7.000
|
$400.000
|
$615.000
|
$508.590
|
$550.000
|
$764.560
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
151.000
|
$450.000
|
$475.000
|
$517.740
|
$550.000
|
$637.130
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
145.000
|
$500.000
|
$485.000
|
$543.910
|
$550.000
|
$637.130
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,895.000
|
$20.000
|
$45.000
|
$33.480
|
$50.000
|
$51.570
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
720.000
|
$180.000
|
$135.000
|
$155.140
|
$150.000
|
$254.850
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
2,900.000
|
$100.000
|
$87.000
|
$89.950
|
$125.000
|
$102.690
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
562.000
|
$200.000
|
$130.000
|
$155.470
|
$185.000
|
$254.850
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$8,000.000
|
$7,500.000
|
$8,746.800
|
$14,000.000
|
$11,340.970
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$9,000.000
|
$9,000.000
|
$10,049.510
|
$15,000.000
|
$12,105.530
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
4.000
|
$10,000.000
|
$10,500.000
|
$10,751.330
|
$16,000.000
|
$12,742.660
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
3.000
|
$10,000.000
|
$10,250.000
|
$11,628.810
|
$16,500.000
|
$15,291.190
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
12.000
|
$14,000.000
|
$11,005.000
|
$11,905.220
|
$17,000.000
|
$17,839.730
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
18.000
|
$16,000.000
|
$11,500.000
|
$12,276.690
|
$17,500.000
|
$20,388.260
|
|
|
SET (TY I)(S= 7 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
11.000
|
$18,000.000
|
$12,250.000
|
$13,187.320
|
$18,000.000
|
$22,936.790
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
6.000
|
$17,000.000
|
$11,125.000
|
$15,146.240
|
$18,500.000
|
$24,848.190
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
1.000
|
$19,000.000
|
$14,939.470
|
$20,357.860
|
$19,000.000
|
$25,485.320
|
|
|
SET (TY I)(S= 8 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
2.000
|
$20,000.000
|
$16,500.000
|
$20,920.160
|
$25,000.000
|
$31,856.660
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
3.000
|
$2,500.000
|
$2,000.000
|
$3,149.940
|
$5,000.000
|
$6,371.330
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$2,500.000
|
$2,500.000
|
$2,790.220
|
$1,500.000
|
$2,563.350
|
|
|
REMOV STR (WINGWALL)
|
EA
|
20.000
|
$2,000.000
|
$621.600
|
$1,171.890
|
$2,500.000
|
$1,840.790
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,000.000
|
$842.800
|
$2,008.950
|
$2,500.000
|
$1,769.040
|
|
|
REMOV STR (PIPE)
|
LF
|
6.000
|
$100.000
|
$76.150
|
$1.120
|
$30.000
|
$25.400
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
417.000
|
$100.000
|
$67.080
|
$61.380
|
$150.000
|
$86.750
|
|
|
REMOVE STR (GABION)
|
LF
|
30.000
|
$100.000
|
$24.550
|
$117.190
|
$250.000
|
$118.760
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$210,000.000
|
$220,000.000
|
$164,000.000
|
$360,000.000
|
$401,393.870
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$5,000.000
|
$5,000.000
|
$2,790.220
|
$8,500.000
|
$19,113.990
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
915.000
|
$48.000
|
$25.000
|
$49.670
|
$30.000
|
$106.070
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
915.000
|
$12.500
|
$15.000
|
$21.210
|
$15.000
|
$34.510
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
819.000
|
$24.500
|
$15.000
|
$24.550
|
$30.000
|
$19.660
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
819.000
|
$9.000
|
$8.000
|
$13.390
|
$15.000
|
$7.650
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
21.000
|
$70.000
|
$25.000
|
$112.260
|
$150.000
|
$191.140
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
660.000
|
$2.250
|
$5.350
|
$5.580
|
$4.000
|
$5.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
660.000
|
$0.650
|
$2.400
|
$2.510
|
$2.000
|
$1.270
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
384.000
|
$90.000
|
$101.850
|
$137.120
|
$150.000
|
$191.140
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$5,000.000
|
$4,000.000
|
$4,464.340
|
$5,000.000
|
$12,742.660
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,500.000
|
$90.000
|
$30.000
|
$30.870
|
$100.000
|
$82.830
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,940.000
|
$12.000
|
$15.000
|
$8.510
|
$20.000
|
$31.860
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,500.000
|
$15.000
|
$25.000
|
$8.760
|
$20.000
|
$31.860
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,125.000
|
$20.000
|
$22.430
|
$23.400
|
$25.000
|
$25.230
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$2,000.000
|
$1,481.470
|
$1,545.280
|
$1,850.000
|
$1,834.940
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,150.000
|
$3.000
|
$1.150
|
$1.210
|
$3.000
|
$1.400
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$250.000
|
$215.070
|
$224.340
|
$500.000
|
$254.850
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
12.000
|
$200.000
|
$379.850
|
$396.210
|
$500.000
|
$286.710
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,700.000
|
$3,017.980
|
$3,147.980
|
$2,850.000
|
$3,236.640
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$250.000
|
$401.250
|
$418.530
|
$1,000.000
|
$477.850
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$750.000
|
$665.000
|
$552.460
|
$5,000.000
|
$1,363.460
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$500.000
|
$875.000
|
$419.650
|
$2,500.000
|
$879.240
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$7,000.000
|
$7,500.000
|
$7,696.530
|
$12,500.000
|
$10,894.980
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
16.000
|
$100.000
|
$6.680
|
$83.710
|
$100.000
|
$95.570
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
85.000
|
$30.000
|
$2.510
|
$55.800
|
$100.000
|
$63.710
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,920.000
|
$3.300
|
$3.210
|
$3.350
|
$15.000
|
$4.700
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,422.000
|
$0.660
|
$0.640
|
$0.670
|
$2.000
|
$1.340
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
192.000
|
$6.000
|
$8.560
|
$8.930
|
$20.000
|
$5.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
51,200.000
|
$1.000
|
$0.640
|
$0.670
|
$1.000
|
$1.020
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,280.000
|
$1.000
|
$0.160
|
$1.670
|
$5.000
|
$4.740
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,378.000
|
$0.300
|
$0.530
|
$0.560
|
$1.000
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
35,022.000
|
$0.300
|
$0.530
|
$0.520
|
$1.000
|
$1.150
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
17,511.000
|
$0.500
|
$0.500
|
$0.520
|
$1.000
|
$1.150
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
960.000
|
$10.000
|
$8.560
|
$8.930
|
$4.000
|
$3.820
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$10,000.000
|
$7,254.560
|
$16,500.000
|
$9,557.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
960.000
|
$10.000
|
$14.980
|
$15.630
|
$2.000
|
$25.490
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$250.000
|
$175.000
|
$156.250
|
$250.000
|
$509.710
|
|
Totals: |
$2,790,115.020
|
$2,347,169.080
|
$2,418,596.800
|
$3,581,955.000
|
$4,043,914.210
|