Show Job Controls
Bid Cobra

WHARTON US 59 (0089-07-166)

Items: 293

County: WHARTON
Length: 5.2670 MILES (4.9351 MILES)
Highway: US 59
District: YOAKUM
Control Number: 0089-07-166
DBE Goal: 0.0%
Project: F 2B26(054)
Guaranty: $100,000.00
Time: SEE PROPOSAL BOOK FOR DAYS
Engineer's Estimate: $241,162,764.90
Date: 08/05/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263049
Type: CONVERT NON-FREEWAY
Project ID: A00218975
Contract Type: FEDERAL
Project Description: UPGRADE TO RURAL FREEWAY (FUTURE I-69 CORRIDOR) CONSTRUCT MAIN LANES, FRONTAGE ROADS AND STRUCTURES TO CONVERT 4 LANE DIVIDED HIGHWAY TO 6 LANE DIVIDED FREEWAY WITH 2 LANE FRONTAGE ROADS IN EACH DIRECTION.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$241,162,764.90
Over/Under Est: -22.94% -$55,330,984.85
$201,227,572.06
Over/Under Est: -16.56% -$39,935,192.84
Amt Left: 8.28% $15,395,792.01
Over/Under Est: -18.67% -$45,013,759.06
Amt Left: 5.55% $10,317,225.79
Delta: 2.52% $5,078,566.22

Bid Items & Bid Tabulations

293 Total 0 of 293
WHARTON  |  US 59  |  YOAKUM  |  0089-07-166  |  08/05/2026 1:00 PM CDT  |  $241,162,764.90  |  F 2B26(054)  |  CONVERT NON-FREEWAY
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
WEBBER, LLC
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 278.000 $70,000.000 $66,800.000 $70,000.000 $19,500.000
REMOV CONC (PAV)
SY 122,869.000 $10.000 $8.000 $8.000 $5.590
REMOV CONC (RIPRAP)
CY 10,718.000 $55.000 $7.000 $20.000 $17.180
RMV (4") TRT/UNTRT BASE & ASPH PAV
SY 126,163.000 $3.000 $3.500 $3.000 $1.720
RMV (12") TRT/UNTRT BASE & ASPH PAV
SY 95,031.000 $8.000 $6.000 $6.000 $3.770
EXCAV (ROADWAY)
CY 330,027.000 $15.000 $19.000 $9.000 $8.360
EMBANK (FNL)(DC)(TY C)
CY 744,615.000 $20.000 $13.000 $5.000 $15.900
EMBANK (FNL)(DC)(TY C1)
CY 115,931.000 $90.000 $50.000 $150.000 $117.350
EMBANK (FNL)(DC)(TY C2)
CY 317,835.000 $16.000 $17.000 $8.000 $20.120
BACKFILL (TY B)
STA 350.200 $200.000 $2,000.000 $1,250.000 $351.570
FURN & PLACE TOPSOIL (4")
SY 5,000.000 $6.000 $3.000 $2.500 $0.850
BROADCAST SEED (PERM_RURAL_CLAY)
SY 50,000.000 $0.330 $0.250 $0.150 $0.100
DRILL SEED (PERM_RURAL_CLAY)
SY 904,631.000 $0.250 $0.250 $0.150 $0.120
DRILL SEED (TEMP_WARM)
SY 452,315.500 $0.200 $0.250 $0.100 $0.070
DRILL SEED (TEMP_COOL)
SY 452,315.500 $0.200 $0.250 $0.100 $0.070
VEGETATIVE WATERING
TGL 7,625.800 $35.000 $25.000 $44.000 $50.620
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 5,000.000 $4.000 $1.000 $0.900 $1.500
FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS)
CY 53,491.000 $105.000 $65.000 $115.000 $112.920
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 2,960.000 $360.000 $350.000 $400.000 $335.690
LIME TRT (EXIST MATL)(6")
SY 179,677.000 $2.000 $2.500 $3.500 $4.340
LIME TRT (EXIST MATL)(8")
SY 51,283.000 $7.000 $4.000 $4.500 $4.340
CEMENT
TON 2,960.000 $224.000 $220.000 $125.000 $185.130
CEMENT TRT (EXIST MATL)(6")
SY 179,677.000 $2.500 $2.500 $1.000 $2.530
CEMENT TRT (EXIST MATL)(8")
SY 51,283.000 $5.500 $4.000 $2.000 $2.530
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
SY 349,085.000 $18.000 $6.000 $15.300 $17.820
ASPHALT TRT BASE (GR 4)(PG 64)
TON 19,269.000 $130.000 $146.300 $138.000 $131.250
SALV HAUL & STKPL RCL APH PV (6")
SY 221,194.000 $6.000 $3.990 $3.600 $2.200
PRIME COAT (MC-30)
GAL 24,653.000 $8.000 $5.280 $5.500 $5.250
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 32,879.000 $4.000 $4.620 $3.850 $3.680
AGGR (TY-PB, GR-4)(SAC-B)
CY 1,080.000 $130.000 $151.250 $238.000 $226.800
D-GR HMA TY-B PG64-22
TON 22,978.000 $115.000 $128.000 $140.000 $133.350
D-GR HMA TY-B PG64-22 (LEVEL-UP)
TON 2,439.000 $95.000 $132.000 $143.000 $136.500
D-GR HMA TY-D SAC-B PG70-22
TON 25,700.000 $130.000 $139.000 $161.000 $153.300
TACK COAT
GAL 21,305.000 $5.000 $3.740 $3.650 $3.470
CONC PVMT (CRCP) (10")
SY 106,629.000 $120.000 $60.000 $73.000 $79.600
CONC PVMT (CRCP) (14")
SY 227,535.000 $125.000 $60.000 $85.000 $111.010
CUT & RESTORE ASPH PAVING
SY 1,963.000 $200.000 $120.000 $154.000 $176.780
CEM STABIL BKFL
CY 15,883.000 $161.000 $75.000 $91.250 $112.360
TRENCH EXCAVATION PROTECTION
LF 2,218.000 $13.000 $2.000 $20.000 $10.920
TEMPORARY SPL SHORING
SF 98,730.000 $30.000 $10.000 $2.250 $0.520
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 10.000 $25,000.000 $50,000.000 $20,000.000 $50,000.000
DRILL SHAFT (18 IN)
LF 465.000 $150.000 $150.000 $178.000 $82.210
DRILL SHAFT (24 IN)
LF 25.000 $245.000 $160.000 $175.000 $223.090
DRILL SHAFT (30 IN)
LF 1,664.000 $300.000 $200.000 $187.000 $202.460
DRILL SHAFT (36 IN)
LF 20,406.000 $300.000 $300.000 $229.000 $279.120
DRILL SHAFT (42 IN)
LF 744.000 $315.000 $350.000 $310.000 $402.790
DRILL SHAFT (84 IN)
LF 792.000 $1,250.000 $1,200.000 $1,310.000 $1,557.210
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 35.000 $115.000 $125.000 $131.000 $125.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 950.000 $400.000 $458.000 $478.000 $550.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 40.000 $605.000 $617.000 $624.000 $500.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 137.000 $1,100.000 $1,158.000 $960.000 $700.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 200.000 $250.000 $293.000 $224.000 $230.000
CL A CONC (COLLAR)
EA 16.000 $1,233.000 $2,627.000 $2,500.000 $3,208.560
CL C CONC (ABUT)
CY 1,253.200 $1,250.000 $1,300.000 $1,500.000 $928.150
CL C CONC (CAP)
CY 1,138.500 $1,400.000 $900.000 $1,500.000 $1,199.970
CL C CONC (COLUMN)
CY 595.800 $1,500.000 $1,900.000 $1,500.000 $914.270
CL C CONC (RAIL FOUNDATION)
CY 225.000 $800.000 $400.000 $828.000 $606.350
CL C CONC (SIGN COLUMN)
CY 337.660 $750.000 $1,500.000 $2,250.000 $2,194.900
CL C CONC (MISC)
CY 426.000 $2,000.000 $2,249.000 $2,000.000 $1,621.980
CL F CONC (CAP)
CY 161.800 $2,500.000 $1,500.000 $2,000.000 $1,284.060
CL F CONC (COLUMN)
CY 270.000 $1,650.000 $1,200.000 $2,000.000 $1,858.850
CL C CONC (SIGN FOOTING)
CY 117.600 $650.000 $1,400.000 $1,500.000 $1,079.810
REINF CONC SLAB
SF 299,688.000 $24.000 $20.000 $23.750 $20.770
APPROACH SLAB
CY 2,115.710 $625.000 $500.000 $800.000 $549.220
SHEAR KEY
CY 372.900 $1,000.000 $500.000 $425.000 $218.450
RET WALL (MSE) (HORIZONTAL SCHEME)
SF 195,749.000 $50.000 $40.000 $37.000 $39.190
RETAINING WALL (TEMP WALL)
SF 120,622.000 $14.000 $20.000 $0.750 $16.830
PRESTR CONC GIRDER (TX28)
LF 15,788.520 $200.000 $100.000 $165.000 $166.750
PRESTR CONC GIRDER (TX34)
LF 992.500 $220.000 $105.000 $167.000 $191.470
PRESTR CONC GIRDER (TX54)
LF 16,233.660 $230.000 $125.000 $192.000 $200.390
PRESTR CONC GIRDER (TX70)
LF 1,193.160 $443.000 $160.000 $234.000 $244.890
PRESTR CONC BOX BEAM (4B28)
LF 6,439.500 $250.000 $140.000 $265.000 $283.440
PRESTR CONC BOX BEAM (5B28)
LF 715.500 $300.000 $150.000 $265.000 $281.600
RIPRAP (CONC)(4 IN)
CY 565.650 $700.000 $650.000 $675.000 $407.570
RIPRAP (CONC) (CL B) (4 IN)
CY 4.000 $745.000 $650.000 $1,000.000 $609.020
RIPRAP (MOW STRIP)(4 IN)
CY 243.000 $550.000 $650.000 $685.000 $602.340
RIPRAP (STONE PROTECTION)(12 IN)
CY 208.000 $226.000 $250.000 $450.000 $263.940
RIPRAP (STONE PROTECTION)(18 IN)
CY 13,166.000 $200.000 $200.000 $250.000 $226.350
RAIL (TY SSTR)
LF 23,952.600 $60.000 $60.000 $88.000 $54.140
ARMOR JOINT (SEALED)
LF 84.000 $131.000 $150.000 $193.000 $115.260
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 2,695.000 $200.000 $175.000 $229.000 $183.690
CMP (GAL STL 36 IN)
LF 216.000 $120.000 $114.200 $118.000 $127.830
CONC BOX CULV (5 FT X 2 FT)
LF 1,338.000 $416.000 $349.100 $331.000 $331.830
CONC BOX CULV (5 FT X 3 FT)
LF 535.000 $525.000 $370.950 $923.000 $349.190
CONC BOX CULV (6 FT X 2 FT)
LF 1,094.000 $604.000 $394.800 $379.000 $384.570
CONC BOX CULV (6 FT X 3 FT)
LF 3,328.000 $850.000 $433.250 $424.000 $434.850
CONC BOX CULV (7 FT X 3 FT)
LF 110.000 $844.000 $566.100 $524.000 $517.610
CONC BOX CULV (7 FT X 7 FT)
LF 774.000 $870.000 $732.400 $671.000 $696.720
CONC BOX CULV (8 FT X 3 FT)
LF 640.000 $747.000 $606.900 $570.000 $585.970
CONC BOX CULV (8 FT X 4 FT)
LF 1,488.000 $824.000 $629.350 $613.000 $615.180
CONC BOX CULV (9 FT X 4 FT)
LF 656.000 $871.000 $767.450 $750.000 $717.810
CONC BOX CULV (10 FT X 4 FT)
LF 3,085.000 $1,344.000 $917.500 $861.000 $861.240
CONC BOX CULV (10 FT X 6 FT)
LF 1,690.000 $1,000.000 $1,007.100 $969.000 $949.000
RC PIPE (CL III)(18 IN)
LF 3,833.000 $93.000 $115.500 $119.000 $59.080
RC PIPE (CL III)(24 IN)
LF 1,754.000 $130.000 $90.650 $119.000 $66.600
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $10,000.000 $3,754.000 $5,580.000 $4,140.870
INLET (COMPL)(PMBD)(5FT)
EA 47.000 $7,000.000 $9,058.000 $6,920.000 $6,416.710
INLET (COMPL)(POD)(SFG)(4FTX4FT)
EA 32.000 $7,710.000 $11,241.000 $16,250.000 $10,503.660
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 8.000 $12,000.000 $7,159.000 $10,310.000 $7,077.450
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $50,000.000 $114,559.000 $49,500.000 $57,998.130
SET (PIPE RUNNER)
EA 217.000 $2,500.000 $737.000 $2,050.000 $1,588.130
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C)
EA 3.000 $7,872.000 $13,291.000 $21,060.000 $3,428.010
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
EA 3.000 $12,500.000 $13,586.000 $18,710.000 $3,428.010
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1)(P)
EA 6.000 $9,000.000 $16,999.000 $17,320.000 $3,266.610
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C)
EA 3.000 $4,000.000 $14,929.000 $18,600.000 $3,360.520
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C)
EA 3.000 $12,800.000 $14,683.000 $18,120.000 $3,360.520
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1)(C)
EA 6.000 $14,560.000 $13,044.000 $13,260.000 $1,993.950
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 22.000 $16,800.000 $11,751.000 $11,810.000 $1,925.580
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
EA 4.000 $12,000.000 $15,833.000 $15,670.000 $3,062.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
EA 14.000 $14,200.000 $14,170.000 $18,060.000 $3,097.830
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1)(P)
EA 2.000 $2,500.000 $56,427.000 $21,670.000 $6,124.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1)(C)
EA 5.000 $13,100.000 $14,619.000 $16,070.000 $2,951.740
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1)(C)
EA 5.000 $21,529.000 $17,072.000 $16,070.000 $2,951.740
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C)
EA 12.000 $13,206.000 $18,308.000 $13,970.000 $3,375.560
SET (TY I)(S= 9 FT)(HW= 5 FT)(4:1)(C)
EA 8.000 $17,000.000 $24,800.000 $18,150.000 $4,631.430
SET (TY I)(S= 10 FT)(HW= 5 FT)(4:1)(C)
EA 24.000 $25,000.000 $26,410.000 $18,430.000 $4,840.780
SET (TY I)(S= 10 FT)(HW= 8 FT)(3:1)(C)
EA 5.000 $30,000.000 $22,059.000 $19,790.000 $5,526.260
SET (TY I)(S= 10 FT)(HW= 8 FT)(4:1)(C)
EA 5.000 $30,000.000 $27,612.000 $19,790.000 $5,526.260
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 35.000 $1,396.000 $2,470.000 $1,700.000 $2,084.290
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 23.000 $1,300.000 $2,948.000 $1,770.000 $2,334.730
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,150.000 $2,642.000 $1,790.000 $2,350.720
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,990.000 $3,313.000 $1,970.000 $3,128.670
SET (TY II) (24 IN) (TP) (4: 1) (C)
EA 5.000 $2,000.000 $2,642.000 $1,800.000 $2,537.210
SET (TY II) (36 IN) (CMP) (6: 1) (C)
EA 6.000 $4,000.000 $4,039.000 $3,080.000 $2,393.340
REMOV STR (BOX CULVERT)
EA 8.000 $7,000.000 $31,616.000 $36,080.000 $26,375.790
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 8.000 $100,000.000 $25,000.000 $1.000 $53,853.260
REMOVE STR (RAIL)
LF 2,828.000 $29.000 $10.000 $1.000 $27.800
REMOV STR (PIPE)
EA 37.000 $3,000.000 $3,479.000 $2,000.000 $1,033.860
MOBILIZATION
LS 1.000 $26,000,000.000 $20,372,874.000 $20,000,000.000 $19,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 32.000 $7,500.000 $20,000.000 $3,660.000 $14,073.700
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $14,000.000 $1,000.000 $6,000.000 $9,591.280
TMA (STATIONARY)
DAY 210.000 $200.000 $100.000 $424.000 $235.320
TMA (MOBILE OPERATION)
DAY 100.000 $250.000 $200.000 $838.000 $620.700
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 8,160.000 $35.000 $32.000 $36.000 $42.690
ROCK FILTER DAMS (REMOVE)
LF 8,160.000 $17.000 $12.000 $12.600 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,981.000 $5.000 $3.000 $3.550 $2.780
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,981.000 $1.250 $1.000 $0.800 $0.990
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,711.000 $5.000 $7.000 $5.250 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,711.000 $1.500 $1.000 $1.100 $0.990
CONSTRUCTING DETOURS
SY 46,179.000 $60.000 $150.000 $130.000 $115.100
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 13,501.000 $15.000 $7.000 $10.000 $11.860
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 860.000 $18.000 $30.000 $25.000 $7.500
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 120.000 $26.000 $30.000 $30.000 $11.860
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 44,615.000 $9.000 $6.000 $2.100 $6.020
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,500.000 $8.000 $7.000 $20.000 $5.550
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 360.000 $10.000 $7.000 $20.000 $5.690
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 240.000 $17.000 $20.000 $25.000 $14.830
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $23.000 $20.000 $30.000 $9.730
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 13,501.000 $28.000 $9.000 $10.000 $5.700
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 860.000 $13.000 $10.000 $25.000 $7.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 120.000 $19.000 $10.000 $30.000 $7.950
PCTB (STKPL)(F-SHAPE OR SNGL SLP)TY1
LF 1,035.000 $20.000 $10.000 $10.000 $9.510
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,725.000 $74.000 $60.000 $156.000 $63.780
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 13,845.000 $149.000 $90.000 $104.000 $80.980
PERM CTB(SS)(42")(HEB)(RGD PVM)
LF 966.000 $265.000 $90.000 $628.000 $206.130
CONC CURB & GUTTER (TY II)
LF 285.000 $34.000 $29.570 $42.000 $44.180
CONC CURB (SLOTTED)
LF 373.000 $28.000 $37.660 $25.000 $36.000
DRIVEWAYS (CONC)
SY 189.000 $130.000 $250.000 $119.000 $137.280
DRIVEWAYS (ACP) (TY 1)
SY 657.000 $33.000 $110.000 $71.250 $91.130
DRIVEWAYS (BASE)
SY 837.000 $25.000 $55.000 $42.250 $42.230
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 1,790.000 $3.500 $5.000 $20.000 $6.080
MTL W-BEAM GD FEN (TIM POST)
LF 432.000 $28.000 $29.280 $29.300 $29.280
REMOVE METAL BEAM GUARD FENCE
LF 2,322.000 $3.000 $3.250 $3.250 $3.250
CABLE BARRIER (REMOVE)
LF 21,752.000 $4.500 $4.520 $4.500 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,650.000 $3,644.000 $3,640.000 $3,650.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $321.000 $275.000 $275.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 38.000 $1,526.000 $3,800.000 $3,800.000 $3,800.000
CRASH CUSH ATTEN (STKPL)
EA 5.000 $1,140.000 $3,200.000 $3,200.000 $3,200.000
CRASH CUSH ATTEN (REMOVE)
EA 15.000 $935.000 $1,800.000 $1,800.000 $1,800.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 26.000 $32,500.000 $23,550.000 $23,550.000 $23,550.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 15.000 $9,000.000 $9,750.000 $9,750.000 $9,750.000
PIPE UNDERDRAINS (TY 6) (6")
LF 9,824.000 $20.000 $30.000 $63.750 $33.250
REMOVE RD IL ASM (SHOE-BASE)
EA 2.000 $850.000 $2,099.000 $500.000 $450.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 3.000 $3,700.000 $1,071.500 $1,850.000 $1,800.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 27.000 $5,000.000 $4,571.000 $4,580.000 $4,850.000
HI MST IL POLE (125 FT)(100 MPH)
EA 5.000 $101,300.000 $50,812.000 $55,200.000 $52,000.000
LED HI MST IL ASM (6 FIXT) (TY A)
EA 5.000 $30,000.000 $41,577.000 $37,320.000 $43,000.000
CONDT (PVC) (SCH 40) (2")
LF 320.000 $12.000 $9.200 $10.100 $9.000
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 24,450.000 $14.000 $8.100 $16.600 $12.500
CONDT (PVC) (SCH 80) (2")
LF 10,550.000 $14.500 $13.750 $10.700 $10.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,607.000 $25.000 $19.240 $14.700 $12.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 6,120.000 $25.000 $32.930 $28.800 $30.000
CONDT (RM) (1")
LF 500.000 $35.000 $19.200 $22.200 $18.000
CONDT (RM) (3")
LF 2,980.000 $63.000 $64.600 $96.000 $48.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 24,450.000 $24.000 $16.150 $24.700 $17.500
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 4,800.000 $27.000 $42.470 $41.500 $58.000
ITS MULTI-DUCT CND (RMC)
LF 4,300.000 $106.000 $87.210 $109.000 $140.000
FIBER OPTIC CABLE ROAD MARKER
EA 36.000 $158.000 $245.240 $120.000 $750.000
ELEC CONDR (NO.14) INSULATED
LF 17,210.000 $1.000 $1.500 $0.750 $1.500
ELEC CONDR (NO.12) BARE
LF 4,872.000 $1.200 $1.900 $1.500 $1.800
ELEC CONDR (NO.12) INSULATED
LF 9,774.000 $1.500 $2.000 $1.600 $1.900
ELEC CONDR (NO.8) BARE
LF 1,645.000 $1.900 $1.800 $2.150 $2.250
ELEC CONDR (NO.8) INSULATED
LF 3,530.000 $2.250 $2.110 $2.400 $2.400
ELEC CONDR (NO.6) BARE
LF 7,075.000 $2.200 $2.530 $2.600 $2.550
ELEC CONDR (NO.6) INSULATED
LF 14,180.000 $2.600 $3.000 $2.900 $2.750
ELEC CONDR (NO.4) BARE
LF 1,195.000 $3.000 $3.200 $3.400 $2.900
ELEC CONDR (NO.4) INSULATED
LF 2,740.000 $3.400 $3.640 $3.750 $3.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 34.000 $4,600.000 $4,576.000 $5,110.000 $4,900.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 1.000 $8,719.000 $8,296.000 $7,850.000 $6,500.000
GROUND BOX TY A (122311)W/APRON
EA 57.000 $1,500.000 $1,209.000 $965.000 $950.000
ELC SRV TY A 120/240 060(NS)SS(E)GC(U)
EA 3.000 $13,000.000 $11,042.000 $8,110.000 $9,000.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
EA 2.000 $9,010.000 $11,762.000 $8,010.000 $9,200.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $7,770.000 $6,773.000 $6,910.000 $8,888.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 2.000 $6,524.000 $6,830.000 $7,110.000 $8,900.000
ALUMINUM SIGNS (TY A)
SF 35.000 $35.000 $36.000 $10.700 $10.650
ALUMINUM SIGNS (TY G)
SF 382.000 $30.000 $31.500 $38.250 $38.140
ALUMINUM SIGNS (TY O)
SF 2,110.000 $35.000 $33.000 $26.200 $28.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 118.000 $925.000 $510.000 $510.000 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 10.000 $627.000 $575.000 $575.000 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 56.000 $935.000 $660.000 $660.000 $660.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,023.000 $710.000 $710.000 $710.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $940.000 $850.000 $840.000 $840.000
REMOVE SM RD SN SUP&AM
EA 4.000 $110.000 $175.000 $125.000 $125.000
INSTALL LRSS (STRUCT STEEL)
LB 2,006.000 $7.000 $8.540 $10.600 $10.550
REMOVE LRSA
EA 6.000 $350.000 $1,950.000 $250.000 $250.000
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $45,000.000 $56,928.000 $65,200.000 $56,000.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 1.000 $21,000.000 $23,872.000 $26,620.000 $22,000.000
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
EA 11.000 $32,000.000 $29,671.000 $27,150.000 $27,400.000
SIGN WALKWAY (36 IN) NO HNDRL
LF 31.000 $338.000 $538.000 $397.000 $580.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 199.000 $11.000 $22.000 $22.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 44.000 $20.000 $22.000 $22.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 174.000 $19.000 $22.000 $22.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 5.000 $19.000 $22.000 $22.000 $22.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $125.000 $130.000 $130.000 $130.000
INSTL OM ASSM (OM-4)(TWT)WAS
EA 8.000 $298.000 $295.000 $295.000 $295.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 70,703.000 $1.150 $1.500 $1.500 $1.500
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 3,274.000 $1.600 $2.000 $2.000 $2.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 88,519.000 $0.800 $0.770 $0.750 $0.770
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 148.000 $15.000 $8.500 $8.500 $8.500
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 3.000 $1,222.000 $450.000 $450.000 $450.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 101,751.000 $0.800 $0.780 $0.800 $0.780
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 10,941.000 $7.500 $1.400 $1.400 $1.400
RE PM TY III (W)(6")(SLD)
LF 43,386.000 $4.000 $0.950 $0.950 $0.950
RE PM TY III (W)(6")(BRK)
LF 6,949.000 $5.500 $1.000 $1.000 $1.000
RE PM TY III (W)(6")(DOT)
LF 1,866.000 $1.100 $1.000 $1.000 $1.000
RE PM TY III (W)(8")(SLD)
LF 14,152.000 $1.100 $1.500 $1.500 $1.500
RE PM TY III (W)(8")(DOT)
LF 516.000 $1.100 $2.000 $2.000 $2.000
RE PM TY III (W)(12")(SLD)
LF 2,295.000 $4.000 $4.000 $4.000 $4.000
RE PM TY III (Y)(6")(SLD)
LF 41,283.000 $4.000 $0.950 $0.950 $0.950
RE PM TY III (Y)(12")(SLD)
LF 116.000 $5.500 $4.000 $4.000 $4.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 48,425.000 $1.000 $0.950 $0.950 $0.950
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 10,941.000 $1.000 $0.950 $0.950 $0.950
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 50,704.000 $0.600 $0.950 $0.950 $0.950
PAVEMENT SLER 6"
LF 131,509.000 $1.000 $0.400 $0.400 $0.400
PAVEMENT SLER 8"
LF 14,421.000 $0.350 $0.800 $0.800 $0.800
PREFAB PM TY C (W)(24")(SLD)
LF 387.000 $14.000 $16.850 $16.900 $16.850
PREFAB PM TY C (W)(ARROW)
EA 5.000 $223.000 $230.000 $230.000 $230.000
PREFAB PM TY C (W)(DBL ARROW)
EA 5.000 $414.000 $445.000 $445.000 $445.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 1.000 $332.000 $475.000 $475.000 $475.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $550.000 $640.000 $640.000 $640.000
PREFAB PM TY C (W)(WORD)
EA 5.000 $294.000 $350.000 $350.000 $350.000
REFL PAV MRKR TY I-C
EA 72.000 $4.500 $6.000 $6.000 $6.000
REFL PAV MRKR TY II-A-A
EA 307.000 $4.500 $6.000 $6.000 $6.000
REFL PAV MRKR TY II-C-R
EA 2,496.000 $5.000 $6.000 $6.000 $6.000
ELIM EXT PM & MRKS (6")
LF 173,426.000 $0.450 $0.450 $0.450 $0.450
ELIM EXT PM & MRKS (24")
LF 74.000 $5.000 $4.000 $4.000 $4.000
ELIM EXT PM & MRKS (ARROW)
EA 4.000 $60.000 $55.000 $55.000 $55.000
PAV SURF PREP FOR MRK (6")
LF 214,495.000 $0.250 $0.060 $0.050 $0.060
PAV SURF PREP FOR MRK (8")
LF 14,668.000 $0.300 $0.120 $0.100 $0.120
PAV SURF PREP FOR MRK (12")
LF 2,411.000 $0.320 $0.180 $0.200 $0.180
PAV SURF PREP FOR MRK (24")
LF 387.000 $1.000 $0.360 $0.350 $0.360
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $80.000 $7.000 $7.000 $7.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 5.000 $160.000 $5.000 $5.000 $5.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 1.000 $25.000 $15.000 $15.000 $15.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $20.000 $7.000 $7.000 $7.000
REMOVE (QUAD - ELITE) NARROW
EA 1.000 $23.000 $1,800.000 $1,020.000 $1,650.000
NO. OF WORKING DAYS
$/D 27,405.000 $940.000 $940.000 $525.000 $940.000
TIP TESTING(DRILL SHAFT)
EA 40.000 $8,500.000 $8,000.000 $7,500.000 $4,250.000
SYSTEM INTEGRATION
LS 1.000 $11,712.000 $9,006.000 $10,000.000 $14,000.000
ITS RVSD SYSTEM (DATA COLLECTION ONLY)
EA 3.000 $11,272.000 $12,034.000 $12,720.000 $9,500.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 3.000 $6,800.000 $7,650.000 $6,980.000 $7,500.000
ITS POLE (55 FT)(110 MPH)
EA 3.000 $20,645.000 $23,170.000 $23,360.000 $26,300.000
DEAD END ROADWAY BARRICADE
LF 24.000 $111.000 $84.500 $84.500 $84.500
GROUND BOX (PREPARE)
EA 1.000 $341.000 $494.000 $100.000 $2,500.000
TEMP SPEED MONITOR SYS
EA 4.000 $15,064.000 $19,035.000 $16,500.000 $19,035.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 3.000 $990.000 $7,601.000 $2,250.000 $2,200.000
CCTV MOUNT (PEDESTAL)
EA 3.000 $390.000 $1,041.000 $100.000 $850.000
ETHERNET SWITCH (INSTALL ONLY)
EA 5.000 $454.000 $408.000 $500.000 $1,200.000
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 26,640.000 $2.700 $2.230 $1.650 $3.750
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 11.000 $1,100.000 $700.000 $2,300.000 $2,800.000
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 23,130.000 $3.750 $4.250 $4.000 $5.800
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 2.000 $5,000.000 $4,651.250 $5,890.000 $12,000.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 2.000 $574.000 $2,013.000 $1,390.000 $6,500.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 4,230.000 $20.000 $18.250 $5.000 $18.250
INSTALLATION OF BLUETOOTH READER
EA 3.000 $722.000 $778.000 $625.000 $1,800.000
INSTALLATION OF TERMINAL SERVER
EA 3.000 $1,000.000 $331.000 $625.000 $1,400.000
ITS GRND MNT CAB (TY 6)(CONF 2)
EA 1.000 $16,111.000 $15,184.000 $17,990.000 $18,000.000
REMOVE AND RELOCATE DMS
EA 1.000 $20,861.000 $24,896.000 $15,750.000 $13,000.000
FURNISH AND INSTALL RWIS
EA 1.000 $11,800.000 $30,000.000 $26,500.000 $25,000.000
ALL-IN-ONE ATMOSPHERIC SENSOR
EA 1.000 $2,000.000 $25,000.000 $22,500.000 $20,000.000
TEMP Q-DETECT (TY2) (1 SYS)
DAY 1,912.000 $79.000 $46.000 $20.000 $45.270
TEMP CONSTR EQUIPMENT ALERT SYS
EA 4.000 $12,000.000 $24,500.000 $20,600.000 $24,478.000
TEMP INCIDENT DETECT & SURVEIL SYSTEM
EA 2.000 $50,000.000 $53,200.000 $27,200.000 $53,136.000
Totals: $266,923,464.900 $211,592,480.040 $215,615,197.060 $221,909,705.810
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $20,160.00
MATERIAL FURNISHED BY THE STATE (PART) $200,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $200,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $800,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $200,000.00
Total: $1,420,160.00