|
|
PREPARING ROW
|
STA
|
14.000
|
$4,500.000
|
$2,150.000
|
$1,500.000
|
$2,732.800
|
$3,000.000
|
$4,400.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
260.000
|
$22.000
|
$16.000
|
$20.000
|
$31.500
|
$75.000
|
$52.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
21,900.000
|
$12.000
|
$14.120
|
$12.000
|
$22.100
|
$20.000
|
$29.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
323.940
|
$550.000
|
$330.810
|
$350.000
|
$654.900
|
$400.000
|
$370.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
176.000
|
$25.000
|
$24.000
|
$29.000
|
$36.800
|
$100.000
|
$75.000
|
|
|
BLADING
|
HR
|
50.000
|
$150.000
|
$100.000
|
$100.000
|
$196.800
|
$200.000
|
$210.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
107,979.000
|
$0.300
|
$0.230
|
$0.250
|
$0.250
|
$0.250
|
$0.300
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
26,995.000
|
$0.200
|
$0.190
|
$0.250
|
$0.210
|
$0.190
|
$0.300
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
26,995.000
|
$0.200
|
$0.190
|
$0.250
|
$0.210
|
$0.190
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
908.900
|
$25.000
|
$20.000
|
$10.000
|
$21.000
|
$15.000
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
24,956.000
|
$87.000
|
$111.260
|
$114.600
|
$124.750
|
$125.000
|
$140.000
|
|
|
CEMENT
|
TON
|
1,089.000
|
$220.000
|
$225.000
|
$230.000
|
$247.500
|
$250.000
|
$244.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
119,500.000
|
$3.900
|
$2.780
|
$1.600
|
$2.280
|
$2.000
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
21,024.000
|
$5.000
|
$5.230
|
$6.840
|
$5.360
|
$5.500
|
$5.000
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
751.000
|
$150.000
|
$143.190
|
$195.000
|
$130.800
|
$240.000
|
$364.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
1,237.000
|
$130.000
|
$137.200
|
$203.000
|
$167.850
|
$185.000
|
$208.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
809.000
|
$130.000
|
$137.200
|
$172.000
|
$168.260
|
$180.000
|
$216.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
77,649.000
|
$5.000
|
$4.440
|
$6.350
|
$5.140
|
$5.250
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,000.000
|
$75.000
|
$50.390
|
$105.000
|
$74.800
|
$75.000
|
$77.000
|
|
|
CEM STABIL BKFL
|
CY
|
22.000
|
$125.000
|
$150.000
|
$200.000
|
$203.000
|
$250.000
|
$224.000
|
|
|
CUT & RESTORING PAV
|
SY
|
32.000
|
$200.000
|
$90.000
|
$250.000
|
$332.610
|
$250.000
|
$280.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
112.000
|
$175.000
|
$161.000
|
$70.000
|
$95.520
|
$115.000
|
$84.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
28.000
|
$185.000
|
$175.000
|
$130.000
|
$120.420
|
$140.000
|
$146.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
24.000
|
$190.000
|
$226.000
|
$325.000
|
$162.670
|
$180.000
|
$364.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
60.000
|
$250.000
|
$198.000
|
$300.000
|
$131.800
|
$150.000
|
$336.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
64.000
|
$550.000
|
$561.000
|
$800.000
|
$510.320
|
$650.000
|
$897.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
12.000
|
$775.000
|
$1,195.000
|
$1,000.000
|
$1,214.630
|
$1,400.000
|
$1,120.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
12.000
|
$120.000
|
$250.000
|
$150.000
|
$108.700
|
$125.000
|
$168.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$210.000
|
$400.000
|
$450.000
|
$231.280
|
$275.000
|
$504.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$7,500.000
|
$8,315.000
|
$18,000.000
|
$19,102.060
|
$22,000.000
|
$20,200.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,900.000
|
$8,900.000
|
$20,000.000
|
$15,904.970
|
$18,000.000
|
$22,400.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
18.000
|
$1,750.000
|
$1,680.000
|
$1,000.000
|
$1,640.650
|
$2,000.000
|
$1,350.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,900.000
|
$2,140.000
|
$1,200.000
|
$1,446.680
|
$2,200.000
|
$1,350.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,250.000
|
$2,104.000
|
$2,000.000
|
$2,165.120
|
$2,500.000
|
$2,200.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$3,500.000
|
$4,186.000
|
$4,000.000
|
$6,971.680
|
$7,500.000
|
$4,900.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,800.000
|
$5,196.000
|
$4,000.000
|
$10,314.350
|
$11,000.000
|
$4,900.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$2,350.000
|
$2,450.000
|
$3,000.000
|
$4,053.730
|
$4,500.000
|
$3,900.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$850.000
|
$946.000
|
$2,500.000
|
$1,376.060
|
$2,000.000
|
$2,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$522,000.000
|
$272,513.000
|
$450,000.000
|
$595,338.450
|
$700,000.000
|
$445,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,500.000
|
$3,071.410
|
$1,800.000
|
$5,623.210
|
$15,000.000
|
$1,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$40.000
|
$41.320
|
$45.000
|
$44.620
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$11.000
|
$15.820
|
$15.000
|
$17.080
|
$10.000
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,210.000
|
$5.000
|
$7.420
|
$6.000
|
$8.010
|
$6.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,210.000
|
$1.250
|
$1.300
|
$1.000
|
$1.400
|
$2.000
|
$2.000
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
225.000
|
$55.000
|
$28.950
|
$36.000
|
$60.200
|
$60.000
|
$5.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
260.000
|
$120.000
|
$83.000
|
$180.000
|
$103.410
|
$115.000
|
$147.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
5,947.000
|
$43.650
|
$29.100
|
$54.000
|
$60.200
|
$35.000
|
$22.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
886.000
|
$45.000
|
$34.850
|
$44.000
|
$60.200
|
$30.000
|
$3.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
8.000
|
$450.000
|
$550.000
|
$450.000
|
$573.340
|
$650.000
|
$465.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
35.000
|
$250.000
|
$185.000
|
$325.000
|
$218.410
|
$225.000
|
$200.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
4.000
|
$375.000
|
$225.000
|
$450.000
|
$245.720
|
$275.000
|
$220.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$850.000
|
$750.000
|
$800.000
|
$819.050
|
$900.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
65.000
|
$440.000
|
$410.000
|
$398.000
|
$420.450
|
$500.000
|
$415.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
66.000
|
$100.000
|
$75.000
|
$95.000
|
$81.910
|
$100.000
|
$62.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
14.000
|
$125.000
|
$75.000
|
$75.000
|
$120.130
|
$90.000
|
$105.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
97,182.000
|
$0.500
|
$0.440
|
$0.450
|
$0.480
|
$0.600
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
23,484.000
|
$0.500
|
$0.420
|
$0.450
|
$0.450
|
$0.600
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
17,232.000
|
$0.500
|
$0.420
|
$0.450
|
$0.450
|
$0.600
|
$0.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,905.000
|
$1.500
|
$1.750
|
$1.500
|
$1.780
|
$1.000
|
$0.550
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
64,788.000
|
$0.800
|
$0.900
|
$0.950
|
$0.970
|
$1.050
|
$0.950
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
7,828.000
|
$0.800
|
$1.100
|
$0.950
|
$1.190
|
$1.300
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
5,744.000
|
$0.800
|
$1.100
|
$0.950
|
$1.190
|
$1.300
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
15.000
|
$17.000
|
$16.000
|
$25.000
|
$17.280
|
$20.000
|
$24.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
463.000
|
$4.000
|
$5.000
|
$6.350
|
$5.400
|
$6.000
|
$6.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$4,500.000
|
$20,282.880
|
$12,000.000
|
$20,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$275.000
|
$200.000
|
$175.000
|
$293.570
|
$250.000
|
$425.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$275.000
|
$275.000
|
$250.000
|
$293.570
|
$275.000
|
$950.000
|
|
Totals: |
$5,784,243.750
|
$5,786,574.011
|
$6,444,276.810
|
$7,187,701.086
|
$7,269,659.400
|
$7,591,870.450
|