PREPARING ROW
|
STA
|
278.000
|
$70,000.000
|
$66,800.000
|
$70,000.000
|
$19,500.000
|
|
|
REMOV CONC (PAV)
|
SY
|
122,869.000
|
$10.000
|
$8.000
|
$8.000
|
$5.590
|
|
|
REMOV CONC (RIPRAP)
|
CY
|
10,718.000
|
$55.000
|
$7.000
|
$20.000
|
$17.180
|
|
|
RMV (4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
126,163.000
|
$3.000
|
$3.500
|
$3.000
|
$1.720
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
95,031.000
|
$8.000
|
$6.000
|
$6.000
|
$3.770
|
|
|
EXCAV (ROADWAY)
|
CY
|
330,027.000
|
$15.000
|
$19.000
|
$9.000
|
$8.360
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
744,615.000
|
$20.000
|
$13.000
|
$5.000
|
$15.900
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
115,931.000
|
$90.000
|
$50.000
|
$150.000
|
$117.350
|
|
|
EMBANK (FNL)(DC)(TY C2)
|
CY
|
317,835.000
|
$16.000
|
$17.000
|
$8.000
|
$20.120
|
|
|
BACKFILL (TY B)
|
STA
|
350.200
|
$200.000
|
$2,000.000
|
$1,250.000
|
$351.570
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
5,000.000
|
$6.000
|
$3.000
|
$2.500
|
$0.850
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
50,000.000
|
$0.330
|
$0.250
|
$0.150
|
$0.100
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
904,631.000
|
$0.250
|
$0.250
|
$0.150
|
$0.120
|
|
|
DRILL SEED (TEMP_WARM)
|
SY
|
452,315.500
|
$0.200
|
$0.250
|
$0.100
|
$0.070
|
|
|
DRILL SEED (TEMP_COOL)
|
SY
|
452,315.500
|
$0.200
|
$0.250
|
$0.100
|
$0.070
|
|
|
VEGETATIVE WATERING
|
TGL
|
7,625.800
|
$35.000
|
$25.000
|
$44.000
|
$50.620
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
5,000.000
|
$4.000
|
$1.000
|
$0.900
|
$1.500
|
|
|
FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS)
|
CY
|
53,491.000
|
$105.000
|
$65.000
|
$115.000
|
$112.920
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
2,960.000
|
$360.000
|
$350.000
|
$400.000
|
$335.690
|
|
|
LIME TRT (EXIST MATL)(6")
|
SY
|
179,677.000
|
$2.000
|
$2.500
|
$3.500
|
$4.340
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
51,283.000
|
$7.000
|
$4.000
|
$4.500
|
$4.340
|
|
|
CEMENT
|
TON
|
2,960.000
|
$224.000
|
$220.000
|
$125.000
|
$185.130
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
179,677.000
|
$2.500
|
$2.500
|
$1.000
|
$2.530
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
51,283.000
|
$5.500
|
$4.000
|
$2.000
|
$2.530
|
|
|
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
|
SY
|
349,085.000
|
$18.000
|
$6.000
|
$15.300
|
$17.820
|
|
|
ASPHALT TRT BASE (GR 4)(PG 64)
|
TON
|
19,269.000
|
$130.000
|
$146.300
|
$138.000
|
$131.250
|
|
|
SALV HAUL & STKPL RCL APH PV (6")
|
SY
|
221,194.000
|
$6.000
|
$3.990
|
$3.600
|
$2.200
|
|
|
PRIME COAT (MC-30)
|
GAL
|
24,653.000
|
$8.000
|
$5.280
|
$5.500
|
$5.250
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
32,879.000
|
$4.000
|
$4.620
|
$3.850
|
$3.680
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
1,080.000
|
$130.000
|
$151.250
|
$238.000
|
$226.800
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
22,978.000
|
$115.000
|
$128.000
|
$140.000
|
$133.350
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
2,439.000
|
$95.000
|
$132.000
|
$143.000
|
$136.500
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
25,700.000
|
$130.000
|
$139.000
|
$161.000
|
$153.300
|
|
|
TACK COAT
|
GAL
|
21,305.000
|
$5.000
|
$3.740
|
$3.650
|
$3.470
|
|
|
CONC PVMT (CRCP) (10")
|
SY
|
106,629.000
|
$120.000
|
$60.000
|
$73.000
|
$79.600
|
|
|
CONC PVMT (CRCP) (14")
|
SY
|
227,535.000
|
$125.000
|
$60.000
|
$85.000
|
$111.010
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,963.000
|
$200.000
|
$120.000
|
$154.000
|
$176.780
|
|
|
CEM STABIL BKFL
|
CY
|
15,883.000
|
$161.000
|
$75.000
|
$91.250
|
$112.360
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,218.000
|
$13.000
|
$2.000
|
$20.000
|
$10.920
|
|
|
TEMPORARY SPL SHORING
|
SF
|
98,730.000
|
$30.000
|
$10.000
|
$2.250
|
$0.520
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
10.000
|
$25,000.000
|
$50,000.000
|
$20,000.000
|
$50,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
465.000
|
$150.000
|
$150.000
|
$178.000
|
$82.210
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
25.000
|
$245.000
|
$160.000
|
$175.000
|
$223.090
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,664.000
|
$300.000
|
$200.000
|
$187.000
|
$202.460
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
20,406.000
|
$300.000
|
$300.000
|
$229.000
|
$279.120
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
744.000
|
$315.000
|
$350.000
|
$310.000
|
$402.790
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
792.000
|
$1,250.000
|
$1,200.000
|
$1,310.000
|
$1,557.210
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
35.000
|
$115.000
|
$125.000
|
$131.000
|
$125.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
950.000
|
$400.000
|
$458.000
|
$478.000
|
$550.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
40.000
|
$605.000
|
$617.000
|
$624.000
|
$500.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
137.000
|
$1,100.000
|
$1,158.000
|
$960.000
|
$700.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
200.000
|
$250.000
|
$293.000
|
$224.000
|
$230.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
16.000
|
$1,233.000
|
$2,627.000
|
$2,500.000
|
$3,208.560
|
|
|
CL C CONC (ABUT)
|
CY
|
1,253.200
|
$1,250.000
|
$1,300.000
|
$1,500.000
|
$928.150
|
|
|
CL C CONC (CAP)
|
CY
|
1,138.500
|
$1,400.000
|
$900.000
|
$1,500.000
|
$1,199.970
|
|
|
CL C CONC (COLUMN)
|
CY
|
595.800
|
$1,500.000
|
$1,900.000
|
$1,500.000
|
$914.270
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
225.000
|
$800.000
|
$400.000
|
$828.000
|
$606.350
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
337.660
|
$750.000
|
$1,500.000
|
$2,250.000
|
$2,194.900
|
|
|
CL C CONC (MISC)
|
CY
|
426.000
|
$2,000.000
|
$2,249.000
|
$2,000.000
|
$1,621.980
|
|
|
CL F CONC (CAP)
|
CY
|
161.800
|
$2,500.000
|
$1,500.000
|
$2,000.000
|
$1,284.060
|
|
|
CL F CONC (COLUMN)
|
CY
|
270.000
|
$1,650.000
|
$1,200.000
|
$2,000.000
|
$1,858.850
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
117.600
|
$650.000
|
$1,400.000
|
$1,500.000
|
$1,079.810
|
|
|
REINF CONC SLAB
|
SF
|
299,688.000
|
$24.000
|
$20.000
|
$23.750
|
$20.770
|
|
|
APPROACH SLAB
|
CY
|
2,115.710
|
$625.000
|
$500.000
|
$800.000
|
$549.220
|
|
|
SHEAR KEY
|
CY
|
372.900
|
$1,000.000
|
$500.000
|
$425.000
|
$218.450
|
|
|
RET WALL (MSE) (HORIZONTAL SCHEME)
|
SF
|
195,749.000
|
$50.000
|
$40.000
|
$37.000
|
$39.190
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
120,622.000
|
$14.000
|
$20.000
|
$0.750
|
$16.830
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
15,788.520
|
$200.000
|
$100.000
|
$165.000
|
$166.750
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
992.500
|
$220.000
|
$105.000
|
$167.000
|
$191.470
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
16,233.660
|
$230.000
|
$125.000
|
$192.000
|
$200.390
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
1,193.160
|
$443.000
|
$160.000
|
$234.000
|
$244.890
|
|
|
PRESTR CONC BOX BEAM (4B28)
|
LF
|
6,439.500
|
$250.000
|
$140.000
|
$265.000
|
$283.440
|
|
|
PRESTR CONC BOX BEAM (5B28)
|
LF
|
715.500
|
$300.000
|
$150.000
|
$265.000
|
$281.600
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
565.650
|
$700.000
|
$650.000
|
$675.000
|
$407.570
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
4.000
|
$745.000
|
$650.000
|
$1,000.000
|
$609.020
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
243.000
|
$550.000
|
$650.000
|
$685.000
|
$602.340
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
208.000
|
$226.000
|
$250.000
|
$450.000
|
$263.940
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
13,166.000
|
$200.000
|
$200.000
|
$250.000
|
$226.350
|
|
|
RAIL (TY SSTR)
|
LF
|
23,952.600
|
$60.000
|
$60.000
|
$88.000
|
$54.140
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
84.000
|
$131.000
|
$150.000
|
$193.000
|
$115.260
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,695.000
|
$200.000
|
$175.000
|
$229.000
|
$183.690
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
216.000
|
$120.000
|
$114.200
|
$118.000
|
$127.830
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,338.000
|
$416.000
|
$349.100
|
$331.000
|
$331.830
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
535.000
|
$525.000
|
$370.950
|
$923.000
|
$349.190
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
1,094.000
|
$604.000
|
$394.800
|
$379.000
|
$384.570
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
3,328.000
|
$850.000
|
$433.250
|
$424.000
|
$434.850
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
110.000
|
$844.000
|
$566.100
|
$524.000
|
$517.610
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
774.000
|
$870.000
|
$732.400
|
$671.000
|
$696.720
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
640.000
|
$747.000
|
$606.900
|
$570.000
|
$585.970
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
1,488.000
|
$824.000
|
$629.350
|
$613.000
|
$615.180
|
|
|
CONC BOX CULV (9 FT X 4 FT)
|
LF
|
656.000
|
$871.000
|
$767.450
|
$750.000
|
$717.810
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
3,085.000
|
$1,344.000
|
$917.500
|
$861.000
|
$861.240
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
1,690.000
|
$1,000.000
|
$1,007.100
|
$969.000
|
$949.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,833.000
|
$93.000
|
$115.500
|
$119.000
|
$59.080
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,754.000
|
$130.000
|
$90.650
|
$119.000
|
$66.600
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$10,000.000
|
$3,754.000
|
$5,580.000
|
$4,140.870
|
|
|
INLET (COMPL)(PMBD)(5FT)
|
EA
|
47.000
|
$7,000.000
|
$9,058.000
|
$6,920.000
|
$6,416.710
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
32.000
|
$7,710.000
|
$11,241.000
|
$16,250.000
|
$10,503.660
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
8.000
|
$12,000.000
|
$7,159.000
|
$10,310.000
|
$7,077.450
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$50,000.000
|
$114,559.000
|
$49,500.000
|
$57,998.130
|
|
|
SET (PIPE RUNNER)
|
EA
|
217.000
|
$2,500.000
|
$737.000
|
$2,050.000
|
$1,588.130
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
3.000
|
$7,872.000
|
$13,291.000
|
$21,060.000
|
$3,428.010
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
3.000
|
$12,500.000
|
$13,586.000
|
$18,710.000
|
$3,428.010
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
6.000
|
$9,000.000
|
$16,999.000
|
$17,320.000
|
$3,266.610
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
3.000
|
$4,000.000
|
$14,929.000
|
$18,600.000
|
$3,360.520
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
3.000
|
$12,800.000
|
$14,683.000
|
$18,120.000
|
$3,360.520
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
6.000
|
$14,560.000
|
$13,044.000
|
$13,260.000
|
$1,993.950
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
22.000
|
$16,800.000
|
$11,751.000
|
$11,810.000
|
$1,925.580
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
4.000
|
$12,000.000
|
$15,833.000
|
$15,670.000
|
$3,062.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
14.000
|
$14,200.000
|
$14,170.000
|
$18,060.000
|
$3,097.830
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
2.000
|
$2,500.000
|
$56,427.000
|
$21,670.000
|
$6,124.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
5.000
|
$13,100.000
|
$14,619.000
|
$16,070.000
|
$2,951.740
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
5.000
|
$21,529.000
|
$17,072.000
|
$16,070.000
|
$2,951.740
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
12.000
|
$13,206.000
|
$18,308.000
|
$13,970.000
|
$3,375.560
|
|
|
SET (TY I)(S= 9 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
8.000
|
$17,000.000
|
$24,800.000
|
$18,150.000
|
$4,631.430
|
|
|
SET (TY I)(S= 10 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
24.000
|
$25,000.000
|
$26,410.000
|
$18,430.000
|
$4,840.780
|
|
|
SET (TY I)(S= 10 FT)(HW= 8 FT)(3:1)(C)
|
EA
|
5.000
|
$30,000.000
|
$22,059.000
|
$19,790.000
|
$5,526.260
|
|
|
SET (TY I)(S= 10 FT)(HW= 8 FT)(4:1)(C)
|
EA
|
5.000
|
$30,000.000
|
$27,612.000
|
$19,790.000
|
$5,526.260
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
35.000
|
$1,396.000
|
$2,470.000
|
$1,700.000
|
$2,084.290
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
23.000
|
$1,300.000
|
$2,948.000
|
$1,770.000
|
$2,334.730
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,150.000
|
$2,642.000
|
$1,790.000
|
$2,350.720
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,990.000
|
$3,313.000
|
$1,970.000
|
$3,128.670
|
|
|
SET (TY II) (24 IN) (TP) (4: 1) (C)
|
EA
|
5.000
|
$2,000.000
|
$2,642.000
|
$1,800.000
|
$2,537.210
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (C)
|
EA
|
6.000
|
$4,000.000
|
$4,039.000
|
$3,080.000
|
$2,393.340
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
8.000
|
$7,000.000
|
$31,616.000
|
$36,080.000
|
$26,375.790
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
8.000
|
$100,000.000
|
$25,000.000
|
$1.000
|
$53,853.260
|
|
|
REMOVE STR (RAIL)
|
LF
|
2,828.000
|
$29.000
|
$10.000
|
$1.000
|
$27.800
|
|
|
REMOV STR (PIPE)
|
EA
|
37.000
|
$3,000.000
|
$3,479.000
|
$2,000.000
|
$1,033.860
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$26,000,000.000
|
$20,372,874.000
|
$20,000,000.000
|
$19,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
32.000
|
$7,500.000
|
$20,000.000
|
$3,660.000
|
$14,073.700
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
10.000
|
$14,000.000
|
$1,000.000
|
$6,000.000
|
$9,591.280
|
|
|
TMA (STATIONARY)
|
DAY
|
210.000
|
$200.000
|
$100.000
|
$424.000
|
$235.320
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
100.000
|
$250.000
|
$200.000
|
$838.000
|
$620.700
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
8,160.000
|
$35.000
|
$32.000
|
$36.000
|
$42.690
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
8,160.000
|
$17.000
|
$12.000
|
$12.600
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,981.000
|
$5.000
|
$3.000
|
$3.550
|
$2.780
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,981.000
|
$1.250
|
$1.000
|
$0.800
|
$0.990
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,711.000
|
$5.000
|
$7.000
|
$5.250
|
$5.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,711.000
|
$1.500
|
$1.000
|
$1.100
|
$0.990
|
|
|
CONSTRUCTING DETOURS
|
SY
|
46,179.000
|
$60.000
|
$150.000
|
$130.000
|
$115.100
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
13,501.000
|
$15.000
|
$7.000
|
$10.000
|
$11.860
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
860.000
|
$18.000
|
$30.000
|
$25.000
|
$7.500
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$26.000
|
$30.000
|
$30.000
|
$11.860
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
44,615.000
|
$9.000
|
$6.000
|
$2.100
|
$6.020
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,500.000
|
$8.000
|
$7.000
|
$20.000
|
$5.550
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$10.000
|
$7.000
|
$20.000
|
$5.690
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$17.000
|
$20.000
|
$25.000
|
$14.830
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$23.000
|
$20.000
|
$30.000
|
$9.730
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
13,501.000
|
$28.000
|
$9.000
|
$10.000
|
$5.700
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
860.000
|
$13.000
|
$10.000
|
$25.000
|
$7.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$19.000
|
$10.000
|
$30.000
|
$7.950
|
|
|
PCTB (STKPL)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,035.000
|
$20.000
|
$10.000
|
$10.000
|
$9.510
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,725.000
|
$74.000
|
$60.000
|
$156.000
|
$63.780
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
13,845.000
|
$149.000
|
$90.000
|
$104.000
|
$80.980
|
|
|
PERM CTB(SS)(42")(HEB)(RGD PVM)
|
LF
|
966.000
|
$265.000
|
$90.000
|
$628.000
|
$206.130
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
285.000
|
$34.000
|
$29.570
|
$42.000
|
$44.180
|
|
|
CONC CURB (SLOTTED)
|
LF
|
373.000
|
$28.000
|
$37.660
|
$25.000
|
$36.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
189.000
|
$130.000
|
$250.000
|
$119.000
|
$137.280
|
|
|
DRIVEWAYS (ACP) (TY 1)
|
SY
|
657.000
|
$33.000
|
$110.000
|
$71.250
|
$91.130
|
|
|
DRIVEWAYS (BASE)
|
SY
|
837.000
|
$25.000
|
$55.000
|
$42.250
|
$42.230
|
|
|
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
|
LF
|
1,790.000
|
$3.500
|
$5.000
|
$20.000
|
$6.080
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
432.000
|
$28.000
|
$29.280
|
$29.300
|
$29.280
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,322.000
|
$3.000
|
$3.250
|
$3.250
|
$3.250
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
21,752.000
|
$4.500
|
$4.520
|
$4.500
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,650.000
|
$3,644.000
|
$3,640.000
|
$3,650.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$321.000
|
$275.000
|
$275.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
38.000
|
$1,526.000
|
$3,800.000
|
$3,800.000
|
$3,800.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
5.000
|
$1,140.000
|
$3,200.000
|
$3,200.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
15.000
|
$935.000
|
$1,800.000
|
$1,800.000
|
$1,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
26.000
|
$32,500.000
|
$23,550.000
|
$23,550.000
|
$23,550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
15.000
|
$9,000.000
|
$9,750.000
|
$9,750.000
|
$9,750.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
9,824.000
|
$20.000
|
$30.000
|
$63.750
|
$33.250
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
2.000
|
$850.000
|
$2,099.000
|
$500.000
|
$450.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
3.000
|
$3,700.000
|
$1,071.500
|
$1,850.000
|
$1,800.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
27.000
|
$5,000.000
|
$4,571.000
|
$4,580.000
|
$4,850.000
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
5.000
|
$101,300.000
|
$50,812.000
|
$55,200.000
|
$52,000.000
|
|
|
LED HI MST IL ASM (6 FIXT) (TY A)
|
EA
|
5.000
|
$30,000.000
|
$41,577.000
|
$37,320.000
|
$43,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
320.000
|
$12.000
|
$9.200
|
$10.100
|
$9.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
24,450.000
|
$14.000
|
$8.100
|
$16.600
|
$12.500
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
10,550.000
|
$14.500
|
$13.750
|
$10.700
|
$10.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,607.000
|
$25.000
|
$19.240
|
$14.700
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
6,120.000
|
$25.000
|
$32.930
|
$28.800
|
$30.000
|
|
|
CONDT (RM) (1")
|
LF
|
500.000
|
$35.000
|
$19.200
|
$22.200
|
$18.000
|
|
|
CONDT (RM) (3")
|
LF
|
2,980.000
|
$63.000
|
$64.600
|
$96.000
|
$48.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
24,450.000
|
$24.000
|
$16.150
|
$24.700
|
$17.500
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
4,800.000
|
$27.000
|
$42.470
|
$41.500
|
$58.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
4,300.000
|
$106.000
|
$87.210
|
$109.000
|
$140.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
36.000
|
$158.000
|
$245.240
|
$120.000
|
$750.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
17,210.000
|
$1.000
|
$1.500
|
$0.750
|
$1.500
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
4,872.000
|
$1.200
|
$1.900
|
$1.500
|
$1.800
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
9,774.000
|
$1.500
|
$2.000
|
$1.600
|
$1.900
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,645.000
|
$1.900
|
$1.800
|
$2.150
|
$2.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,530.000
|
$2.250
|
$2.110
|
$2.400
|
$2.400
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
7,075.000
|
$2.200
|
$2.530
|
$2.600
|
$2.550
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
14,180.000
|
$2.600
|
$3.000
|
$2.900
|
$2.750
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,195.000
|
$3.000
|
$3.200
|
$3.400
|
$2.900
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
2,740.000
|
$3.400
|
$3.640
|
$3.750
|
$3.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
34.000
|
$4,600.000
|
$4,576.000
|
$5,110.000
|
$4,900.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
1.000
|
$8,719.000
|
$8,296.000
|
$7,850.000
|
$6,500.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
57.000
|
$1,500.000
|
$1,209.000
|
$965.000
|
$950.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)GC(U)
|
EA
|
3.000
|
$13,000.000
|
$11,042.000
|
$8,110.000
|
$9,000.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
2.000
|
$9,010.000
|
$11,762.000
|
$8,010.000
|
$9,200.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
1.000
|
$7,770.000
|
$6,773.000
|
$6,910.000
|
$8,888.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
2.000
|
$6,524.000
|
$6,830.000
|
$7,110.000
|
$8,900.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
35.000
|
$35.000
|
$36.000
|
$10.700
|
$10.650
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
382.000
|
$30.000
|
$31.500
|
$38.250
|
$38.140
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,110.000
|
$35.000
|
$33.000
|
$26.200
|
$28.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
118.000
|
$925.000
|
$510.000
|
$510.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
10.000
|
$627.000
|
$575.000
|
$575.000
|
$575.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
56.000
|
$935.000
|
$660.000
|
$660.000
|
$660.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,023.000
|
$710.000
|
$710.000
|
$710.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$940.000
|
$850.000
|
$840.000
|
$840.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$110.000
|
$175.000
|
$125.000
|
$125.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,006.000
|
$7.000
|
$8.540
|
$10.600
|
$10.550
|
|
|
REMOVE LRSA
|
EA
|
6.000
|
$350.000
|
$1,950.000
|
$250.000
|
$250.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$45,000.000
|
$56,928.000
|
$65,200.000
|
$56,000.000
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$21,000.000
|
$23,872.000
|
$26,620.000
|
$22,000.000
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
11.000
|
$32,000.000
|
$29,671.000
|
$27,150.000
|
$27,400.000
|
|
|
SIGN WALKWAY (36 IN) NO HNDRL
|
LF
|
31.000
|
$338.000
|
$538.000
|
$397.000
|
$580.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
199.000
|
$11.000
|
$22.000
|
$22.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
44.000
|
$20.000
|
$22.000
|
$22.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
174.000
|
$19.000
|
$22.000
|
$22.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
|
EA
|
5.000
|
$19.000
|
$22.000
|
$22.000
|
$22.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$125.000
|
$130.000
|
$130.000
|
$130.000
|
|
|
INSTL OM ASSM (OM-4)(TWT)WAS
|
EA
|
8.000
|
$298.000
|
$295.000
|
$295.000
|
$295.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
70,703.000
|
$1.150
|
$1.500
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
3,274.000
|
$1.600
|
$2.000
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
88,519.000
|
$0.800
|
$0.770
|
$0.750
|
$0.770
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
148.000
|
$15.000
|
$8.500
|
$8.500
|
$8.500
|
|
|
WK ZN PAV MRK REMOV (W)(EXIT GORE)
|
EA
|
3.000
|
$1,222.000
|
$450.000
|
$450.000
|
$450.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
101,751.000
|
$0.800
|
$0.780
|
$0.800
|
$0.780
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
10,941.000
|
$7.500
|
$1.400
|
$1.400
|
$1.400
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
43,386.000
|
$4.000
|
$0.950
|
$0.950
|
$0.950
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
6,949.000
|
$5.500
|
$1.000
|
$1.000
|
$1.000
|
|
RE PM TY III (W)(6")(DOT)
|
LF
|
1,866.000
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
14,152.000
|
$1.100
|
$1.500
|
$1.500
|
$1.500
|
|
RE PM TY III (W)(8")(DOT)
|
LF
|
516.000
|
$1.100
|
$2.000
|
$2.000
|
$2.000
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
2,295.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
41,283.000
|
$4.000
|
$0.950
|
$0.950
|
$0.950
|
|
RE PM TY III (Y)(12")(SLD)
|
LF
|
116.000
|
$5.500
|
$4.000
|
$4.000
|
$4.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
|
LF
|
48,425.000
|
$1.000
|
$0.950
|
$0.950
|
$0.950
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
10,941.000
|
$1.000
|
$0.950
|
$0.950
|
$0.950
|
|
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
|
LF
|
50,704.000
|
$0.600
|
$0.950
|
$0.950
|
$0.950
|
|
|
PAVEMENT SLER 6"
|
LF
|
131,509.000
|
$1.000
|
$0.400
|
$0.400
|
$0.400
|
|
|
PAVEMENT SLER 8"
|
LF
|
14,421.000
|
$0.350
|
$0.800
|
$0.800
|
$0.800
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
387.000
|
$14.000
|
$16.850
|
$16.900
|
$16.850
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
5.000
|
$223.000
|
$230.000
|
$230.000
|
$230.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
5.000
|
$414.000
|
$445.000
|
$445.000
|
$445.000
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
1.000
|
$332.000
|
$475.000
|
$475.000
|
$475.000
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
2.000
|
$550.000
|
$640.000
|
$640.000
|
$640.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
5.000
|
$294.000
|
$350.000
|
$350.000
|
$350.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
72.000
|
$4.500
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
307.000
|
$4.500
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,496.000
|
$5.000
|
$6.000
|
$6.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
173,426.000
|
$0.450
|
$0.450
|
$0.450
|
$0.450
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
74.000
|
$5.000
|
$4.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
4.000
|
$60.000
|
$55.000
|
$55.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
214,495.000
|
$0.250
|
$0.060
|
$0.050
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
14,668.000
|
$0.300
|
$0.120
|
$0.100
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,411.000
|
$0.320
|
$0.180
|
$0.200
|
$0.180
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
387.000
|
$1.000
|
$0.360
|
$0.350
|
$0.360
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
5.000
|
$80.000
|
$7.000
|
$7.000
|
$7.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
5.000
|
$160.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
1.000
|
$25.000
|
$15.000
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$20.000
|
$7.000
|
$7.000
|
$7.000
|
|
|
REMOVE (QUAD - ELITE) NARROW
|
EA
|
1.000
|
$23.000
|
$1,800.000
|
$1,020.000
|
$1,650.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
27,405.000
|
$940.000
|
$940.000
|
$525.000
|
$940.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
40.000
|
$8,500.000
|
$8,000.000
|
$7,500.000
|
$4,250.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$11,712.000
|
$9,006.000
|
$10,000.000
|
$14,000.000
|
|
|
ITS RVSD SYSTEM (DATA COLLECTION ONLY)
|
EA
|
3.000
|
$11,272.000
|
$12,034.000
|
$12,720.000
|
$9,500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
3.000
|
$6,800.000
|
$7,650.000
|
$6,980.000
|
$7,500.000
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
3.000
|
$20,645.000
|
$23,170.000
|
$23,360.000
|
$26,300.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
24.000
|
$111.000
|
$84.500
|
$84.500
|
$84.500
|
|
|
GROUND BOX (PREPARE)
|
EA
|
1.000
|
$341.000
|
$494.000
|
$100.000
|
$2,500.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
4.000
|
$15,064.000
|
$19,035.000
|
$16,500.000
|
$19,035.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
3.000
|
$990.000
|
$7,601.000
|
$2,250.000
|
$2,200.000
|
|
|
CCTV MOUNT (PEDESTAL)
|
EA
|
3.000
|
$390.000
|
$1,041.000
|
$100.000
|
$850.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
5.000
|
$454.000
|
$408.000
|
$500.000
|
$1,200.000
|
|
|
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
|
LF
|
26,640.000
|
$2.700
|
$2.230
|
$1.650
|
$3.750
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
11.000
|
$1,100.000
|
$700.000
|
$2,300.000
|
$2,800.000
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
23,130.000
|
$3.750
|
$4.250
|
$4.000
|
$5.800
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITIONS)
|
EA
|
2.000
|
$5,000.000
|
$4,651.250
|
$5,890.000
|
$12,000.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
2.000
|
$574.000
|
$2,013.000
|
$1,390.000
|
$6,500.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
4,230.000
|
$20.000
|
$18.250
|
$5.000
|
$18.250
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
3.000
|
$722.000
|
$778.000
|
$625.000
|
$1,800.000
|
|
|
INSTALLATION OF TERMINAL SERVER
|
EA
|
3.000
|
$1,000.000
|
$331.000
|
$625.000
|
$1,400.000
|
|
|
ITS GRND MNT CAB (TY 6)(CONF 2)
|
EA
|
1.000
|
$16,111.000
|
$15,184.000
|
$17,990.000
|
$18,000.000
|
|
|
REMOVE AND RELOCATE DMS
|
EA
|
1.000
|
$20,861.000
|
$24,896.000
|
$15,750.000
|
$13,000.000
|
|
|
FURNISH AND INSTALL RWIS
|
EA
|
1.000
|
$11,800.000
|
$30,000.000
|
$26,500.000
|
$25,000.000
|
|
|
ALL-IN-ONE ATMOSPHERIC SENSOR
|
EA
|
1.000
|
$2,000.000
|
$25,000.000
|
$22,500.000
|
$20,000.000
|
|
|
TEMP Q-DETECT (TY2) (1 SYS)
|
DAY
|
1,912.000
|
$79.000
|
$46.000
|
$20.000
|
$45.270
|
|
|
TEMP CONSTR EQUIPMENT ALERT SYS
|
EA
|
4.000
|
$12,000.000
|
$24,500.000
|
$20,600.000
|
$24,478.000
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYSTEM
|
EA
|
2.000
|
$50,000.000
|
$53,200.000
|
$27,200.000
|
$53,136.000
|
|
Totals: |
$266,923,464.900
|
$211,592,480.040
|
$215,615,197.060
|
$221,909,705.810
|