WHARTON VARIOUS (0913-09-132)
Items: 83
County: WHARTON
Length: 1.2660 MILES
Highway: VARIOUS
District: YOAKUM
Control Number: 0913-09-132
DBE Goal: 6.0%
Project: STP 2B24(465)TAPS
Guaranty: $51,000.00
Time: 158 WORKING DAYS
Engineer's Estimate: $2,558,830.58
Date: 06/05/2025 1:00 PM CDT (1 year ago)
Contract Number: 6253225
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206896
Contract Type: FEDERAL
Project Description: THE PROJECT WILL CONSTRUCT MORE THAN 1-MILE OF 6-FOOT-WIDE SIDEWALKS WITHIN THE EXISTING RIGHT-OF-WAY. IT WILL REMOVE EXISTING SUBSTANDARD SIDEWALKS, ADA RAMPS AND DRIVEWAYS TO CONSTRUCT THE IMPROVED PEDESTRIAN PATWAYS.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SIMPER
PAUL RODRIGUEZ
WHARTON VARIOUS (0913-09-132)
Project Name: N/A
Project: STP 2B24(465)TAPS
Length: 1.2660 MILES
Project Class: CONSTRUCTION
Limits From: FIRST ST/RAILROAD ST (ADJACENT TO SH 71)
Limits To: MAIN ST/NORTH LIBERTY ST (ON BU 59S)
Project Description: THE PROJECT WILL CONSTRUCT MORE THAN 1-MILE OF 6-FOOT-WIDE SIDEWALKS WITHIN THE EXISTING RIGHT-OF-WAY. IT WILL REMOVE EXISTING SUBSTANDARD SIDEWALKS, ADA RAMPS AND DRIVEWAYS TO CONSTRUCT THE IMPROVED PEDESTRIAN PATWAYS.
Bidders (6)
E
Engineer's Estimate
$2,558,830.58
1
Awarded
$2,130,273.30
Over/Under Est:
-16.75%
-$428,557.28
$2,142,703.83
Over/Under Est:
-16.26%
-$416,126.75
Amt Left:
0.58%
$12,430.53
$2,205,475.00
Over/Under Est:
-13.81%
-$353,355.58
Amt Left:
3.53%
$75,201.70
Delta:
-2.93%
-$62,771.17
$2,573,813.97
Over/Under Est:
0.59%
$14,983.39
Amt Left:
20.82%
$443,540.67
Delta:
-16.70%
-$368,338.97
$2,737,621.50
Over/Under Est:
6.99%
$178,790.92
Amt Left:
28.51%
$607,348.20
Delta:
-6.36%
-$163,807.53
$3,182,905.00
Over/Under Est:
24.39%
$624,074.42
Amt Left:
49.41%
$1,052,631.70
Delta:
-16.27%
-$445,283.50
Bid Items & Bid Tabulations
83
Total
0 of 83
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
| Description | Amount |
|---|---|
| EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) | $500.00 |
| SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) | $1,000.00 |
| Total: | $1,500.00 |