PREPARING ROW
|
STA
|
245.900
|
$600.000
|
$500.000
|
$70.000
|
$296.660
|
$70.050
|
$899.540
|
$520.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,541.000
|
$7.000
|
$16.000
|
$6.500
|
$8.510
|
$10.320
|
$10.730
|
$15.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
245.900
|
$600.000
|
$500.000
|
$265.000
|
$267.590
|
$145.580
|
$537.290
|
$530.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
2,539.000
|
$10.000
|
$4.000
|
$9.500
|
$6.300
|
$26.170
|
$19.710
|
$15.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
16.940
|
$650.000
|
$800.000
|
$1,200.000
|
$868.000
|
$827.690
|
$929.840
|
$915.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
16.940
|
$750.000
|
$600.000
|
$900.000
|
$644.000
|
$724.230
|
$782.970
|
$800.000
|
|
|
PROOF ROLLING
|
HR
|
16.000
|
$85.000
|
$100.000
|
$70.000
|
$84.000
|
$96.550
|
$291.190
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
15,230.000
|
$26.000
|
$38.000
|
$75.000
|
$72.550
|
$63.130
|
$81.570
|
$95.000
|
|
|
CEMENT
|
TON
|
701.000
|
$160.000
|
$210.000
|
$325.000
|
$181.070
|
$183.130
|
$204.780
|
$340.000
|
|
|
CEMENT TREAT (NEW BASE 14")
|
SY
|
38,700.000
|
$2.750
|
$5.600
|
$1.500
|
$4.450
|
$15.250
|
$4.900
|
$3.500
|
|
|
PRIME COAT (RC-250)
|
GAL
|
7,650.000
|
$4.000
|
$5.000
|
$3.850
|
$3.900
|
$5.170
|
$6.730
|
$4.800
|
|
|
ASPH (AC-15P)
|
GAL
|
68,185.000
|
$3.250
|
$4.000
|
$3.200
|
$3.180
|
$3.880
|
$3.060
|
$3.300
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
319.000
|
$100.000
|
$125.000
|
$120.000
|
$177.050
|
$104.600
|
$60.720
|
$150.000
|
|
|
AGGR(TY-PD GR-3 SAC-B)
|
CY
|
1,671.000
|
$100.000
|
$110.000
|
$100.000
|
$100.100
|
$133.620
|
$95.080
|
$130.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
13.000
|
$160.000
|
$175.000
|
$200.000
|
$196.000
|
$129.930
|
$243.410
|
$198.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
756.000
|
$20.000
|
$30.000
|
$40.000
|
$33.600
|
$22.760
|
$21.950
|
$26.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
3.000
|
$900.000
|
$1,750.000
|
$1,500.000
|
$1,960.000
|
$1,600.400
|
$1,292.110
|
$2,175.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
31.000
|
$425.000
|
$455.000
|
$600.000
|
$476.000
|
$402.140
|
$487.120
|
$650.000
|
|
|
RAIL (TY T631)
|
LF
|
87.000
|
$85.000
|
$82.000
|
$150.000
|
$87.360
|
$98.190
|
$96.100
|
$90.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
|
LF
|
50.000
|
$740.000
|
$1,550.000
|
$1,450.000
|
$1,736.000
|
$2,100.460
|
$1,457.040
|
$3,000.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
59.400
|
$120.000
|
$120.000
|
$150.000
|
$134.400
|
$105.560
|
$167.120
|
$240.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
27.000
|
$120.000
|
$180.000
|
$200.000
|
$201.600
|
$144.490
|
$141.730
|
$590.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$29,500.000
|
$35,000.000
|
$49,000.000
|
$39,200.000
|
$39,000.000
|
$56,322.490
|
$55,800.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$7,500.000
|
$7,500.000
|
$11,500.000
|
$8,400.000
|
$14,000.000
|
$9,760.930
|
$11,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$8,500.000
|
$8,000.000
|
$13,000.000
|
$8,960.000
|
$14,000.000
|
$13,722.130
|
$19,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
3.000
|
$9,000.000
|
$8,000.000
|
$14,500.000
|
$14,000.000
|
$14,000.000
|
$16,412.860
|
$25,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$10,000.000
|
$12,500.000
|
$11,000.000
|
$14,000.000
|
$14,000.000
|
$13,507.160
|
$5,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$2,400.000
|
$2,200.000
|
$3,250.000
|
$2,464.000
|
$4,000.000
|
$1,880.880
|
$3,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$2,200.000
|
$3,500.000
|
$2,464.000
|
$4,000.000
|
$1,849.540
|
$3,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$2,450.000
|
$3,200.000
|
$3,500.000
|
$3,584.000
|
$4,500.000
|
$2,896.810
|
$4,200.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$850.000
|
$420.000
|
$1,000.000
|
$470.400
|
$474.780
|
$581.340
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,050.000
|
$2,200.000
|
$1,500.000
|
$1,736.000
|
$569.430
|
$1,415.010
|
$2,550.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,050.000
|
$1,800.000
|
$500.000
|
$1,736.000
|
$569.430
|
$1,359.850
|
$1,700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$221,527.340
|
$300,000.000
|
$200,000.000
|
$299,500.000
|
$167,000.000
|
$397,930.660
|
$571,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$3,500.000
|
$1,500.000
|
$3,000.000
|
$7,280.000
|
$1,559.160
|
$12,244.020
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
314.000
|
$50.000
|
$45.000
|
$20.000
|
$48.720
|
$67.250
|
$64.930
|
$74.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
314.000
|
$15.000
|
$28.000
|
$5.000
|
$29.680
|
$20.690
|
$9.230
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$22.000
|
$28.000
|
$15.000
|
$30.520
|
$31.040
|
$24.230
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$13.000
|
$18.000
|
$3.000
|
$19.320
|
$10.350
|
$9.220
|
$10.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
52.000
|
$90.000
|
$72.000
|
$75.000
|
$39.200
|
$65.180
|
$70.370
|
$175.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,031.000
|
$2.750
|
$2.500
|
$4.000
|
$2.690
|
$3.620
|
$2.410
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,031.000
|
$0.850
|
$1.250
|
$1.000
|
$1.340
|
$0.520
|
$0.740
|
$0.500
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
160.000
|
$90.000
|
$108.000
|
$70.000
|
$71.540
|
$57.560
|
$68.580
|
$75.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,120.000
|
$70.000
|
$168.000
|
$120.000
|
$115.410
|
$74.120
|
$67.340
|
$105.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$3,800.000
|
$7,330.000
|
$4,200.000
|
$4,704.000
|
$8,780.220
|
$5,742.610
|
$5,600.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
420.000
|
$30.000
|
$60.000
|
$50.000
|
$46.090
|
$36.370
|
$112.620
|
$39.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
420.000
|
$8.500
|
$7.000
|
$15.000
|
$46.090
|
$5.930
|
$5.860
|
$11.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
420.000
|
$18.000
|
$25.000
|
$25.000
|
$46.090
|
$9.850
|
$8.600
|
$23.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
848.000
|
$18.000
|
$40.000
|
$25.000
|
$33.470
|
$20.690
|
$51.050
|
$38.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$20.000
|
$24.000
|
$25.000
|
$22.270
|
$21.000
|
$21.130
|
$34.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$2.000
|
$3.000
|
$2.000
|
$1.400
|
$1.000
|
$2.730
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$320.000
|
$130.000
|
$250.000
|
$140.000
|
$150.000
|
$241.310
|
$230.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$3,020.000
|
$2,500.000
|
$3,024.000
|
$2,941.330
|
$2,678.010
|
$3,300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,350.000
|
$3,060.000
|
$1,500.000
|
$1,500.800
|
$775.960
|
$1,443.210
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$4,150.000
|
$790.000
|
$500.000
|
$448.000
|
$400.000
|
$852.760
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,725.000
|
$9,150.000
|
$10,000.000
|
$10,304.000
|
$6,466.320
|
$8,394.470
|
$9,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$520.000
|
$520.000
|
$650.000
|
$532.000
|
$698.360
|
$519.890
|
$565.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$90.000
|
$94.000
|
$50.000
|
$67.200
|
$82.770
|
$91.600
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
16.000
|
$80.000
|
$90.000
|
$100.000
|
$91.000
|
$93.120
|
$103.400
|
$97.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$20.000
|
$7.350
|
$20.000
|
$5.600
|
$20.690
|
$24.680
|
$8.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$25.000
|
$21.000
|
$40.000
|
$35.000
|
$36.210
|
$30.400
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
150.000
|
$4.400
|
$5.250
|
$5.500
|
$5.320
|
$5.170
|
$6.120
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,364.000
|
$0.580
|
$0.800
|
$1.400
|
$1.400
|
$1.290
|
$0.910
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
80.000
|
$7.500
|
$8.400
|
$88.000
|
$8.960
|
$8.280
|
$9.800
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,000.000
|
$0.650
|
$0.800
|
$1.400
|
$1.400
|
$1.290
|
$0.910
|
$0.840
|
|
|
PAVEMENT SEALER 4"
|
LF
|
66,773.000
|
$0.150
|
$0.120
|
$0.250
|
$0.250
|
$0.230
|
$0.130
|
$0.120
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
49,172.000
|
$1.000
|
$0.650
|
$0.710
|
$0.730
|
$0.670
|
$0.730
|
$0.680
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
13,089.000
|
$1.200
|
$0.650
|
$0.710
|
$0.730
|
$0.670
|
$0.730
|
$0.680
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
4,512.000
|
$0.800
|
$0.650
|
$0.710
|
$0.730
|
$0.670
|
$0.730
|
$0.680
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
406.000
|
$2.750
|
$4.200
|
$5.000
|
$5.040
|
$4.660
|
$4.900
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
940.000
|
$0.450
|
$1.400
|
$1.000
|
$1.120
|
$1.030
|
$1.630
|
$1.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$11,280.000
|
$5,000.000
|
$9,520.000
|
$620.770
|
$6,122.010
|
$11,500.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
2,258.000
|
$4.400
|
$8.000
|
$10.250
|
$10.640
|
$9.830
|
$9.100
|
$8.500
|
|
|
TMA (STATIONARY)
|
DAY
|
140.000
|
$195.000
|
$160.000
|
$175.000
|
$224.000
|
$20.690
|
$306.100
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
180.000
|
$80.000
|
$24.000
|
$30.000
|
$78.400
|
$41.380
|
$91.830
|
$230.000
|
|
Totals: |
$2,458,000.360
|
$3,148,791.360
|
$3,274,659.180
|
$3,489,125.835
|
$3,566,701.926
|
$3,986,023.666
|
$4,507,049.700
|