PREPARING ROW
|
STA
|
31.000
|
$4,000.000
|
$10,000.000
|
$17,150.000
|
$1,850.000
|
$18,000.000
|
$11,425.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,688.000
|
$15.000
|
$12.000
|
$6.940
|
$11.000
|
$25.000
|
$19.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
5,316.000
|
$15.000
|
$12.000
|
$3.610
|
$11.000
|
$15.000
|
$19.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
26,306.000
|
$20.000
|
$10.000
|
$8.820
|
$12.000
|
$19.300
|
$30.000
|
|
|
|
BLADING
|
HR
|
56.000
|
$125.000
|
$40.000
|
$141.330
|
$125.000
|
$143.000
|
$100.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
1,596.000
|
$20.000
|
$15.000
|
$4.520
|
$50.000
|
$35.000
|
$12.000
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
38,198.000
|
$0.500
|
$0.150
|
$0.240
|
$0.500
|
$0.290
|
$0.240
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
9,550.000
|
$0.500
|
$0.150
|
$0.240
|
$0.500
|
$0.290
|
$0.180
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
9,550.000
|
$0.500
|
$0.150
|
$0.240
|
$0.500
|
$0.290
|
$0.180
|
|
|
|
VEGETATIVE WATERING
|
MG
|
108.000
|
$35.000
|
$30.000
|
$35.790
|
$100.000
|
$28.800
|
$35.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
5,194.000
|
$1.250
|
$1.500
|
$1.890
|
$2.750
|
$1.450
|
$1.250
|
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,963.400
|
$88.000
|
$130.000
|
$116.290
|
$110.000
|
$105.000
|
$182.000
|
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
108.300
|
$210.000
|
$285.000
|
$303.240
|
$300.000
|
$281.000
|
$225.000
|
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
6,825.000
|
$4.000
|
$2.000
|
$4.980
|
$5.000
|
$3.000
|
$7.000
|
|
|
|
CEMENT
|
TON
|
65.200
|
$200.000
|
$150.000
|
$323.750
|
$300.000
|
$260.000
|
$255.000
|
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
6,825.000
|
$4.000
|
$2.000
|
$3.620
|
$5.000
|
$2.200
|
$7.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,584.000
|
$5.500
|
$5.700
|
$5.830
|
$10.000
|
$10.000
|
$9.000
|
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
152.000
|
$180.000
|
$405.000
|
$420.870
|
$550.000
|
$300.000
|
$320.000
|
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
56.000
|
$180.000
|
$380.000
|
$393.890
|
$550.000
|
$300.000
|
$380.000
|
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
7,642.000
|
$5.000
|
$5.000
|
$5.290
|
$10.000
|
$5.000
|
$6.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
167.000
|
$150.000
|
$150.000
|
$100.690
|
$225.000
|
$140.000
|
$240.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,886.000
|
$40.000
|
$50.000
|
$37.650
|
$50.000
|
$42.000
|
$55.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,952.000
|
$275.000
|
$300.000
|
$233.010
|
$360.000
|
$237.000
|
$275.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
49.600
|
$1,300.000
|
$1,500.000
|
$1,500.000
|
$1,250.000
|
$1,025.000
|
$1,600.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
81.200
|
$1,250.000
|
$1,500.000
|
$1,500.000
|
$1,450.000
|
$1,190.000
|
$1,600.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
52.400
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
$1,600.000
|
$1,038.000
|
$1,400.000
|
|
|
|
REINF CONC SLAB
|
SF
|
20,700.000
|
$25.000
|
$20.000
|
$30.000
|
$23.000
|
$23.000
|
$24.000
|
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
3,132.500
|
$165.000
|
$234.000
|
$164.000
|
$225.000
|
$160.500
|
$175.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,494.000
|
$175.000
|
$115.000
|
$185.260
|
$165.000
|
$144.000
|
$278.000
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
936.000
|
$90.000
|
$90.000
|
$104.170
|
$100.000
|
$67.000
|
$100.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
136.000
|
$150.000
|
$150.000
|
$205.680
|
$200.000
|
$196.000
|
$220.000
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$60,000.000
|
$160,000.000
|
$109,000.000
|
$105,000.000
|
$86,000.000
|
$75,000.000
|
|
|
|
REMOV STR (SMALL)
|
EA
|
4.000
|
$1,200.000
|
$500.000
|
$854.090
|
$1,000.000
|
$2,900.000
|
$1,300.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$503,000.000
|
$570,000.000
|
$440,000.000
|
$630,000.000
|
$635,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,500.000
|
$2,000.000
|
$2,100.000
|
$2,500.000
|
$10,000.000
|
$2,000.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,098.000
|
$3.000
|
$3.000
|
$3.750
|
$3.000
|
$1.500
|
$5.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,098.000
|
$1.000
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
$1.500
|
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
990.000
|
$35.000
|
$90.000
|
$64.780
|
$75.000
|
$60.000
|
$23.000
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$12.000
|
$5.000
|
$3.570
|
$15.000
|
$7.000
|
$34.000
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
990.000
|
$8.000
|
$8.000
|
$8.450
|
$15.000
|
$10.000
|
$21.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
680.000
|
$50.000
|
$54.000
|
$82.180
|
$95.000
|
$57.000
|
$50.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
8,053.000
|
$0.500
|
$0.500
|
$0.350
|
$1.000
|
$2.000
|
$0.850
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
4,064.000
|
$0.500
|
$0.500
|
$0.350
|
$1.000
|
$2.000
|
$1.100
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$28.000
|
$31.330
|
$27.800
|
$30.000
|
$28.000
|
$24.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,200.000
|
$2,100.000
|
$1,900.000
|
$2,500.000
|
$2,105.000
|
$2,600.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
560.000
|
$2.000
|
$3.000
|
$0.500
|
$5.000
|
$2.000
|
$2.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$200.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,080.000
|
$3,200.000
|
$3,245.000
|
$3,700.000
|
$3,200.000
|
$3,100.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$300.000
|
$225.000
|
$400.000
|
$150.000
|
$300.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,800.000
|
$3,000.000
|
$1,500.000
|
$1,000.000
|
$2,850.000
|
$1,000.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,200.000
|
$600.000
|
$500.000
|
$900.000
|
$500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,500.000
|
$9,900.000
|
$8,400.000
|
$9,000.000
|
$9,500.000
|
$7,500.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$275.000
|
$600.000
|
$200.000
|
$400.000
|
$285.000
|
$300.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$750.000
|
$1,074.410
|
$1,050.000
|
$1,250.000
|
$1,062.500
|
$1,100.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$600.000
|
$627.110
|
$565.000
|
$1,250.000
|
$575.000
|
$600.000
|
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$250.000
|
$295.740
|
$150.000
|
$350.000
|
$150.000
|
$165.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$100.000
|
$100.000
|
$50.000
|
$150.000
|
$80.000
|
$80.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
78.000
|
$22.000
|
$50.000
|
$18.000
|
$50.000
|
$25.000
|
$25.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
15.000
|
$44.000
|
$15.000
|
$12.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
26.000
|
$30.000
|
$30.000
|
$30.000
|
$50.000
|
$32.000
|
$32.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
15,378.000
|
$1.100
|
$1.350
|
$1.350
|
$1.500
|
$1.220
|
$1.400
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,010.000
|
$1.100
|
$1.350
|
$1.350
|
$1.500
|
$1.220
|
$1.400
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
862.000
|
$2.200
|
$2.000
|
$1.670
|
$2.250
|
$6.000
|
$2.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
69.000
|
$6.750
|
$10.000
|
$10.000
|
$15.000
|
$0.280
|
$10.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,120.000
|
$1.000
|
$0.700
|
$0.700
|
$1.000
|
$0.830
|
$0.750
|
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
3,492.000
|
$2.000
|
$1.000
|
$2.030
|
$2.000
|
$0.950
|
$10.000
|
|
|
|
D-GR HMA TY-B PG76-22
|
TON
|
2,109.400
|
$110.000
|
$122.000
|
$128.420
|
$220.000
|
$150.000
|
$157.000
|
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,577.800
|
$115.000
|
$123.000
|
$129.500
|
$220.000
|
$150.000
|
$180.000
|
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
1,541.700
|
$115.000
|
$128.000
|
$135.970
|
$220.000
|
$150.000
|
$180.000
|
|
|
|
TACK COAT
|
GAL
|
2,821.000
|
$5.000
|
$2.500
|
$2.430
|
$5.000
|
$10.000
|
$4.400
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$10,000.000
|
$8,093.660
|
$11,000.000
|
$20,000.000
|
$10,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$400.000
|
$631.300
|
$320.000
|
$370.000
|
$350.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$600.000
|
$883.510
|
$250.000
|
$72.000
|
$350.000
|
|
|
|
HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MIL
|
LF
|
8,953.000
|
$1.000
|
$2.250
|
$2.250
|
$2.500
|
$0.990
|
$2.300
|
|
|
|
HPPM-RIB W/RET REQ TYI(Y)4"(BRK)100MIL
|
LF
|
1,129.000
|
$1.000
|
$2.250
|
$2.250
|
$2.500
|
$4.000
|
$2.300
|
|
|
|
HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MIL
|
LF
|
914.000
|
$1.000
|
$2.250
|
$2.250
|
$2.500
|
$0.990
|
$2.300
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,013.000
|
$1.000
|
$0.170
|
$0.170
|
$1.000
|
$0.320
|
$0.170
|
|
1
|
|
CMP (GAL STL 24 IN)
|
LF
|
40.000
|
$100.000
|
$82.870
|
$106.040
|
$0.000
|
$117.000
|
$0.000
|
|
1
|
|
CMP (GAL STL 36 IN)
|
LF
|
326.000
|
$135.000
|
$94.300
|
$118.760
|
$0.000
|
$126.000
|
$0.000
|
|
1
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,600.000
|
$1,468.500
|
$1,450.820
|
$0.000
|
$4,900.000
|
$0.000
|
|
1
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$2,500.000
|
$4,219.500
|
$1,862.600
|
$0.000
|
$4,900.000
|
$0.000
|
|
1A
|
|
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
|
EA
|
2.000
|
$1,600.000
|
$0.000
|
$0.000
|
$2,000.000
|
$4,900.000
|
$3,000.000
|
|
1A
|
|
SET (TY II) (36 IN) (HDPE) (6: 1) (P)
|
EA
|
12.000
|
$2,500.000
|
$0.000
|
$0.000
|
$3,750.000
|
$4,900.000
|
$5,000.000
|
|
1A
|
|
THERMO PIPE(24")(PP)(TY S)(TY II)
|
LF
|
40.000
|
$100.000
|
$0.000
|
$0.000
|
$60.000
|
$157.000
|
$91.000
|
|
1A
|
|
THERMO PIPE(36")(PP)(TY S)(TY II)
|
LF
|
326.000
|
$135.000
|
$0.000
|
$0.000
|
$90.000
|
$140.000
|
$120.000
|
|
Totals: |
$5,403,703.150
|
$5,657,394.780
|
$5,702,313.315
|
$6,273,879.500
|
$6,452,053.340
|
$7,037,843.680
|